Monthly Operating Repts for Feb 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890314 Ltr
ML17347B027
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 02/28/1989
From: Bonnett D, Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-97, NUDOCS 8903240172
Download: ML17347B027 (33)


Text

RATED D~TRIkUTI ON DE M ON STPXTI ON SYSTEM REGULATOR~

INFORMATION DISTRIBUTION~STEM (RIDS)P AUTH.NAME AUTHOR AFFILIATION BONNETT,D.M.

Florida Power&Light Co.CONWAY,W.F.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION ACCESSION NBR:8903240172 DOC.DATE: 89/02/28 NOTARIZED:

NO DOCKET FACIL:50-000 Generic Docket 05000000$0-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.05000335 50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.05000389

SUBJECT:

Monthly operating repts for M89-Ggr Turkey Point Units 3&4&St Lucie Units 1&.W/890314 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED: R I ENCL/SIZE:/TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 LA EDISONgG INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR~REPj'0 EG FILE EXTERNAL'G&G SIMPSON g F LPDR NSIC COPIES LTTR ENCL 1 0 1 0 10 10 1 1 1 1 1 1 1 1 1 1 2'1 1 RECIPIENT ID CODE/NAME PD2-2 PD NORRISgJ AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EG&G WILLIAMSgS NRC PDR COPIES LTTR ENCL 5 5 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1 S'NOXE'LO ALL'KIDS" PICIPIENTS:

PIEASE HELP US 1Q REDUCE HASTE)CXRZACT'IHE DOCUMl&Z CXÃI'ROL DESK HXN Pl-37 (EXT.20079)m EIZKQCGR WAR MME PKH DZBIRUHlTIQN LIST8 FOR DOCUMEÃIS YOU DCRPT NEED)TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 31 ii 4l I s jl y l 0 P.O.Box 14000, Juno Beach, FL 33408-0420 APL MARCH 1 4 198S L-89-97 10'FR 50.36 U.S'.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St.Lucie Units 1 and 2.Very truly yours, W.F.o way Senior ice President-Nuclear WFC/DMB Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St.Lucie Plant an FPL Group company 0~,~'a J J f~~J AVERAGE DAILY UNIT POMER LEVEL DOCKET NQ.50-250 UNIT Turkey Point f3 DATE March 15 1989 COMPLETED'BY D.H.Bonett TELEPHONE 407 694-4432 NNTH Februar 1989 DAY AVERAGE DAILY POMER LEVEL (N~t)2/1/89 2/2/89 2/3/89 2/4/89 2/5/89 2/6/89 2/7/89 2/8/89 2/9/89 2/10/89 2/11/89 2/12/89 2/13/89 2/14/89 2/15/89 2/16/89 2/17/89 2/18/89 2/19/S9 2/20/89 2/21/89 2/22/89 2/Z3/89 2/24/89 2/25/89 2/26/89 2/27'/89 2/28/S9-22-23 25 261 529 655 667 668 402-19-17-17-.17-17 78 445 673 687 682 682 684 685 693 785 712 708 706 708 PDR 4017 s9om8 R ADOCK 05000250 PNUp 4l OPERATING ST*TUB OPERATING DATA REF'ORT DOCKET NO 50-250 DATE 3/9/89 COHPLETED BY D,.M, BQHETT TELEPHONE 487/694/4432 ii UHXT HARE+TURKEY POINT UHXT 3 2o REPQRTXHG PERIOD+FEBRUARY 1989 3+LICENSED THERHAL POWER (HWT>+2200 HAHLF,'LATE RATIHG (GROSS MWE)7 768 5.DESIGN ELECTRICAL RATING (NET VWE>;.693 6+HAXXMUN DEF'ENDABLE CAPACITY (GROSS HWE)i 699 7i'AXXNUH DEPENDABLE CAPACITY (HET MWE)+..666 8+XF'HANGES OCCUR 1H CAI"ACXTY RATXHGS (ITEMS HUHBER 3 THROUGH 7)SINCE LAST REPORT r GIVE REASONS+9.POWER I FVEL TQ WHICH RESTRICTED.

