ML17320A902: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:INDIANA&MICHIGANflfCIICCGMPANYDONALDC.COOKNUCLEARPLANTP.O.Box458,Bridgman, Michigan49106(616)465-5901xmHQPIMcopyJanuary6,1984Mr.J.G.Keppler',
{{#Wiki_filter:INDIANA&MICHIGAN flfCIIC CGMPANY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 (616)465-5901 xm HQ PIM copy January 6, 1984 Mr.J.G.Keppler', Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt, Road Glen Ellyn, IL 60137'perating License DPR-58/DPR-74 Docket Nos.50-315/50-316
RegionalAdministrator UnitedStatesNuclearRegulatory Commission RegionIII799Roosevelt, RoadGlenEllyn,IL60137'perating LicenseDPR-58/DPR-74 DocketNos.50-315/50-316


==DearMr.Keppler:==
==Dear Mr.Keppler:==
Pursuanttotherequirements ofAppendixB,PartII,Nonradiological, Environmental Protection Plan,Section3.2,acopyofthereporttotheMichiganWaterResources Commission notifying themofthefailuretotaketheSteamGenerator blowdownsamplesfortotalsuspended s'olids,ironandcopper,isattached.
Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown samples for total suspended s'olids, iron and copper, is attached.This report is required by Amendment No.54 to Facility Operating License No.DPR-58 and Amendment No.40 to Facility Operating License No.DPR-74 dated May 6, 1982.Sincerely, W.G.Smith, Jr.Plant Manager/bab Attachment cc: John E.Dolan M.P.Alexich R.F.Kroeger H.Brugger E.R.Swanson, RO:III R.C.Callen, MPSC G.Charnoff, Esq.J.M.Hennigan INPO Dir., IE (40 copies)Dir., MIPC (4 copies)PNSRC J.F.Stietzel E.L.Townley K.R.Baker R.O.Bruggee, EPRI 840223033b 84020b PDR ADOCK 05000325''DR 4 4P<)Il'tf 4')()4)I,'.<)9-')')3.
ThisreportisrequiredbyAmendment No.54toFacilityOperating LicenseNo.DPR-58andAmendment No.40toFacilityOperating LicenseNo.DPR-74datedMay6,1982.Sincerely, W.G.Smith,Jr.PlantManager/babAttachment cc:JohnE.DolanM.P.AlexichR.F.KroegerH.BruggerE.R.Swanson,RO:IIIR.C.Callen,MPSCG.Charnoff, Esq.J.M.HenniganINPODir.,IE(40copies)Dir.,MIPC(4copies)PNSRCJ.F.StietzelE.L.TownleyK.R.BakerR.O.Bruggee,EPRI840223033b 84020bPDRADOCK05000325''DR 44P<)Il'tf4')()4)I,'.<)9-')')3.
O(fOX~\4 4 J%1~'tQ(~=~$~V.'t'I(4>4" ('()).<.4 f 1")II<>>-f)",~J~): ':,:.)".()')(!)e"4~).s)~1)>[~')'(>(4 ((I('.>." a 44 I'I 1()'4~<), 4!).".(4 ll g 1~g g 0:If~IVI~4(..3~>f~()I'-,~  
O(fOX~\44J%1~'tQ(~=~$~V.'t'I(4>4"('()).<.4f1")II<>>-f)",~J~):':,:.)".()')(!)e"4~).s)~1)>[~')'(>(4((I('.>."a44I'I1()'4~<),4!).".(4llg1~gg0:If~IVI~4(..3~>f~()I'-,~  
+m~en j'.;.-;;;
+m~enj'.;.-;;;
IIIIatAuA S,e!Camas EIZCTh C CayeAeV ONC SUMMIT SQUARE, P.O.BOX 60.FORT WAYNE IN.4680I Telcqhone:
IIIIatAuA S,e!Camas EIZCThCCayeAeVONCSUMMITSQUARE,P.O.BOX60.FORTWAYNEIN.4680ITelcqhone:
(2l9)425.2II I December 12, 1983 RlC1lriRD C.DfEr'VGE Vice Prcsidcnr Mr.Paul D.Zugger Executive Secretary hlichigan Water Resources Commission Stevens T.Mason Building Box 30026 Lansing, Ml.48909 Re: Donald C.Cook Nuclear Plant NPDES Permit No.Ml 0005827 Steam Generator Blowdown  
(2l9)425.2IIIDecember12,1983RlC1lriRD C.DfEr'VGEVicePrcsidcnr Mr.PaulD.ZuggerExecutive Secretary hlichigan WaterResources Commission StevensT.MasonBuildingBox30026Lansing,Ml.48909Re:DonaldC.CookNuclearPlantNPDESPermitNo.Ml0005827SteamGenerator Blowdown


