Public Meeting Summary to Discuss the 2013 Performance of Prairie Island Nuclear Generating Plant Units 1 and 2
ML14223A801
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/11/2014
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To:
References
20141119
Download: ML14223A801 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 U.S. Nuclear Regulatory Commission Public Meeting Summary August 11, 2014

Title:

Public Meeting to Discuss the 2013 Performance of Prairie Island Nuclear Generating Plant Units 1 and 2 Meeting Identifier: 20141119 Date of Meeting: Thursday, July 17, 2014 Location: Red Wing Public Library, Red Wing, MN Type of Meeting: Category 3 Purpose of Meeting:

Discuss the Nuclear Regulatory Commission (NRC) end-of-cycle assessment of Prairie Island Nuclear Generating Plant, Unit 1 and 2, performance for the 2013 calendar year.

General Details:

The NRC conducted an open house beginning at 6:00 p.m. central daylight time (CDT) where members of the public met informally with NRC staff to discuss Prairie Islands performance and NRC oversight. The meeting was scheduled from 6:00-8:00 p.m. CDT and ended about 8:00 p.m.

Three NRC staff members were present, including the Deputy Director, Division of Reactor Projects; Branch Chief; and the Prairie Island Senior Resident Inspector. No facilitator was needed.

NRC staff members greeted attendees as they arrived and offered a description of the purpose of the meeting and discussion of the Prairie Island 2013 performance. Prairie Island operated safely in 2013, with no significant inspection findings. Copies of the NRCs 2013 assessment letter were available. Contact information for the Prairie Island Resident Inspectors and meeting feedback forms were also provided.

Approximately 5 people participated in the meeting. In addition to NRC and licensee staff, meeting participants included a representative from the Minnesota Public Utilities Commission, a representative from the City of Red Wing, the attorney for the Prairie Island Indian Community, a reporter from the Red Wing Republican Eagle, and a representative from the State of Wisconsin Emergency Management Agency.

Summary of Presentations:

No formal presentations were made. NRC posters describing the NRCs mission and the reactor oversight process complemented NRC staff member one-on-one discussions with the public. The flexible structure encouraged participants to discuss topics of interest to them with different NRC staff members spread around the room. These discussions included how the NRC assessed Prairie Islands 2013 performance and the NRCs oversight of the facility.

Public Participation Themes:

None.

Action Items/Next Steps:

None.

Attachments:

None.

/RA/___________________

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. NPF-42; DPR-60

Enclosures:

List of Principal Meeting Attendees cc w/encl: Distribution via LISTSERV

PUBLIC MEETING PRINCIPAL ATTENDEES July 17, 2014 NRC Attendees K. OBrien, Deputy Director, Division of Reactor Projects, Branch 2 K. Riemer, Chief, Division of Reactor Projects, Branch 2 K. Stoedter, Prairie Island Senior Resident Inspector Xcel Energy Company Attendees K. Davidson, Site Vice President S. Sharp, Director of Site Operations J. Hallenbeck, Engineering Director C. Younie, Plant Manager T. Allen, Assistant Plant Manager Enclosure

Summary of Presentations:

No formal presentations were made. NRC posters describing the NRCs mission and the reactor oversight process complemented NRC staff member one-on-one discussions with the public. The flexible structure encouraged participants to discuss topics of interest to them with different NRC staff members spread around the room. These discussions included how the NRC assessed Prairie Islands 2013 performance and the NRCs oversight of the facility.

Public Participation Themes:

None.

Action Items/Next Steps:

None.

Attachments:

None.

/RA/___________________

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. NPF-42; DPR-60

Enclosures:

List of Principal Meeting Attendees cc w/encl: Distribution via LISTSERV DISTRIBUTION:

See next page DOCUMENT NAME: Prairie Island 2013 EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME NShah:mt KRiemer DATE 08/11/14 08/11/14 OFFICIAL RECORD COPY

Memorandum from Kenneth Riemer dated August 11, 2014.

Subject:

Prairie Island End-of-Cycle Meeting Summary DISTRIBUTION w/encl: