ML20065C137

From kanterella
Revision as of 10:41, 6 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Advises of Delay in Submittal of Proposed Tech Specs Re Auxiliary Feedwater Header Insps Due to Intensive Resource Requirements to Start Up from Refueling Outage.Submittal Expected by 821029
ML20065C137
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/16/1982
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
860, TAC-48349, NUDOCS 8209230230
Download: ML20065C137 (1)


Text

TOLEDO

%ms EDISON Docket :;o. 50-346

[c(($ce License No. NPF-3 " "" "22 '

Serial No. 860 September 16, 1982 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stolz:

Toledo Edison committed to provide proposed changes to Davis-Besse Technical Specifications to reflect the extent and frequency of future Auxiliary Feedwater header inspections in a letter dated August 16, 1982 (Serial No. 849). Due to the intensive resource requirements to startup Davis-Besse Nuclear Power Station from a refueling outage, we find it necessary to request a delay in our submittal of the proposed Technical Specifications.

Based on the normal review time to process a Technical Specification change request and the unique need in this instance to ensure detail documentation of the specific inspection requirements, a proposed submittal date of October 29, 1982 is required. Every effort will be made to improve on this schedule without jeopardizing the safety review on this item.

Very truly yours, RPC:LDY: lab cc: DB-1 NRC Resident Inspector 8209200230 820916 PDR ADOCK 05000346 G PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652