ML17354A749

From kanterella
Revision as of 09:11, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Turkey Point Unit 4 SG Insp Rept.
ML17354A749
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/13/1997
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17354A748 List:
References
NUDOCS 9801060282
Download: ML17354A749 (14)


Text

ATTACHMENT TO: L-97-307 TURKEY POINT UNIT 4 STEAM GENERATOR INSPECTION REPORT 9801060282 971230 PDR ADOCK 0500025%II 8 PDR 4~i>

~~a<<~l~~<<~~~~~~4~~~~<<~~~~~~~~~~~RRIRIR~R8%%RWKH~'~~'I I'.I~~~'~~~a~~~~<<~~~~~~\~~~~~I'.'~I'~~I I I I I I I I I I I I I I I I I I I'~I~~~~~~~0~<<~<<~~~~~~~~~~~~~~~~~~~~~/

,Qi COMPONENT: S/G'CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT f 4 09/97 Page: 1 Date: 09/24/97 Examination Dates: 09/18/97 thru 09/22/97 Total Number of Tubes Inspected'3 198.Total Indications Between 20%and 394 Greater than or equal to 40%Total Corrosion type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 0 0 0 0 0 Location Of Indications 204 to 1004&"VOL" Hot Leg TSH-.5 to 01H-2.1: 0 01H-.2.0'to,06H+2.0: 0 06H+2.1 to AV1-3.1: 'AV1-3.0 to AV4-3.0: 0 Cold Leg TSC-.5 to 01C-2.1 01C-2.0 to'06C+2.0 06C+2.1 to AV4-3..1 0 0

~I I 4 j COMPONENT: S/G B CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT f 4 09/97 Page:, 1 Date: 09/24/97 Examination Dates: 09/18/97 thru 09/22/97 Total Number of Tubes Inspected......: 3206 Total Indications Between 204 and 394 Greater than or equal to 40%Total Corrosion type Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 2 0 0 0 0 Location Of Indications 204 to 1004&"VOL"'Hot Leg TSH-.5 to 01H-2.1: 0 01H-2.0 to 06H+2.0: 0 06H+2.1 to AV1-3.1:.0 AV1-3.0 to AV4-3.0: 2 Cold Leg TSC-.5 to 01C-2'.1 01C-2.0 to 06C+2.0 06C+2.1 to AV4-3.1 0 0 0 i'

COHPONENT S/G 8 DESCRIPTION

20K to 39X, Indications INDICATIONS/TRENDING REPORT PTN-4 OUTAGE: 09/97 Page: 1 Date: 10/10/97 Time: 08:29:51 I Extent I'09/97'f)N/A (Row(Col/Leg[***)Tst/Mote(Reel/probe)Location/Volts(Deg[Ch

/X]Diff/Location/Volts(Deg[Ch

)')+--I--I-I I I-------I------

-I----------l-I---I--I I I I 23I 5 I C I ITEM PS/BC044 lA-720-M/ULC lAV3 2-l.5I IP 2I 26//30/65(C//TEN PS(BC033/A-720-N/ULC

/AV2-.1 f.6//P 2/20/'--I--I--I--I--I-----I--------I---------I--I-I I I Number of'ECORDS'Selected from Current Outage:.2 Munber of TUBES Selected from Current Outage: 2 Ol 4~

COMPONENT: S/G C CUMULATIVE DISTRIBUTION

SUMMARY

TURKEY POINT UNIT g 4 09/97 Page Date 1 09/24/97 Examination Dates: 09/18/87 thru 09/22/97.Total Number of Tubes Inspected.....: 3205 Total Indications Between 204 and 39%Greater than or equal to 40%Total Corrosion type, Indications"VOL" Total Tubes Plugged as Preventive Maint Total Tubes Plugged 4'0 0 0 0 Location Of Indications 20%to 100%&"VOL" Hot Leg TSH-.5 to 01H-2.1 0 01H-2.0 to 06H+2.0: 0 06H+2.1 to AV1-3.1:: 0 AV1-3.0 to AV4-3.0: 4 Cold Leg TSC-.5 to 01C-2.1: 0 01C-2.0 to 06C+2.0: 0 06C+2.1 to AV4-3'.1: 0

~I I T 4 4.

5 0'INDICATIONS/TRENDING REPORT PTN-4 OUTACE: 09/97COHPONENT: S/6 C DESCRIPTION

20K to 39X Indications

+I Extent I (Roe(Col (Leg(*~*(Tst/Note(Reel (Probe (Location+--(--I--I-.I----I-I-I-(22(7(<C ((TEH SC(CC022-(A-720-H/ULC (AV2 1.9 (32(16(C ('(TEH PS(CC024 (A-720-H/UI.C (AV2.0 (35(31(C ((TEH PS(CC043 (A 720;H/ULC (AV2.0 13(43(H ((TEC SS(CK001 (A-720-H/ULC

'(AV3--9---(--(---

I--(------

I-------I-I Number of RECORDS Selected from Current Outage: 4 Nurher of TUBES Selected from Current Outage: 4 09/97 ((N/A (Volts(Deg(ch (X (Diff(Location-t-(--(I--(-------(.3((P 2(21(.3((P 2(22(.4('P 2(21(',:(~1.0((P 2('0(I-(--(--(.-(-------Page: Date: 10/10/9'7 Time: 08:30:42 I (Volts(Deg(Ch (X (I--.-----(---(---+

I I ((I I'I I I.I I I (I I I (-I---I-.-(--I--+

4i i~>~.)