==DearMr.Zugger:==
==Dear Mr.Zugger:==
AreviewoftheI"ovember NPDESmonitoring reportrevealedthatasampleof-"SteamGenerator BlowdownPriortoIt.'Iixing CoolingWater"wasnotobtainedfortotalsuspended solidsorIronandCopperanalysis.
A review of the I"ovember NPDES monitoring report revealed that a sample of-"Steam Generator Blowdown Prior to It.'Iixing Cooling Water" was not obtained for total suspended solids or Iron and Copper analysis.Upon investigation, it was found that with Nuclear Reactor Unit P2 in the start-up mode, the laboratory technician mistakenly thought that suspended solids and Iron and Copper samples were only to be taken in the normal running mode~The sampling procedure has been reviewed with the technician.
Uponinvestigation, itwasfoundthatwithNuclearReactorUnitP2inthestart-upmode,thelaboratory technician mistakenly thoughtthatsuspended solidsandIronandCoppersampleswereonlytobetakeninthenormalrunningmode~Thesamplingprocedure hasbeenreviewedwiththetechnician.
gl Very truly yours, RCM/be cc: W.G.Smith Vice President I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
glVerytrulyyours,RCM/becc:W.G.SmithVicePresident IcertifyunderpenaltyoflawthatIhavepersonally examinedandamfamiliarwiththeinformation submitted inthisandallattacheddocuments; andbasedonmyinquiryofthoseindividuals immediately responsible forobtaining theinformation, Ibelievethesubmitted information istrue,accurateandcomplete.
bc: R.W.Jurgensen T.A.Kriesel J.A.Wojcik R.W.Reeves/C.E.Hawk J.P.Irlhite R.E.Zahler R.C.Meng}}
Iamawarethattherearesignificant penalties forsubmitting falseinformation, including thepossibility offineandimprisonment.
bc:R.W.Jurgensen T.A.KrieselJ.A.WojcikR.W.Reeves/C.
E.HawkJ.P.IrlhiteR.E.ZahlerR.C.Meng}}

Revision as of 09:56, 6 July 2018

NPDES Noncompliance Notification:Steam Generator Blowdown Samples for Total Suspended Solids,Iron & Copper Not Taken in Nov.Caused by Personnel Error.Sampling Procedures Reviewed W/Technician
ML17320A902
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/06/1984
From: SMITH W G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8401130336
Download: ML17320A902 (3)


Text

INDIANA&MICHIGAN flfCIIC CGMPANY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 (616)465-5901 xm HQ PIM copy January 6, 1984 Mr.J.G.Keppler', Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt, Road Glen Ellyn, IL 60137'perating License DPR-58/DPR-74 Docket Nos.50-315/50-316

Dear Mr.Keppler:

Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown samples for total suspended s'olids, iron and copper, is attached.This report is required by Amendment No.54 to Facility Operating License No.DPR-58 and Amendment No.40 to Facility Operating License No.DPR-74 dated May 6, 1982.Sincerely, W.G.Smith, Jr.Plant Manager/bab Attachment cc: John E.Dolan M.P.Alexich R.F.Kroeger H.Brugger E.R.Swanson, RO:III R.C.Callen, MPSC G.Charnoff, Esq.J.M.Hennigan INPO Dir., IE (40 copies)Dir., MIPC (4 copies)PNSRC J.F.Stietzel E.L.Townley K.R.Baker R.O.Bruggee, EPRI 840223033b 84020b PDR ADOCK 05000325DR 4 4P<)Il'tf 4')()4)I,'.<)9-')')3.

O(fOX~\4 4 J%1~'tQ(~=~$~V.'t'I(4>4" ('()).<.4 f 1")II<>>-f)",~J~): ':,:.)".()')(!)e"4~).s)~1)>[~')'(>(4 ((I('.>." a 44 I'I 1()'4~<), 4!).".(4 ll g 1~g g 0:If~IVI~4(..3~>f~()I'-,~

+m~en j'.;.-;;;

IIIIatAuA S,e!Camas EIZCTh C CayeAeV ONC SUMMIT SQUARE, P.O.BOX 60.FORT WAYNE IN.4680I Telcqhone:

(2l9)425.2II I December 12, 1983 RlC1lriRD C.DfEr'VGE Vice Prcsidcnr Mr.Paul D.Zugger Executive Secretary hlichigan Water Resources Commission Stevens T.Mason Building Box 30026 Lansing, Ml.48909 Re: Donald C.Cook Nuclear Plant NPDES Permit No.Ml 0005827 Steam Generator Blowdown

Dear Mr.Zugger:

A review of the I"ovember NPDES monitoring report revealed that a sample of-"Steam Generator Blowdown Prior to It.'Iixing Cooling Water" was not obtained for total suspended solids or Iron and Copper analysis.Upon investigation, it was found that with Nuclear Reactor Unit P2 in the start-up mode, the laboratory technician mistakenly thought that suspended solids and Iron and Copper samples were only to be taken in the normal running mode~The sampling procedure has been reviewed with the technician.

gl Very truly yours, RCM/be cc: W.G.Smith Vice President I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

bc: R.W.Jurgensen T.A.Kriesel J.A.Wojcik R.W.Reeves/C.E.Hawk J.P.Irlhite R.E.Zahler R.C.Meng