Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations Project stage: Acceptance Review 2023-11-03
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) Primary and Secondary Liability Insurance ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML17226A3202017-08-21021 August 2017 Acceptance of Requested Licensing Action, Proposed Changes to Administrative Controls Section of the Technical Specifications for Permanently Defueled Condition ML17184A0932017-07-13013 July 2017 Acceptance Review Letter, Request for Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures in an Emergency or During Severe Weather ML17100A7842017-04-11011 April 2017 Acceptance Review Letter, Request for Approval of Certified Fuel Handler Training and Retraining Program ML16253A2212016-09-13013 September 2016 Results of Acceptance Review for License Amendment Request Regarding Control Rod Drive Exercise Surveillance ML14338A6742014-12-0808 December 2014 Acceptance Review License Amendment Request for Approval of Palisades Nuclear Plant 10 CFR 50 Appendix G Equivalent Margins Analysis (Tac No. MF5163) ML13329A5022013-11-20020 November 2013 LIC-109 Acceptance of Palisades Nuclear Plant'S 10 CFR 50 Appendix G Equivalent Margins Analysis - MF2962 ML1208905462012-03-29029 March 2012 LIC-109 Acceptance Review - Palisades - LAR - Replacement of Spent Fuel Pool Region I Storage Racks - ME8074 ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1112506382011-05-0303 May 2011 LIC-109 Acceptance Review - ME5997 - Palisades - LAR to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1023204192010-08-26026 August 2010 Acceptance Review for Implementation of EAL Schemes ML1005701902010-02-25025 February 2010 LIC-109 Acceptance Review - Palisades Request for Exemption from Physical Security Requirements - 10 CFR Part 73 - ME3080 ML0931703722009-11-13013 November 2009 Acceptance Review of Entergy'S Request to Extend Orders (TAC ME1515 - ME2522) ML0930602832009-09-18018 September 2009 Email from Mahesh Chawla Regarding Acceptance Review of License Amendment Request for One-Time Extension to the Integrated Leak Rate Test Interval ML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2024-01-23
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
November 3, 2023 Ms. Jean A. Fleming Vice President, Licensing, Regulatory Affairs, and PSA Holtec International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104
SUBJECT:
PALISADES NUCLEAR PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REQUEST FOR EXEMPTION FROM 10 CFR 50.82(a)(2) TO SUPPORT REAUTHORIZATION OF POWER OPERATIONS (EPID L-2023-LLE-0025)
Dear Ms. Fleming:
By letter dated September 28, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23271A140), Holtec Decommissioning International, LLC (HDI) submitted a request for an exemption from portions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.82, Termination of license, paragraph (a)(2) for Palisades Nuclear Plant. Specifically, HDI is requesting an exemption from the requirement in 10 CFR 50.82(a)(2) providing that the 10 CFR Part 50 license no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel upon docketing of the certifications for permanent cessation of operations and permanent removal of fuel from the reactor vessel that were submitted in accordance with 10 CFR 50.82(a)(1). HDI states that the exemption request, in combination with future license amendment requests (LARs) and NRC approval of an order to transfer operational authority, are necessary to reauthorize placement of fuel into the reactor vessel and reauthorize power operations at Palisades Nuclear Plant. The LARs and the request to transfer operational authority are anticipated to be submitted to NRC over the next several months.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC or Commission) staffs acceptance review of the exemption request. In accordance with 10 CFR 50.12, Specific exemptions, the Commission may, upon application by any interested person or upon its own initiative, grant an exemption from the requirements of the regulations in Part 50 (1) if the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security, and (2) if special circumstances are present. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical safety review. The acceptance review is also intended to identify whether the exemption request application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
J. Fleming The NRC staff has reviewed your application and concluded that it provides technical safety information in sufficient detail to enable the NRC staff to complete its detailed technical safety review. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical safety review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical safety review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
With respect to the environmental information in the exemption request, by letter dated September 28, 2023, you provided information in support of your determination that a categorical exclusion in accordance with 10 CFR 51.22(c)(25), was satisfied by the exemption request. However, because the exemption request and the future requests for license amendments and to transfer operational authority are connected actions that are all necessary to reauthorize placement of fuel into the reactor vessel and reauthorize power operations at Palisades Nuclear Plant, the NRC staff will make a determination on its regulatory obligations under the National Environmental Policy Act once all associated requests have been received by the NRC.
Based on the information provided in your submittal and discussions during the pre-licensing meeting on August 29, 2023 (ML23235A180), the NRC staff has estimated that this exemption request will require approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete the safety review. With respect to your requested completion schedule of December 31, 2024, the NRC staff believes that it will complete the safety review by then. If the NRC staff determines that the exemption meets applicable requirements, the issuance and effective dates would be further communicated to you and would depend on the prerequisite conditions for restart, such as receipt and review of the other aspects of the Palisades Nuclear Plant reauthorization of power operations effort, including the license transfer application and license amendment requests to update the operating license, technical specifications, and emergency plan. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be provided to you via separate correspondence.
If you have any questions, please contact the me at (301) 415-2048 or via email at Justin.Poole@nrc.gov.
Sincerely,
/RA/
Justin C. Poole, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Listserv
ML23291A440 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA OGC - NLO NMSS/REFS/ENRB/PM NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME JPoole ABaxter MSpencer LWillingham JWhited JPoole DATE 10/18/2023 10/19/2023 11/03/2023 11/02/2023 11/03/2023 11/03/2023