XF AHY<NET XWE)18+REASONS FQR RESTRICTIONS<

XF ANY'ONTI-ILY

-YTD-CUMULATIVE HOURS XN REF'ORT PERIODS 12 i NUBBER OF HOURS RE*CTOR WAS CRXTICAL 1'3 REACTOR RESERVE SHUTDOWH HOURS 14+HOURS GENERATOR QH-LINE 15'HXT RESERVE SHUTDOWN HOURS ihi GROSS THERMAL EHERGY GENERATED (HWH)17+GROSS FLECTR1CAL ENERGY GENFRATED (HWH)18'ET ELECTRICAL'NERGY GENERATED (HWH)19+UHXT SLRVXCE FACTOR 28 i UNIT AVAILABILITY FACTOR 21+CAPACITY FACTOR (US1NG HDC HET)22'APACITY FACTOR (USIHG DER NET)23'NIT FORCED OUTAGL RATE 24.SHUTDOWHS SCHEDULED OVER NEXT,h MONTHS REFUELXHG~

9/17/89 FQR 185 DAYS 672 538+7 Oo8.462ii 8i8 932196 303830 2845'91 68oB 68o8 63ih 61 i 1 3I t2 1416 538'8i8 462+1 8i8 932196 303838 273064 32+6 32ih 29'0 27+8 64+8 142329oh 93922+3 844i4 92619o4 121+8 192125945 61566356 58283608 65+1 65i2 62+7 59+.8 13'25 1F SHUT DOWN AT EHD QF REPORT PERIOD r ESTXI'IATED D*TE OF STARTUF':

0 II h f i;'J UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February, 1989 DOCKET NO.UNlTNAMF Turkey Point 83 DATE COMPLETED BY 0-M.Bonett TELEPHONE No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report¹System Code 4 Component Codes Cause&Corrective Actionto PreventRecurrence 12 881230 71.2 MA PIPEXX The outage was further'extended for repairs of thimble tubes.Unit returned to service 2/3/89.Full power operation was delayed after returning to service for secondary chemistry, waterbox cleaning, rod position indication adjustment and repairs to main turbine front standard.01 890209 138.7 A HH PIPEXX Unit was shutdown to repair feed-water heater steamline.

Full power operation delayed for secondary chemistry.

Unit returned to service 2/15/89.F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data EntryScheetsUcensee Event Report (LER)File (NUB E$4161)Exhibit1-Same Source 0 I'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE COMPLETED BY'ELEPHONE 50-5 Turkey Point 83 Narch 15, 1989 D.H.Bonett'407 694-REPORT MONTH Februar 1989 See the"Unit Shutdowns and Power Reductions" sheet for Unit P3.

VERAGE DAlLY ONIT POMER.LEVEL DOCKET NO.'UNIT DATE COMPLETED BY TELEPHONE 50-251 Turkey Point f4 March 15 198~D M Bonett 4O7 S94-4432 NNTH Februar 1989 DAY AVERAGE DAILY POMER LEVEL (N~t)2/1/89 2/2/89 2/3/89 2/4/89 2/5/89 2/6/89 2/7/89 2/8/89 2/9/89 2/10/89 2/1'1/89'2/12/89 2/13/89 2/14/89 2/15/89 2/16/89 2/17/89 2/18/89 2/19/89 2/20/89 2/21/89 2/22/S9 2/23/89 2/24/89 2/25/89'/26/89 2/27/89 2/28/89 OPER*TXHG STATUS QF'ERATING DATA REPORT DOCKET HO 50-251 DATE 3/9/89 COMPLETED BY Di M+BOHETT TELEPHONE 407/694/4432 ii UNIT NAME+TURKEY POINT UHXT 2i REPORTXHG PERIOD+FEBRUARY 1989 3+LICENSED THERM*l F'OWER (MWT)i 2280 4+H*MEPLATE RATXHG (GROSS MWE)t 760 5, DESIGN ELECTRICAL RATING (HET MWE):.693 6+MAXIMUM'DEF'EHDABLE CAPACITY (GROSS MWE)+699 7 MAX1MUM DEPEHDABLE CAF'ACXTY (HET MWE): 666 8 IF CHANGES OCCUR IN CAI".ACITY R*TXNGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS+9.PQWER LEVEL TO WHICH RESTRICTED'F AHY (HET MWE)18'EASOHS FOR RESTRICTIONS'F ANY+MONTHLY-YTD-CUMULATIVE 11+, 12+l3t 14.l5 4 16i l7 t 18'8'21 t ,22'23'4'OURS 1H I"EPORT PERXOD: NUMBER OF HOURS REACTOR WAS CRITXCAL REACTOR RESERVE Sl-IUTDOWN HOURS HOURS GENERATOR ON-LINE UN1T RESERVE SHUTDOWN HOURS GROSS TI.IERMAL ENERGY GENERATED (MWH)GROSS ELECTRXCAL ENERGY GENERATED (MWH)HET ELECTRICAL EHERGY GENERATED (MWH)UNIT SERVICE FACTOR UNIT*V A'Il ABX LIT Y F ACTOR CAPACXTY FACTOR (USING MDC NET)CAPACITY FACTOR (USING DER NET)UNXT FORCED OUTAGL RATE SHUTDOWHS SCI-IEDULED OVER NEXT 6 MONTHS 672 8+8 8,8 8,0 8,8 8 0-1292 0.8 8+8 0.0 8,8 8,8 1416 8,8 8+8 8i8 8o8 0 0-2281 F 8 8+8 F 8 8i8 8,8 136861+8 98236+.6 166+6 87194ol 32+1 184882420 58748882 55581858 64+1 64ii 62+6 58+9 il i4 25 1F SHUT DOWN AT END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP: 04/08/89 il UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Fe uar 1989 DOCKET NO.50-251 UNIT NAME Turke Point f4 DATF March 15 1989 COMPLETED BY D tt TELEPHONE Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause&Corrective Actlonto PreventRecurrence 880920 S 672 RC FUELXX Unit 84 remained shutdotNn for refueling and scheduled maintenance.

