                \                                    UNITED STATES
                                        NUCLEAR REGULATORY COMMISSION
              s                                        ucwon .
    -qy % Qifl                                      .an ma w a ~, c ,
                                                  m nexo ws . m m
                y
        * * ' *
                                                    October 29, 1998
          Charles M. Dugger, Vice President
          Operations - Waterford 3
          Entergy Operations, Inc.
          P.O. Box B
l          Killona, Louisiana 70066
;          SUBJECT: NRC INSPECTION REPORT 50-382/98-17 AND NOTICE OF VIOLATION
          Dear Mr. Dugger:
          From October 5 8,1998, a radiation protection inspection was conducted at your Waterford
          Steam Electric Station, Unit 3 reactor facility. The enclosed report presents t' scope and
          results of that inspection.
          In general, we determined that you have implemented an effective radiation protection program.
          However, the inspection identified two violations of NRC requirements.
          These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
          surrounding the violations are described in detailin the enclosed report. The violations involved
          the failure to: (1) survey an overhead work area prior to workers entering the area, and (2) limit
          the hours worked by an acting health physics supervisor to not more than 72 hours in a 7-day
          period. The second violation is similar to a violation identified in inspection Report 382/97-04.
          Please note that you are required to respond to this letter and should follow the instructions
          specified in the enclosed Notice when preparing your response. The NRC will use your
          response, in part, to determine whether further enforcement action is necessary to ensure
          compliance with regulatory requirements.
          Regarding Violation A, the NRC has concluded that information regarding the reason for the
          violation, the corrective actions taken and planned to correct the violation and prevent
            recurrenco is already adequately addressed on the docket in the enclosed inspection report.
          Therefore, you are not required to respond to Violation A, unless the description therein does
            not accurately reflect your corrective actions or your position. In that case, or if you choose to
            provide additional information, you should follow the instructions specified in the enclosed
            Notice.
            In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
            enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
!
!
,
                  9811030088 981029
                  PDR    ADOCK 05000302
                  G                      PDR
!
l
 
                                  - - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - .
  .
.
      Entergy Operations, Inc.                                                                                            -2-
      Should you have any questions concerning this inspection, we will be pleased to discuss them
      with you.
                                                                                                                        Sincerely,
                                                                                                                        Blaine Murray, Chief
                                                                                                                        Plant Support Branch
                                                                                                                        Division of Reactor Safety
                                                                                                                                                                                I
      Docket No.:    50-382                                                                                                                                                    i
      License No.: NPF-38
      Enclosures:
      1. Notice of Violation
      2. NRC Inspection Report
            50-3532/98-17
      cc w/ enclosures:
      Executive Vice President and
      Chief Operating Officer
      Entergy Operations, Inc.
      P.O. Box 31995
    Jackson, Mississippi 39286-1995
    Vice President, Operations Support
    Entergy Operations, Inc.
    P.O. Box 31995
    Jackson, Mississipni 39286-1995
    Wise, Carter, Child & Caraway
    P.0, Box 651
    Jackson, Mississippi 39205
    General Manager, Plant Operations
    Waterford 3 SES
    Entergy Operations, Inc.
    . P.O. Box B
    Killona, Louisiana 70066
    Manager - Licensing Manager
    Waterford 3 SES
    Entergy Operations, Inc.
    P.O. Box B
    Killona, Louisiana 70066
                                                                                                                                      .            - _ _ _ _ _ _ _ _ _ _ _ . _
 
                                                                _ - _ _ _ _ _ _ _ _ _ _ - _ _ - .- . . _ _ _ _ _ _ _
  .
                                                                                                                      l
-
                                                                                                                      l
      Entergy Operations, Inc.                              -3-
    Chairman                                                                                                          i
    Louisiana Public Service Commission
    One American Place, Suite 1630
    Baton Rouge, Louisiana 70825 1697
    Director, Nuclear Safety &
      Regulatory Affairs
    Waterford 3 SES
    Entergy Operations, Inc.
    P.O. Box B
    Killona, Louisiana 70066
    William H. Spell, Administrator
    - Louisiana Radiation Protection Division
    P.O. Box 82135
    Baton Rouge, Louisiana 70884-2135
    Parish President
    St. Charles Parish
    P.O. Box 302
    Hahnville, Louisiana 70057
    Winston & Strawn
    1400 L Street, N.W.
    Washington, D.C. 20005-3502
                                                                                                                    f
                                  _ _ _ _ _ _ _ _ _ _ - ___
 
  .
.
      Entergy Operations, Inc.                                  -4-
      E-Mail report to T. Frye (TJF)
      E-Mail report to D. Lange (DJL)
      E-Mail report to NRR Event Tracking System (IPAS)
      E-Mail report to Document Control Desk (DOCDESK)
      bec to DCD (IE06)
      bec distrib. by RIV:
      Regional Adminir,trator                        Resident inspector
      DRS Director                                    DRS Deputy Director
      DRP Director                                    DRS-PSB
      Branch Chief (DAP/D)                            MIS System
      Project Engineer (DRP/D)                        RIV File
      Branch Chief (DRP/TSS)                          DRS Action Item File (Goines) (98-G-
      DOCUMENT NAME: R:\_WT\WT817RP.JBN
    . To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = copy with enclosures "N" = No copy
      RIV:SRS:PSB E            RIV:SRS:PSB            E  C:DRS\PSB          E  C:DRP\D                DD:DRS        9
      *JBNicholas:nh          *MPShannon                  *BMurray -            *PHarrell              DDChaf6$5rlain
      10/ /98                  10/ /98                    10/ /98                10/ /98                1019/98
      *Previously concurred.                      OFFICIAL RECORD COPY
                                                                                                                          a
                                                                                                                          l
 
