Summary of September 26, 2019, Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt TSTF-505, Revision 2
ML19289A532
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/28/2019
From: Robert Kuntz
Plant Licensing Branch III
To:
Kuntz R
References
EPID L-2019-LRM-0061
Download: ML19289A532 (3)


Text

October 28, 2019 LICENSEE: Northern States Power Company FACILITY: Prairie Island Nuclear Generating Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF SEPTEMBER 26, 2019, TELECONFERENCE WITH NORTHERN STATES POWER COMPANY ON POTENTIAL LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505, REVISION 2 PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4b (EPID L-2019-LRM-0061)

On September 26, 2019, a Category 1 public teleconference was held between the U.S.

Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company (NSPM, the licensee). The purpose of the meeting was to discuss a potential license amendment request (LAR) to adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, for the Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP). The meeting notice and agenda, dated September 12, 2019, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19255E025. A list of attendees is provided in the Enclosure.

The licensee presented information (ADAMS Accession No. ML19268A042) related to the potential LAR. The licensee presented an overview of the planned amendment including the schedule for submittal.

The NRC staff commented on the variations described in the presentation. Specifically, the NRC staff stated that the licensee should include as much detail as possible in describing the variations in the amendment request. Also, the NRC staff also commented that the amendment request should include what design basis parameter is being controlled by the relevant technical specification.

Members of the public were in attendance. No comments were provided to the NRC staff.

Please direct any inquiries to me at 301-415-3733, or Robert.Kuntz@nrc.gov.

/RA/

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-282 and 50-306

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES SEPTEMBER 26, 2019 TELECONFERENCE WITH NORTHERN STATES POWER COMPANY POTENTIAL LICENSE AMENDMENT REQUEST TO ADOPT TSTF-505, REVISION 2, PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4b PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 Nuclear Regulatory Commission Robert Kuntz Casey Smith Jonathan Evans Stephen Dinsmore Kevin Pusateri Shilp Vasavada Mihaela Biro Northern States Power Company (NSPM)

Sara Scott Peter Gohdes Mark Brossart Brian Slack Salma Mahzooni Steve Ingalls NSPM Contractor (Enercon)

Tom Morgan Public Justin Hiller, Ameren Missouri James K. Liming, ABSG Consulting Inc.

Enclosure

Meeting Summary ML19289A532 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME RKuntz SRohrer NSalgado RKuntz DATE 10/21/19 10/16/19 10/24/19 10/28/19