ML17354A747

From kanterella
Jump to navigation Jump to search
Forwards Turkey Point Unit 4 SG Insp Rept, Conducted from 970918-22.No SG Tubes Plugged as Result of Insp
ML17354A747
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/30/1997
From: Hovey R
FLORIDA POWER & LIGHT CO.
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17354A748 List:
References
L-97-307, NUDOCS 9801060277
Download: ML17354A747 (4)


Text

CATEGORY 1 REGUZiAT Y INFORMATION DISTRIBUTION YSTEM (RIDS)

ACCESSION NBR:9801060277 DOC.DATE: 97/12/30 NOTARIZED: NO DOCKET FACIL:50-$ 51 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION REYES,L.A. Region 2 (Post 820201)

SUBJECT:

Forwards "Turkey Point Unit 4 SG Insp Rept," conducted from TITLE:

NOTES:,

OR 970918-22.No DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from j

SG tubes plugged as result of insp.

ENCL J SIZE: 1 ASME Code - GL-89-04

+7 A T

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA 1 1 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RAB 1 1 CENTER 01 1 1 NRR/DE/EMEB 1 1 1 1 OGC/HDS3 1 0 RES/DET/EIB 1 . 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

U E

NOTE TO ALL NRIDSN RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12

v' 1P l

'FPL DEC 80 '1997 L-97-307 10 CFR 50.36 Luis A. Reyes Regional Administrator U. S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S. W., Suite 23T85 Atlanta, GA 30303

Dear Mr. Reyes:

Re: Turkey Point Unit 4 Docket No. 50-251 Steam Generator Tube Plugging The Turkey Point Unit 4 steam generators were inspected from September 18, 1997 through September 22, 1997. There were no steam generator tubes plugged as a result of the inspection. In accordance with Technical Specification 4.4.5.5.b, the attached report summarizes the results of the steam generator tube inservice inspection.

Should there be any questions, please contact us.

Very truly yours,.

Ql R. J. Hovey Vice President Turkey Point Plant Attachment OIH cc: USNRC, Document Control Desk, Washington, D.C.

T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 98oi060277 971230 jtt PDR ADQCK 05000251('

PDR

('60Il-'6 llllllllllllllll lllllllllllllilllllll an FPL Group company

~ >

/

~ I 1