L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
– Preparation and Scheduling of Operator Licensing Examinations
ML24180A247
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/28/2024
From: Bremer J
Northern States Power Company, Minnesota, Xcel Energy
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-PI-24-036, RIS 2024-01
Download: ML24180A247 (1)


Text

1717 Wakonade Drive Welch, MN 55089 L-PI-24-036 RIS 2024-01 June 28, 2024 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 NRC Regulatory Issue Summary 2024 Preparation and Scheduling of Operator Licensing Examinations As requested by NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations, dated March 5, 2024, Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy, hereby submits the operator licensing examination data for calendar years 2025 through 2028 for the Prairie Island Nuclear Generating Plant. Enclosed is the corresponding NRC Form 536 which provides the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

James R. Bremer Regulatory Affairs Manager, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc:

Administrator, Region III, USNRC Region III, ATTN: Operations Branch USNRC Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC

ENCLOSURE NRC FORM 536 OPERATING LICENSING EXAMINATION DATA FOR CY 2025 THROUGH 2028 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT 1 AND 2 1 Page to Follow

NRC FORM 536 (01-16-2024)

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 01/31/2027 Estimated burden per response to comply with this voluntary information collection request: 45 minutes.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; email: oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.

FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (01-16-2024)

Prairie Island Nuclear Generating Plant III 2025 1

0 2026 0

0 2027 1

0 2028 0

0 2025 5

10 2

0 11/10/2025 10/13/2025 2026 2027 6

10 2

0 10/11/2027 10/25/2027 2028