05/20/10 Summary of Meeting with Northern States Power Co. Minnesota to Discuss the NRCs Assessment of the Safety Performance of Prairie Island Nuclear Generating Plant for the Period from January 1, 2009, Through December 31, 2009
ML101470904
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/27/2010
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
Northern States Power Co
References
Download: ML101470904 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota

FACILITY: Prairie Island Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT

On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives

to discuss the NRC's assessment of the safe ty performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions.

The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286).

The licensee then provided a response to the NRC's assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA/

John B. Giessner, Chief Branch 4 Division of Reactor Projects

Docket Nos: 50-282; 50-306;72-010 License Nos: DPR-42; DPR-60; SNM-2506

Enclosure:

As Stated

cc w/encl: Distribution via ListServ PUBLIC MEETING PRINCIPAL ATTENDEES May 20, 2010

Nuclear Regulatory Commission

S. West, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII K. Stoedter, Senior Resident Inspector, Prairie Island P. Zurawski, Resident Inspector, Prairie Island M. Phalen, Health Physicist, Division of Reactor Safety, RIII A. Barker, Government Liaison Officer, RIII H, Logaras, Government Liaison Officer, RIII D. Betancourt-Roldan, Reactor Engineer, Division of Reactor Projects, RIII T. Wengert, Project Manager, Office of Nuclear Reactor Regulation S. Brusehaver, Resident Office Assistant, Prairie Island

Northern States Power Company, Minnesota

M. Schimmel, Site Vice President B. Sawatzke, Site Operations Director K. Ryan, Plant Manager D. Kettering, Engineering Director S. Northard, Recovery Manager

Other Attendees

E. Ludy, Republican Eagle D. Buttler, Public J. Howe, Mayor of Red Wing S. Howlett, City of Red Wing

J. Stine, Minnesota Department of Health P. Mahowald, Prairie Island Indian Community M. T. Murphy, MN AFL-CIO H. Westra, Prairie Island Indian Community M. Schultz, City of Red Wing

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota

FACILITY: Prairie Island Nuclear Generating Plant

SUBJECT:

SUMMARY

OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT

On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives

to discuss the NRC's assessment of the safe ty performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions.

The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286).

The licensee then provided a response to the NRC's assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA/ John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306;72-010 License Nos: DPR-42; DPR-60; SNM-2506

Enclosure:

As Stated cc w/encl: Distribution via ListServ

DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Prairie Island EOC 09 Public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt-Roldan:dtp JGiessner DATE 05/27/10 05/27/10 OFFICIAL RECORD COPY Letter to Northern States Power Company, Minnesota from J. Giessner dated May 27, 2010.

SUBJECT:

SUMMARY

OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT

DISTRIBUTION:

Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker

Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource