Summary of October 10, 2019, Public Meeting with Southern Nuclear Operating Company
ML19302E456
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/22/2019
From: Jennivine Rankin
NRC/NRR/VPOB
To: Victor Hall
NRC/NRR/VPOB
References
Download: ML19302E456 (9)


Text

November 22, 2019 MEMORANDUM TO: Victor Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: Jennivine Rankin, Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON OCTOBER 10, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on October 10, 2019. The purpose of the meeting was to discuss License Amendment Request (LAR)19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test and a proposed LAR and exemption associated with modification of the primary coolant system (PCS) wetted perimeter test.

The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML19248C473. The meeting notice was posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:

V. Hall Summary of Meeting:

Technical Discussion on Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation (LAR 19-017)

On October 10, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss LAR 19-017. The LAR requests a change to remove the natural circulation test of the passive residual heat removal (PRHR) heat exchanger, which is conducted during preoperational testing, from the scope of the initial test program. At a previous public meeting on September 26, 2019 (meeting summary can be found at ADAMS Accession No.

ML19270G587), the NRC explained the reasons that it did not find adequate justification for the proposed removal of an initial test and related modification to Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) requiring SNC to conduct a PRHR heat exchanger natural circulation test. During this meeting, the NRC reiterated its concern that the forced flow test would not be equivalent to the natural circulation test. SNC explained the methods they will use to validate flowrates, specifically highlighting driving head and line resistance calculations. SNC also discussed other options they have considered such as shortening the natural circulation test or performing the test at a lower temperature. The public meeting concluded with the NRC reiterating that it does not have sufficient information to complete its acceptance review. The NRC offered two potential paths forward for SNC to consider:

1. SNC submit supplemental information to describe how the forced flow scheme will meet the acceptance criteria for the natural circulation test.
2. SNC evaluate if the natural circulation test could be conducted at lower temperature or at a shorter duration.

Portions of the meeting were closed to the public due to proprietary discussion technical details.

At the conclusion of each presentation, there was an opportunity for the public to provide comments and to ask questions to the NRC staff. The NRC provided the public additional information regarding the kind of topics that were going to be discussed during the proprietary portion of the meeting and also if the tests were done with different heat removal capacities.

Pre-submittal Meeting on Proposed LAR and Exemption Associated with Modification of the PCS Wetted Perimeter Test On October 10, 2019, staff from the NRC conducted a public meeting with representatives from SNC to conduct a pre-submittal meeting for a proposed LAR and exemption associated with modification of the PCS wetted perimeter test. SNC discussed the reason for the proposed

V. Hall change and the proposed licensing bases changes. The NRC asked clarifying questions to understand the bases of the statements made in the LAR. SNC took an action to evaluate the following changes to the draft LAR:

1. Add language to describe how the test is performed to confirm the wetted perimeter coverage.
2. Clarify the percentage of coverage will be dependent on the different elevation and circumferences.

Docket Nos.: 52-025 52-026

Enclosure:

As stated cc w/encls: See next page

ML19294A113 *via e-mail NRO-008 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/VPO NAME JRankin (c)* RButler* CPatel* VHall*

DATE 10/24/19 10/23/19 11/4/19 11/19/19 OFFICE PM: NRR/VPO NAME JRankin (s)

DATE 11/22/19

AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, October 10, 2019 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED. (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, October 10, 2019 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Chandu Patel Jennivine Rankin Jennifer Dixon-Herrity NRO/DLSE Don Habib Vic Hall Chris Welch Ryan Nolan Becky Karas Kevin Coyne NRO/DSER Hanry Wagage Bob Caldwell Chang Li Mike King NRO Representing Industry Steven Unikewicz*

Kelli Roberts*

Nick Kellenberger* Southern Nuclear Company Ryan Henderson*

Mark Wilson*

Jen Meneely*

Mike Patterson*

Natalie Rodgers*

Venki Prabhu* Westinghouse Electric Company Oscar Vinals*

Jimmy Hennen*

Zach Harper*

Members of the Public Steve Franzone*

Florida Power and Light Bill Freebairn* Platts Wayne Marquino* Public

  • = participated via teleconference Enclosure 2

Vogtle Units 3 & 4 Mailing List (Revised 08/13/2019) cc:

Southern Nuclear Operating Company, Inc. Resident Inspector Document Control Coordinator Bin N-226-EC Vogtle Plant Units 3 & 4 3535 Colonnade Parkway 8805 River Road Birmingham, AL 35243 Waynesboro, GA 30830 Office of the Attorney General Mr. Barty Simonton 40 Capitol Square, SW Team Leader Atlanta, GA 30334 Environmental Radiation Program Air Protection Branch Resident Manager Environmental Protection Division Oglethorpe Power Corporation 4244 International Parkway, Suite 120 Alvin W. Vogtle Nuclear Plant Atlanta, GA 30354-3906 7821 River Road Waynesboro, GA 30830 Brian H. Whitley 3535 Colonnade Parkway, Bin N-226-EC Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35243 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Page 2 of 3

Vogtle Units 3 & 4 Mailing List Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)

MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)

Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)

Page 3 of 3