Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
DOCKET NO.Tuqke Point UNIT MONTH MARCH, 1 9 8 1 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)DAY AVERAGE DAILY POWER I.EVEL (i>>(We.Net
)l7 70 o3 10 a5 26 I3 l3 l5 l6'>9 30 3l INSTRUCTIONS On this format.list the aspera(le daily unit p>>wer Ie>el in MWe-Net ('r each day tn the rep<>rtinR nb>nth.C>>rnpute to the nearest whole megawatt.(o(77'I OPERATING STATUS OPERATING DATA REPORT OOCKKTNO~0-2 0 DATE~~1981 COMPLETED BY 5f'~~son TELEPHONE 4~~2-3824 1.Unit Name: 2.Reporting Period: March 1981 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 760 693 680 646 Notes-Unit No.3 was re-moved from service for scheduled refueling, mainte-nance, and inspections.(Continued from previous month)8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This Month Yr.-to.Date 2 160.0 1 392.0-0-1 385.6-0-3 025 277 980 415 931 002 64.1 64.1 66.7 62.2 I i.Hours In Reporting Period 744.0 12.Number Of Hours Reactor Was Critical-0-13.Reactor Reserve Shutdown Hours-0-14.Hours Generator On-Line-0-15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Generated (MWH)--0-17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)-2156 19.Unit Service Factor 20.Unit Availability Factor-0-21.Unit Capacity Factor (Using MDC Net)-0-22.Unit Capacity Factor (Using DER Net)-0-23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): Cumulative 72 945.6 55 692~8 213.4 53 891.0 121.8 109 197'55 34 693 625 32 840 487 73.9 74.0 70.0 65.0 2.4 5.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status(Prior to Commercial Operation):
Forecast Achieved IN ITIA L CRITICALITY lNITIAL ELECTRICITY COMMERCIAL OPERATION)/77)
UNIT SIIUTDOWNS AND POIVER REDUCTIONS nit No'.3 RFPORT MON fII MARCII 198l.Date IA~~r>Lu:cnscc Event Rep>>rl-" ((>((>'a Vi W (J (((>~0 Cause&.C>>rreclive Act>oil l>>Prcvcnl Recurrcncc 03 81-02-28 S 744.0'N/A RC FUHLXX Unit No.3 was removed from service for scheduled refueling, mainte-nance, and inspections.(Continued from previous month)(Nuclear and Non-nuclear systems)I I': I'(>reed S: Schedule(l ltcason'.A-Equipmenl Failure (Explain)8-hlaintenance nr Test C-Refueling D.Regulatory Restriction I'.-Opcral>>r Training&.Liccnsc Fxanlination F.Adnunislralivc G.Operational
[irror (Explain)I I.Other (Explau>)hlelhod: I.h'Ianual 2.hlanual Scram.3-Aut>>matic Sera>>1.4 0th(>r(ZmI>h>I>HContinuing 5-Load Reduction 9-Other (Explain)Exhibit G~Instructions I>>f Prcpafall>>n>>l Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I I Exhibit I-Sante S>>urcc AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turne Point UNIT o-4 COMPLETED BY hIONTH ivtARCH, 19 8 1 DAY AVERAGE DAILY POWER LEVEL I i<>I We.Net)677 676 DAY AVERAGE DAlLY POWER LEVEL (<hIWe.>Met
)73 l7 I8 675 8 IO 679 681 681 681 682 679 20 22>3 25 26 679 679 24 12 13 I4 IS I6 fNSTRUCTIONS 680 679 672'28'79 30 31 NOTE: 482 678 677 Average daily power level greater than 646 NWe due to cooler condenser cooling water.On this format.list the average daily unit p<>wer lev<'.I in Mme.Net for each day in the rep<>rring in<>nth.C<>>npute to the nearest whole megawatt.(<>r77l OPERATING DATA REPORT DOCKET NO.~~+DATE her'Ll k 1981 COMPLETED BY~~son TELEPHONE~~3824 OPERATING STATUS Notes-Unit No.4 operated at approximately 100%R.P., exCept for outage of March 22-29, 1981.I, Unit Name: Turke Point Unit No.4 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6 3 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum De endable Ca acit Net MWe: 680 p p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This Month I I.Hours In Reporting Period 744.0 12.Number Of Hours-Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 579.9-15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Generated (MWH)1 269 068 17.Gross Electrical Energy Generated (MWH)411 670 18.Net Electrical Energy Generated (MWH)389 571 19.Unit Service Factor 77.9 20.Unit Availability Factor 77.9 21.Unit Capacity Factor (Using MDC Net)81.1 22.Unit Capacity Factor (Using DER Net)75.2 23.Unit Forced Outage Rate 22.1 24.Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration Steam Ge erator Tube Insoection Pro ram-Julv Yr..to.Date 2 160.0 1 735.9-0-1 665.9-0-3 603 1'38 1 169 490 1 108 465 77.1 77.1 79.4 74.1 9.1 of Each):-Auust8 181 Cumulative 66 673.0 48 748.7 166.6 46 944'.8 31.2 97 984 493 31 142 663 29 492 485 70.4 70.5 68.7 63.8 3.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAhfE M~Mnitd~nit No.4 REPORT MON fH HARCH, 1981 VoDate N e'pic~III'iccnscc Event Rcport>A CP~CI 0 Cause A Corrcclivc Action lo Prcvcnl Rccurrcncc 05 81-03-22 F 164.1 IH n t was trzppe y steam genera or o..4Alevel protection system caused by sudden closure of feedwater control valve No.4A due to a failed coil in the feedwater control isolation system.Corrective actions include replacing failed coil.(non-nuclear system)CB HOTORX Outage was extended due tn a electrica ground indication in the power supply to reactor coolant pump motor No.4A.Corrective actions included repairing.
