ML15061A401

From kanterella
Revision as of 02:17, 21 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan)
ML15061A401
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/04/2015
From: Arthur Burritt
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A
References
FOIA/PA-2016-0148 IR 2014001
Download: ML15061A401 (5)


See also: IR 05000247/2014001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

March 4, 2015

Mr. Larry Coyle

Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 10511-0249

SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND

05000286/2014001)

Dear Mr. Coyle:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-

cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The

NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection

results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto

r Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the last nine months of the inspection plan are tentative and may be

revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage

Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel

availability issues. The NRC will contact you as

soon as possible to dis

cuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not

include security-related inspections, which will be sent via separate, non-publicly available correspondence.

L. Coyle 2

In accordance with Title 10 of the Code of Federal Regulations , Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact

me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/ Arthur L. Burritt, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-247 and 50-286

License Nos. DPR-26 and DPR-64

Enclosure: Indian Point 2 & 3 Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML15061A401

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 02/23/15 03/02/15

Page 1 of 2

03/02/2015

15:16:39 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on Site Indian PointInspection / Activity Plan

01/01/2015

-06/30/20165/11EXAM-U3 INITIAL OL EXAM

5 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U01908 04/13/2015

04/17/2015

3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM

U0190805/11/2015

05/15/201571124-RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 02/09/2015

02/13/2015

2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/09/2015

02/13/201571124-HP 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015

03/06/2015

3 IP Occupational ALARA Planning and Controls71124.02 03/02/2015

03/06/20157111108P-U3 INSERVICE INSPECTION

1 3 IP Inservice Inspection Activities - PWR7111108P 03/09/2015

03/20/201571152-GROUNDWATER MONITORING

5 2 IP Problem Identification and Resolution71152 05/04/2015

05/07/201571124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/07/2015

05/13/2015

2, 3 IP Occupational ALARA Planning and Controls71124.02 05/07/2015

05/13/20157111107T-TRIENNIAL HEAT SINK

1 2, 3 IP Heat Sink Performance7111107T 07/06/2015

07/10/2015

CDBI-COMPONENT DESIGN BASIS INSPECTION

8 2, 3 IP Component Design Bases Inspection7111121 07/20/2015

07/24/2015

2, 3 IP Component Design Bases Inspection7111121 08/03/2015

08/07/2015

2, 3 IP Component Design Bases Inspection7111121 08/17/2015

08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS

2 3 IP Licensed Operator Requalification Program7111111B 09/21/2015

09/25/201571124-HP 1 2, 3 IP Occupational Dose Assessment71124.04 08/10/2015

08/14/2015

2, 3 IP Radiation Monitoring Instrumentation71124.05 08/10/2015

08/14/2015

2, 3 IP Performance Indicator Verification71151 08/10/2015

08/14/2015

EP-EP PROGRAM INSPECTION

1 2, 3 IP A lert and Notification System Testing7111402 08/17/2015

08/21/2015

2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/17/2015

08/21/2015

2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/17/2015

08/21/2015

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 2 of 2

03/02/2015

15:16:39 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on Site Indian PointInspection / Activity Plan

01/01/2015

-06/30/2016

ISFSI-ISFSI LOADING INSPECTION

2 2, 3 IP Operation Of An ISFSI

60855 08/17/2015

08/21/2015

2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1 08/17/2015

08/21/2015

2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION

1 3 IP Review of License Renewal Activities

2516/00111/16/201511/20/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL

4 2, 3 IP Problem Identification and Resolution71152B11/30/2015

12/04/2015

2, 3 IP Problem Identification and Resolution71152B 12/14/2015

12/18/201571124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016

2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016

ISI-U2 INSERVICE INSPECTION

1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016

03/25/2016

EP-EP EXERCISE EVALUATION

4 2, 3 IP Exercise Evaluation7111401 06/27/2016

07/01/2016

TRI FI-TRIENNIAL FIRE PROTECTION

4 2, 3 IP Fire Protection [Triennial]7111105T 05/23/2016

05/27/2016

2, 3 IP Fire Protection [Triennial]7111105T 06/06/2016

06/10/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/20/2016

06/24/2016

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.