      i
      ,
    s
    .
        Entergy Operations, Inc.                                  -4
        E-Mail report to T. Frye (TJF)
        E-Mail report to D. Lange (DJL)
        E-Mail report to NRR Event Tracking System (IPAS)
        E-Mail report to Document Control Desk (DOCDESK)
        bec to DC9 (IE06)                                                                                                        l
                                                                                                                                l
        bec distrib. by RIV:                                                                                                    l
                                                                                                                                l
        Regional Administrator                        Resident inspector
        DRS D; rector                                  DRS Deputy Director
        DRP. Director                                  DRS-PSB
        Branch Chief (DRP/D)                          MIS System
                                                                                                                                l
        Project Engineer (DRP/D)                      RIV File                                                                  1
        Branch Chief (DRP/TSS)                        DRS Action item File (Gcines) (98-G-
                                                                                                                                I
'
                                                                                                                            /
                                                                                                                              /
                                                                                                                                ;
l
l'
  -
        DOCUMENT NAME: R:\_WEWT817RP.JBN
        To receive copy of document, Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
;        RIV:SRS:PSB E            RIV:SRS:PSB            E  C:DRS\PSB          E    C:DRP\D                DD:DRM 9
i        *JBNicholas:nh          *MPShannon                *BMurray                *PHarrell              DDChaf665rlain
#
          10/ /98                  10/ /98                    10/ /98                10/ /98                1019/98
i        *Previously concurred.                    OFFICIAL RECORD COPY
        030005-
.
                                                                                                                                A
}}
}}

Latest revision as of 20:01, 17 December 2020

Forwards Insp Rept 50-382/98-17 on 981005-08 & NOV Re Failure to Survey Overhead Work Area Prior to Workers Entering Area
ML20155D020
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/29/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20155D025 List:
References
50-382-98-17, NUDOCS 9811030088
Download: ML20155D020 (5)


See also: IR 05000382/1998017

Text

.. .-- . ._ .

l

.u". .,

!*

y'

f- -,,w[ ;<

.

\ UNITED STATES

NUCLEAR REGULATORY COMMISSION

s ucwon .

-qy % Qifl .an ma w a ~, c ,

m nexo ws . m m

y

  • * ' *

October 29, 1998

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

l Killona, Louisiana 70066

SUBJECT
NRC INSPECTION REPORT 50-382/98-17 AND NOTICE OF VIOLATION

Dear Mr. Dugger:

From October 5 8,1998, a radiation protection inspection was conducted at your Waterford

Steam Electric Station, Unit 3 reactor facility. The enclosed report presents t' scope and

results of that inspection.

In general, we determined that you have implemented an effective radiation protection program.

However, the inspection identified two violations of NRC requirements.

These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detailin the enclosed report. The violations involved

the failure to: (1) survey an overhead work area prior to workers entering the area, and (2) limit

the hours worked by an acting health physics supervisor to not more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day

period. The second violation is similar to a violation identified in inspection Report 382/97-04.

Please note that you are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. The NRC will use your

response, in part, to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements.

Regarding Violation A, the NRC has concluded that information regarding the reason for the

violation, the corrective actions taken and planned to correct the violation and prevent

recurrenco is already adequately addressed on the docket in the enclosed inspection report.

Therefore, you are not required to respond to Violation A, unless the description therein does

not accurately reflect your corrective actions or your position. In that case, or if you choose to

provide additional information, you should follow the instructions specified in the enclosed

Notice.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

!

!

,

9811030088 981029

PDR ADOCK 05000302

G PDR

!

l

- - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - .

.

.

Entergy Operations, Inc. -2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

I

Docket No.: 50-382 i

License No.: NPF-38

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-3532/98-17

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississipni 39286-1995

Wise, Carter, Child & Caraway

P.0, Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

. P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

. - _ _ _ _ _ _ _ _ _ _ _ . _

_ - _ _ _ _ _ _ _ _ _ _ - _ _ - .- . . _ _ _ _ _ _ _

.

l

-

l

Entergy Operations, Inc. -3-

Chairman i

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825 1697

Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

- Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

f

_ _ _ _ _ _ _ _ _ _ - ___

.

.

Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE06)

bec distrib. by RIV:

Regional Adminir,trator Resident inspector

DRS Director DRS Deputy Director

DRP Director DRS-PSB

Branch Chief (DAP/D) MIS System

Project Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS) DRS Action Item File (Goines) (98-G-

DOCUMENT NAME: R:\_WT\WT817RP.JBN

. To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = copy with enclosures "N" = No copy

RIV:SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRS 9

  • JBNicholas:nh *MPShannon *BMurray - *PHarrell DDChaf6$5rlain

10/ /98 10/ /98 10/ /98 10/ /98 1019/98

  • Previously concurred. OFFICIAL RECORD COPY

a

l

i

,

s

.

Entergy Operations, Inc. -4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DC9 (IE06) l

l

bec distrib. by RIV: l

l

Regional Administrator Resident inspector

DRS D; rector DRS Deputy Director

DRP. Director DRS-PSB

Branch Chief (DRP/D) MIS System

l

Project Engineer (DRP/D) RIV File 1

Branch Chief (DRP/TSS) DRS Action item File (Gcines) (98-G-

I

'

/

/

l

l'

-

DOCUMENT NAME: R:\_WEWT817RP.JBN

To receive copy of document, Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy

RIV
SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRM 9

i *JBNicholas:nh *MPShannon *BMurray *PHarrell DDChaf665rlain

10/ /98 10/ /98 10/ /98 10/ /98 1019/98

i *Previously concurred. OFFICIAL RECORD COPY

030005-

.

A