ML17208A571

From kanterella
Revision as of 09:48, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1978
ML17208A571
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 05/14/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A566 List:
References
NUDOCS 8005120425
Download: ML17208A571 (4)


Text

SUMMARY

OF OPERATXNG EXPERIENCE 0'oosiso~~~DOCKET NO.-UNXT 50-250 Turkey Point Unit No.3 DATE Ma 14, 1978 COMPLETED BY V.T.Chilson QEPORT MONTE'pril, 1978 TELEPHONE 305/552-3824 Turkey Point.Unit No.3 operated at approximately 100%R.P.during the month, except for the outage of Apr'il 19-20, 1978 and the load reductions on April 26 and 28, 1978.Refer to the Unit Shutdowns.and Power ReductionsSection of the Operating Status report for details.Major safety-related maintenance performed during the month included inspection of the Rod Control System.

~

SUMMARY

OF ORERATXNG EXPERXENCE REPORT MONTH A rxl 1978 DOCKET NO.50-251 Turkey Point Unit Ho.4 DATE May 14, 1978 COMPLETED BX V.T.Chilson TELEPHONE 305/552-3824 Turkey Point Unit No.4 operated at approximately 100%R.P.during the month except for the load reduction'on April 24-25, 1978 to perform the periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.No Major safety-related maintenance was performed during the month.

$Ui~ia 1ARY OK'PERATING EXPERlENCE DOC YiET NO.UNIT.50-335 St.Lucie Unit No.1 DATE May 14, 1978 COMPLETED BY V.T.Chilson ,QEPORT tlONTH April, 1978 TELEPHONE 305/552-3824 St.Lucie Unit No.1 remained out of service during the month for scheduled refueling, maintenance, and inspection.

Major safety-related maintenance included: Performance of Steam Generator Tube Inspection Program.Refueling operation continued.

during the month.

0.w