motor lead at the motor terminal box and modifying the motor terminal box to preclude moisture entering.(Nuclear System)I" I'a11ccd S;Schcdu!cd Reason: A-Equipmcnt Failure (Explain)B.II(ainlcnance or Test C-Refueling D.Regulatory Restriction E-Operator Training A.Uccnsc Examination F-Administrative G-Operational Lrror (Fxplain)I I-Other (Expl Ji<<)3 h(cthod: I-hlanual 2.hlanual Scratn.3.AutonlJtlc Scf Jnt.4.Other(Wnlairr)
Cont inuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Lntry Sheets for Licensee Event Report (LER)File (NUREG-Ol G I)Exhibit I-Saute Source VERAGE DAILY UNIT POWER LEVEL DOCKET NO.St.Luce.e TELEPHONE 824 MONTH MARCH, 1981 DAY AVERAGE DAILY POWER LEVEL I M We-Net)I 796 797 DAY AVERAGE DAILY POWER LEVEL IMWe-Net)797 17 798 10 795 796 795 19 20 23'4)5 2b'96 797 797 797 795 796 797 786 13 15 Ib INSTRUCTIONS 797 798 28 29 30 31 NOTE: 796 7 7 796 795 Average daily power level greater than 777 MNe due to cooler condenser cooling water.On this fortnat.list the average daily onit power le~el in ibliVe.Net for each day tn the rep<<rtillg lllonth.Cotnpute to the nearest whole megawatt.lol77)
OPERATING DATA REPORT OPERATING STATUS 822 777 1.Unit Name: St.Lucie Unit No.1 2.Reporting period: March 1981 3.Licensed Thermal Power (MWt): 4.i nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 802 6.Maximum Dependable Capacity'(Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.DgTj~~Ar11AA, 1981 COMPLETED BY V.T.Chilson TELEPHONE~~-3824 Notes-Unit operated at approximately 100%, R.P.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): IO.Reasons For Restrictions.
If Any: VONE This Month Yr.-to-Date Cumulative 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)IS.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)ZZ.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over iVext 6 Months (Type, 744.0-0-744.0-0-1 901 230 624 740 591 723 100.0 100.0 102.4 99.2 2 160.0-0-2 160.0 5 492 745 1 806 730 1 711 152 100.0 100.0 102.0 98.8 Date.and Duration of Each): 30 585.3 129.5 29 791.1.3 72 740 893 23 616 590 22 238 638 79.5 79.6 76.3 74.0 5.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Vt A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ('t//7)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.COMPLETED BY REPORT hlON fll 81 No.Dale A~V)Lit:cltscc Event Rcport>Cause k Corrective Action to Prcvcnl Recurrcncc NONE I': I'arced S: Scltedulcd
('>/77)Reason: A-Equipment Failure (Explain)B.Maintenance or Test-C-Refueling D.Regulatory Restriction E-Operator Training k.Liccnsc Examination F-Administ tat ive G-Operational Error (Fxplain)I I Other (Explain)hielhod: I hlanual 2-hlanual Scram.3.Autuntatic Scratn.4Mb~gE~pbitv}Continuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparaiion ol Data Entry Sheets for I.icctlscc Event Report (I.I:R)File (NUREG.0161)Exhibit I-Same Source