TAC:48349
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers | |
From | |
MONTHYEARML20261N1021981-06-0505 June 1981
[table view]Piping Isometric:Main Steam System Ctmt Bldg Steam Gen 1-2 ML20054G5841982-05-20020 May 1982 Submits Addl Info Re Auxiliary Feedwater Header Mod,Per NRC Request.Existing Headers Have Become Distorted Since Original Fabrication.Headers Will Be Replaced & Stabilized to Prevent Further Unacceptable Damage to Steam Generators ML20054H5061982-06-21021 June 1982 Requests List of Specific New B&W Steam Generator Auxiliary Feedwater Header Design Details Required for NRC Design Review of New Scheme to Supply Auxiliary Feedwater to Steam Generators ML20054M3651982-06-23023 June 1982 Forwards Public Version of Revision 4 to Emergency Plan, Per 10CFR50 App E.Cover Sheet & Receipt Form Encl ML20054J4841982-06-23023 June 1982 Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-019,Revision 1.Info Needed 10 Days Prior to Scheduled Restart ML20062C4071982-07-30030 July 1982 Tech Spec Table 3.7-3 Re safety-related Hydraulic Snubbers. Safety Evaluation for Auxiliary Feedwater Header Replacement Encl ML20062C3941982-07-30030 July 1982 Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Identification of Snubbers Removed & Relocated During Mod to Header Encl ML20062C3791982-07-30030 July 1982 Forwards Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Class III Fee Encl ML20058J6201982-08-0606 August 1982 Forwards Addl Info Re Auxiliary Feedwater Header Repair,In Response to NRC 820623 Request.One Oversize Drawing Encl. Aperture Card Is Available in PDR ML20062N7981982-08-16016 August 1982 Forwards Info Re Auxiliary Feedwater Header/Steam Generator Mod,In Response to NRC Questions in .Also Discusses Potential for Crack Propagation in Retired Header. Util Will Propose Changes to Tech Specs within 30 Days 05000287/LER-1982-006, Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl1982-08-27027 August 1982 Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl ML20065C1371982-09-16016 September 1982 Advises of Delay in Submittal of Proposed Tech Specs Re Auxiliary Feedwater Header Insps Due to Intensive Resource Requirements to Start Up from Refueling Outage.Submittal Expected by 821029 ML20079R1081983-06-17017 June 1983 Part 21 Rept Re Adequacy of Fittings Supplied by Tube-Line Corp Through Capitol Pipe & Steel Products Co for Use on New Auxiliary Feedwater Headers of Steam Generators.Flanges Not heat-treated as Required by Matl Specs 1982-07-30 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:48349&oldid=3215556"