INDIANA& MICHIGANflfCIICCGMPANY DONALDC. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 xm HQ PIMcopy January 6,
1984 Mr. J.G. Keppler', Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt, Road Glen Ellyn, IL 60137'perating License DPR-58/DPR-74 Docket Nos. 50-315/50-316
Dear Mr. Keppler:
Pursuant to the requirements of Appendix B, Part II, Nonradiological, Environmental Protection Plan, Section 3.2, a
copy of the report to the Michigan Water Resources Commission notifying them of the failure to take the Steam Generator blowdown samples for total suspended s'olids, iron and copper, is attached.
This report is required by Amendment No.
54 to Facility Operating License No.
DPR-58 and Amendment No.
40 to Facility Operating License No.
DPR-74 dated May 6, 1982.
Sincerely, W.G. Smith, Jr.
Plant Manager
/bab Attachment cc:
John E. Dolan M.P. Alexich R.F. Kroeger H. Brugger E.R.
- Swanson, RO:III R.C. Callen, MPSC G. Charnoff, Esq.
J.M. Hennigan INPO Dir., IE (40 copies)
Dir., MIPC (4 copies)
PNSRC J.F. Stietzel E.L. Townley K.R. Baker R.O. Bruggee, EPRI 840223033b 84020b PDR ADOCK 05000325
DR
4 4P<)
Il
'tf 4')()
4
)
I, '. <)9-')')3.
O(fOX
~ \\
4 4 J
%1
~ 'tQ(
~
= ~
~
V.
't 'I(4>4" (
'() ).
4f1") II<>>
- f)",
~
J
~ )
- ':,:.) ".()')(! ) e "4
~ ).
s
)~1)> [ ~'
)'(>(4
((I('.
a 44 I
'I 1()
'4
~ <)
, 4!).". (
4 ll g 1
~ g g 0:If
~
~ 4(
..3
~ >f
~ ()
I'
, ~
+ m~en j '.;.-;;; IIIIatAuAS,e!Camas EIZCTh C CayeAeV ONC SUMMITSQUARE, P. O. BOX 60. FORT WAYNE IN. 4680I Telcqhone: (2l9) 425.2II I December 12, 1983 RlC1lriRD C. DfEr'VGE Vice Prcsidcnr Mr. Paul D. Zugger Executive Secretary hlichigan Water Resources Commission Stevens T. Mason Building Box 30026 Lansing, Ml.
48909 Re:
Donald C. Cook Nuclear Plant NPDES Permit No. Ml 0005827 Steam Generator Blowdown
Dear Mr. Zugger:
A review of the I"ovember NPDES monitoring report revealed that a sample of
-"Steam Generator Blowdown Prior to It.'Iixing Cooling Water" was not obtained for total suspended solids or Iron and Copper analysis.
Upon investigation, it was found that with Nuclear Reactor Unit P2 in the start-up
- mode, the laboratory technician mistakenly thought that suspended solids and Iron and Copper samples were only to be taken in the normal running mode
~
The sampling procedure has been reviewed with the technician.
gl Very truly yours, RCM/be cc:
W. G. Smith Vice President I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents; and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
bc:
R.
W. Jurgensen T. A. Kriesel J.
A. Wojcik R.
W. Reeves/C.
E.
Hawk J.
P. Irlhite R.
E. Zahler R. C. Meng