ML20155D020: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:.. .-- . ._ . | ||
* | |||
l | |||
.u". ., | |||
!* | |||
y' | |||
f- -,,w[ ;< | |||
. | |||
\ UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
s ucwon . | |||
-qy % Qifl .an ma w a ~, c , | |||
m nexo ws . m m | |||
y | |||
* * ' * | |||
October 29, 1998 | |||
Charles M. Dugger, Vice President | |||
Operations - Waterford 3 | |||
Entergy Operations, Inc. | |||
P.O. Box B | |||
l Killona, Louisiana 70066 | |||
; SUBJECT: NRC INSPECTION REPORT 50-382/98-17 AND NOTICE OF VIOLATION | |||
Dear Mr. Dugger: | |||
From October 5 8,1998, a radiation protection inspection was conducted at your Waterford | |||
Steam Electric Station, Unit 3 reactor facility. The enclosed report presents t' scope and | |||
results of that inspection. | |||
In general, we determined that you have implemented an effective radiation protection program. | |||
However, the inspection identified two violations of NRC requirements. | |||
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances | |||
surrounding the violations are described in detailin the enclosed report. The violations involved | |||
the failure to: (1) survey an overhead work area prior to workers entering the area, and (2) limit | |||
the hours worked by an acting health physics supervisor to not more than 72 hours in a 7-day | |||
period. The second violation is similar to a violation identified in inspection Report 382/97-04. | |||
Please note that you are required to respond to this letter and should follow the instructions | |||
specified in the enclosed Notice when preparing your response. The NRC will use your | |||
response, in part, to determine whether further enforcement action is necessary to ensure | |||
compliance with regulatory requirements. | |||
Regarding Violation A, the NRC has concluded that information regarding the reason for the | |||
violation, the corrective actions taken and planned to correct the violation and prevent | |||
recurrenco is already adequately addressed on the docket in the enclosed inspection report. | |||
Therefore, you are not required to respond to Violation A, unless the description therein does | |||
not accurately reflect your corrective actions or your position. In that case, or if you choose to | |||
provide additional information, you should follow the instructions specified in the enclosed | |||
Notice. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its | |||
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR). | |||
! | |||
! | |||
, | |||
9811030088 981029 | |||
PDR ADOCK 05000302 | |||
G PDR | |||
! | |||
l | |||
- - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - . | |||
. | |||
. | |||
Entergy Operations, Inc. -2- | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them | |||
with you. | |||
Sincerely, | |||
Blaine Murray, Chief | |||
Plant Support Branch | |||
Division of Reactor Safety | |||
I | |||
Docket No.: 50-382 i | |||
License No.: NPF-38 | |||
Enclosures: | |||
1. Notice of Violation | |||
2. NRC Inspection Report | |||
50-3532/98-17 | |||
cc w/ enclosures: | |||
Executive Vice President and | |||
Chief Operating Officer | |||
Entergy Operations, Inc. | |||
P.O. Box 31995 | |||
Jackson, Mississippi 39286-1995 | |||
Vice President, Operations Support | |||
Entergy Operations, Inc. | |||
P.O. Box 31995 | |||
Jackson, Mississipni 39286-1995 | |||
Wise, Carter, Child & Caraway | |||
P.0, Box 651 | |||
Jackson, Mississippi 39205 | |||
General Manager, Plant Operations | |||
Waterford 3 SES | |||
Entergy Operations, Inc. | |||
. P.O. Box B | |||
Killona, Louisiana 70066 | |||
Manager - Licensing Manager | |||
Waterford 3 SES | |||
Entergy Operations, Inc. | |||
P.O. Box B | |||
Killona, Louisiana 70066 | |||
. - _ _ _ _ _ _ _ _ _ _ _ . _ | |||
_ - _ _ _ _ _ _ _ _ _ _ - _ _ - .- . . _ _ _ _ _ _ _ | |||
. | |||
l | |||
- | |||
l | |||
Entergy Operations, Inc. -3- | |||
Chairman i | |||
Louisiana Public Service Commission | |||
One American Place, Suite 1630 | |||
Baton Rouge, Louisiana 70825 1697 | |||
Director, Nuclear Safety & | |||
Regulatory Affairs | |||
Waterford 3 SES | |||
Entergy Operations, Inc. | |||
P.O. Box B | |||
Killona, Louisiana 70066 | |||
William H. Spell, Administrator | |||
- Louisiana Radiation Protection Division | |||
P.O. Box 82135 | |||
Baton Rouge, Louisiana 70884-2135 | |||
Parish President | |||
St. Charles Parish | |||
P.O. Box 302 | |||
Hahnville, Louisiana 70057 | |||
Winston & Strawn | |||
