ML24128A257

From kanterella
Jump to navigation Jump to search

ISFSI A13 Acceptance Letter
ML24128A257
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 05/16/2024
From: Janice Nguyen
Storage and Transportation Licensing Branch
To: Conboy T
Northern States Power Company, Minnesota
References
EPID L-2024-LLA-0020
Download: ML24128A257 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Thomas A. Conboy, Site Vice President Prairie Island Nuclear Generating Co.

Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642

SUBJECT:

PRAIRIE ISLAND LICENSE AMENDMENT REQUEST - ACCEPTED FOR REVIEW (EPID NO. L-2024-LLA-0020)

Dear Thomas A. Conboy:

By letter dated April 2, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24095A075), Northern States Power Company (NSPM) submitted to the U.S. Nuclear Regulatory Commission (NRC) an amendment request to the special nuclear materials (SNM) license number 2506 for the Prairie Island Independent Spent Fuel Storage Installation (ISFSI). The proposed amendment request seeks to change License Conditions 23(a), 24(A)(2), and 24(B)(2). The subject license conditions are management activities with specified inspection intervals of three months or one quarter. The inspection intervals are not to exceed every quarter for license condition 23 and not to exceed three months for license condition 24. This is inconsistent with similar ISFSI technical specifications (TS) surveillance requirements (SRs), for example, SR 3.1.4.1 and SR 3.1.4.2, which give the frequency as 92 days, and ISFSI TS SR 3.0.2, which allows up to 1.25 times the interval specified in the frequency. NSPM proposes to revise the license conditions to describe the inspection intervals similar to TS surveillance requirement frequency, allowing up to 1.25 times the specified intervals to account for scheduling challenges, including but not limited to periods of extreme cold weather or other high-priority plant activities.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to complete its detailed review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements, and the protection of public health and safety, and the environment. This letter acknowledges acceptance of your application.

We have established a schedule for the review and estimated that the staff may need approximately 340 staff review hours. The schedule allows for the staff to complete its technical review and issue a request for additional information (RAI) in August 2024, and to issue its safety evaluation report (SER) in January 2025, based on you responding to the first RAI in September 2024. If no RAI is needed, the staffs SER may be completed earlier.

May 16, 2024

T. A. Conboy 2

In general, no additional changes to the application should be submitted except for changes resulting from your response to an RAI. Please reference Docket No. 72-10 and EPID L-2024-LLA-0020 in future correspondence related to the acceptance review for this licensing action. If you have any questions regarding this matter, please contact me at (301) 415-0262.

Sincerely, John-Chau Nguyen, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-10 License No. SNM-2506 EPID No. L-2024-LLA-0020 Signed by Nguyen, Chau on 05/16/24

ML24128A257 OFFICE NMSS NMSS NMSS NMSS NAME JNguyen WWheatley BWhite for YDiaz-Sanabria JNguyen DATE 5/13/24 5/15 /24 5/15/18 5/16 /24