ML19319C243
| ML19319C243 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/01/1976 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19319C245 | List: |
| References | |
| NUDOCS 8002110709 | |
| Download: ML19319C243 (1) | |
Text
__..
TG? EDo EDISON LOWELL E. ROE v.a. :
Fec hose Cowesom ent (4193 259-5242 h hwe Wo. 50-346 w I, 1976 M2== w of Nuclear Regulation at:en:
Mr. George W. Knighton, Chief Environmental Projects Branch No. I hhri States Nuclear Regulatory Commission Eashington, D.C.
20555 3 mar Mr. Knighton:
Th=lar separata cover, we are transmitting twenty-five (25) copies of our k
.fnurth Semi-Annual Report of our Pre-Operational Environmental Monitoring Programs for the Davis-Besse Nuclear Power Station Unit No. 1.
This report is for the period July 1, 1975, to December 31,-1975.
3uring this period activities continued to be directed towards obtaining aspastic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, volume IV, and previous reports, volumes I through III, provides two full years of preoperational environmental monitoring.
The data collected for this period are consistent with previous data collected and do not indicate any unusual conditions for Western Lake Erie.
Yours very truly, db b/7 THIS DOCUMENT CONTAINS POOR QUAllTY PAGES 8002 l
IIO Of i
THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652
.___.1
_. _