F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-OperationalError(Explain)

H-Other(Explain)

Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)

Exhibit G-Instructions for Preparation of Data EntryScheetsUcensee Event Report(LER)

File (NUREG4161)

Exhibit1-Same Source

t t

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 Turkey Point g4 Harch 15, 1989 407 694-443 REPORT MONTH February, 1989 Unit 84 remained shutdown for refueling and scheduled maintenance.

Il AVERAGE DAILY UNIT PURER LEVEL+DOCKET NP.UNIT DATE CONPLETED BY'ELEPHONE 50-335 St.Lucie Pl D-N.Bonett 407 694-4432 NNTH Februar 1989 DAY AVERAGE DAILY POMER LEVEL (s ve-sec)2/1/89 2/2/89 2/3/89 2/'/89 2/5/89 2/6/89 2/7/89 2/8/89 2/9/89 2/10/89 2/ii/89 2/12/89 2/13/89 2/14/89 2/15/89 2/16/89 2/17/89 2/18/89 2/1'9/89 2/20/89 2/21/89 2/22/89 2/23/89 2/24/89 2/25/89 2/26/89 2/27/S9 2/28/89 870 868 869 869 871 870 869 87 1'71 872 873 873 873 871 869 867 745 761 870 871 871 869 871 874 876 876 875 874

OPERATING STATUS OPERATIHG DATA REI='ORT DOCKET HO 50-335 DATE 3/9/89 COMPL'ETED BY D+Mi BOHETT TELEFHONE 407/694/4432

" 1+UNXT NAME+STi LUCXE UNXT Z.REPORTING PERIOD: FLBr"UARY 1989 3+LXCEHSED THERMAL POHER<MAT)i 2700 4, NAMEPLATE RATING<GROSS MME>: 858 5i DESXGH ELECTRXCAL RATIHG (NET MME)+838 6+MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)+872 7o MAXIMUM DEPFNDABLE CAPACITY (NET MME>i 839 8 XF CHANGES OCCUR IH CAPACITY R*TXHGS (ITEMS NUMBER 3 THROUGH 7)SIHCE LAST REPORT r GIVE REASONS'+POWER LEVEL TO HHXCH RESTRXCTEDr XF AHY<NET MME)18 i REASOHS FOR'RESTRICTIONS r IF ANY'+MONTI-ILY-YTD-CUMULATIVE 11, HOURS IH REPORT FERIOD;12, NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOHH HOURS I-IOURS GENERATOR OH-LINE 15 i UNIT RESERVE SHUTDOWN HOURS 16+GROSS THERMAL ENERGY GEHERATED (MHH)17'ROSS ELECTRICAL ENERGY GENERATED (MWI.I)18'ET ELECTRICAL ENERGY GEHERATED (MMH)19+UNIT SERVICE FACTOR 28+UNIT AVAXLABXLXTY FACTOR Zii CAPACTTY FACTOR<USING MDC HET)22+CAPACITY FACTOR (USING DER NET)23'NIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MOHTHS+672 672+8 8i8 672'8,8 1800643 689848 579803 188+8 188+8 182i8 184 i 8 8i8 1416 1416i8 8i8 14'l6+8 8i8 3777971 l277660 1214386 188.8 188+8 182 i 2 183'8,8 186872i8 88514i6 285i3 79795+3 39+3 204799158 67396255 63665916 74.7 74+7 74+1 72+9 317 25, XF SHUT DOHH AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Februar 1 8 DOCKET NO.UNIT NAMF St.Lucie f 1 DATF March 15, 1989 COMPLETED BY D.M.Bonett 4-No.Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit 4'1 operated at essentia1ly fu11 power and had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-.Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)

File (NUREG4161)

Exhibit1-Same Source il 0 I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE'COMPLETED BY TELEPHONE 50-335 St.Lucie 41 ttarch 15.1989 D.H.Bonett (407)694-4432 REPORT MONTH February.1989 St.Lucie Unit$1 operated at essentia11y fu11 power.and had no shutdowns or significant power reductions.

