ML19319C243

From kanterella
Revision as of 16:26, 11 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Preoperational Environ Monitoring Programs, Semiannual Rept Jul-Dec 1975
ML19319C243
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/01/1976
From: Roe L
TOLEDO EDISON CO.
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML19319C245 List:
References
NUDOCS 8002110709
Download: ML19319C243 (1)


Text

__. . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.

<-

TG? EDo EDISON LOWELL E. ROE v.a. : .

Fec hose Cowesom ent (4193 259-5242 h hwe Wo. 50-346 w I, 1976 M2== w of Nuclear Regulation at:en: Mr. George W. Knighton, Chief Environmental Projects Branch No. I hhri States Nuclear Regulatory Commission Eashington, D.C. 20555 3 mar Mr. Knighton:

Th=lar separata cover, we are transmitting twenty-five (25) copies of our k .fnurth Semi-Annual Report of our Pre-Operational Environmental Monitoring

-

Programs for the Davis-Besse Nuclear Power Station Unit No. 1. This report is for the period July 1, 1975, to December 31,-1975. ,

3uring this period activities continued to be directed towards obtaining aspastic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, volume IV, and previous reports, volumes I through III, provides two full years of preoperational environmental monitoring.

-

The data collected for this period are consistent with previous data collected and do not indicate any unusual conditions for Western Lake Erie.

Yours very truly, db b/7

.

, ,

'

THIS DOCUMENT CONTAINS l POOR QUAllTY PAGES 8002 IIO i

Of THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

,

. - _ . , - .___.1 . . - . . ._ . _ _ . - . _ . _