In accordance with requirements of Technica1 Specification 6.9.1.6, there were no cha11enges to PORV or safety va1ves during the report period.

!f

~ERAGE DAILY UNIT PNER LEVEL DOCKET NO.UNIT DATE CONPLETED BY TELEPHONE 50-389 St.Lucie 42 D.H.Bonett 432 NNTH DAY AVERh6E DAILY POMER LEVEL (s ve-see)2/1/89 2/2/S9 2/3/89 2/4/89 2/5/89 2/6/89 2/7/89 2/8/89 2/9/89 2/10/89 2/ii/89 2/12/89 2/13/89 2/14/S9 2/15/89 2/16/89 2/17/89 2/18/89 2/19/89 2/20/89 2/Zl/89 2/22/89 2/23/89 2/24/89 2/25/89 2/26/89 2/27/89 2/28/89-27-20-11 2 0-3 2 2-2-2-2-2-2'7-2 2 P 2-2-1-1-1-1-1 1

!P I~

OPERATING STATUS OF'ERA TXHG DATA REF'ORT DOCVET HO 58-389 DATE 3/9/89 COMPLET'ED BY Di Mi BQNETT TELEPHONE 487/694/4432 1+UNIT NAME+ST+LUCIE UNIT 2 2o REPORTXHG PERXOD+FEBRUARY 1989 3, I xcEHsED THEr'MAL POWER<MwT): 2700 NAMEPLATE RATING ('ROSS MWE)i 850'5i DFSXGH ELECTRICAL RATXNG (NET MWE)e 830 6+MAXXMUM DEF'ENDABI E CAPACITY (GROSS MWE): 882 7 i MA'XIMUM DEPENDABLE CAPACX T Y (NET MWE): 839 8+XF CHAHGES OCCUR IH CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SIHCE LAST REPORT.GIVE REASONS+'.POWER LEVEL To WHICH RESTRICTED>

IF ANY<NET MWE)ie, r'EAsoNs Far RESTRICTIONS.

xF ANY: MOHTHLY-YTD-CUMULATIVE 1'1+HOURS XH REPORT PERIOD: 12'UMBER QF HOURS REACTOR WAS CRITXCAL'3'EACTOR RESERVE SHUTDOWN'OURS 14.HOURS GEHERATOR OH-LINE 15'NIT RESERVE Sl-IUTDOWH HOURS ihi GROSS THERMAL ENERGY GEHERATED (MWH)17+GROSS ELECTRICAL ENERGY.GENFRATED (MWH)18+HET ELECTRICAL ENERGY GEHERATED (MWH)'9'+UNXT SERVICE FACTOR 20, UHXT AVAILABILITY FACTOR 2ia'CAPACITY FACTOR (USING MDC NET)22'CAPACITY FACTOR, (USIHG DER NET)23 i UNIT FORCED'OUTAGE RATE 24+SHUTDOWNS SCISEDULEDOVER NEXT 6 MONTHS 672 eie eie eie'0 i 0 8 e-3075 Oie eie e e 8,+0 eie 1416 742+4 8 i 8 742+1 eie 1999393 664180 626641 52o4 52+4 52+7 5343 eie 48769 i 8 422S4.4~eie 41563i7 eie 108483863 36161820 34201534 85.i.2 85'85ih 85'+5 5+7 25 IF SHUT DOWN*T EHD OF REr-ORT PERXOD ESTII'IATED DATE OF'TARTUP'4/24/89 II t 1, UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Februar 1989 DOCKET NO.UNlT NAME St.Lucie DATF March 15.COMPLETED BY TELEPHONE 82 1989 No.Date Type'uration (Kours)Reasons Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause&Corrective Actionto Prevent Recurrence, 01 890131 672 RC FUELXX Unit II2 remained shutdown for refueling and scheduled maintenance.

F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Exphin)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)

File (NUREG<161)

Exhibit1-Same Source I

~~~'~~4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE St.Lucie$2 l1arch 15 1989 COMPLETED BY TELEPHONE D.f1.Bonett 407 694-4432 REPORT MONTH-February, 1989 St.Lucie Unit 82 remained shutdown for refue1ing and schedu1ed maintenance.

In accordance with requirements of Technica1 Specification 6.9.1.6, there were no cha11enges to PORV or safety va1ves during the report period.