1400 L Street, N.W. | |||
Washington, D.C. 20005-3502 | |||
f | |||
_ _ _ _ _ _ _ _ _ _ - ___ | |||
. | |||
. | |||
Entergy Operations, Inc. -4- | |||
E-Mail report to T. Frye (TJF) | |||
E-Mail report to D. Lange (DJL) | |||
E-Mail report to NRR Event Tracking System (IPAS) | |||
E-Mail report to Document Control Desk (DOCDESK) | |||
bec to DCD (IE06) | |||
bec distrib. by RIV: | |||
Regional Adminir,trator Resident inspector | |||
DRS Director DRS Deputy Director | |||
DRP Director DRS-PSB | |||
Branch Chief (DAP/D) MIS System | |||
Project Engineer (DRP/D) RIV File | |||
Branch Chief (DRP/TSS) DRS Action Item File (Goines) (98-G- | |||
DOCUMENT NAME: R:\_WT\WT817RP.JBN | |||
. To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = copy with enclosures "N" = No copy | |||
RIV:SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRS 9 | |||
*JBNicholas:nh *MPShannon *BMurray - *PHarrell DDChaf6$5rlain | |||
10/ /98 10/ /98 10/ /98 10/ /98 1019/98 | |||
*Previously concurred. OFFICIAL RECORD COPY | |||
a | |||
l | |||
i | |||
, | |||
s | |||
. | |||
Entergy Operations, Inc. -4 | |||
E-Mail report to T. Frye (TJF) | |||
E-Mail report to D. Lange (DJL) | |||
E-Mail report to NRR Event Tracking System (IPAS) | |||
E-Mail report to Document Control Desk (DOCDESK) | |||
bec to DC9 (IE06) l | |||
l | |||
bec distrib. by RIV: l | |||
l | |||
Regional Administrator Resident inspector | |||
DRS D; rector DRS Deputy Director | |||
DRP. Director DRS-PSB | |||
Branch Chief (DRP/D) MIS System | |||
l | |||
Project Engineer (DRP/D) RIV File 1 | |||
Branch Chief (DRP/TSS) DRS Action item File (Gcines) (98-G- | |||
I | |||
' | |||
/ | |||
/ | |||
; | |||
l | |||
l' | |||
- | |||
DOCUMENT NAME: R:\_WEWT817RP.JBN | |||
To receive copy of document, Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy | |||
; RIV:SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRM 9 | |||
i *JBNicholas:nh *MPShannon *BMurray *PHarrell DDChaf665rlain | |||
# | |||
10/ /98 10/ /98 10/ /98 10/ /98 1019/98 | |||
i *Previously concurred. OFFICIAL RECORD COPY | |||
030005- | |||
. | |||
A | |||
}} | }} |
Latest revision as of 20:01, 17 December 2020
ML20155D020 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 10/29/1998 |
From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Dugger C ENTERGY OPERATIONS, INC. |
Shared Package | |
ML20155D025 | List: |
References | |
50-382-98-17, NUDOCS 9811030088 | |
Download: ML20155D020 (5) | |
See also: IR 05000382/1998017
Text
.. .-- . ._ .
l
.u". .,
!*
y'
f- -,,w[ ;<
.
\ UNITED STATES
NUCLEAR REGULATORY COMMISSION
s ucwon .
-qy % Qifl .an ma w a ~, c ,
m nexo ws . m m
y
- * ' *
October 29, 1998
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
l Killona, Louisiana 70066
- SUBJECT
- NRC INSPECTION REPORT 50-382/98-17 AND NOTICE OF VIOLATION
Dear Mr. Dugger:
From October 5 8,1998, a radiation protection inspection was conducted at your Waterford
Steam Electric Station, Unit 3 reactor facility. The enclosed report presents t' scope and
results of that inspection.
In general, we determined that you have implemented an effective radiation protection program.
However, the inspection identified two violations of NRC requirements.
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detailin the enclosed report. The violations involved
the failure to: (1) survey an overhead work area prior to workers entering the area, and (2) limit
the hours worked by an acting health physics supervisor to not more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day
period. The second violation is similar to a violation identified in inspection Report 382/97-04.
Please note that you are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. The NRC will use your
response, in part, to determine whether further enforcement action is necessary to ensure
compliance with regulatory requirements.
Regarding Violation A, the NRC has concluded that information regarding the reason for the
violation, the corrective actions taken and planned to correct the violation and prevent
recurrenco is already adequately addressed on the docket in the enclosed inspection report.
Therefore, you are not required to respond to Violation A, unless the description therein does
not accurately reflect your corrective actions or your position. In that case, or if you choose to
provide additional information, you should follow the instructions specified in the enclosed
Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
!
!
,
9811030088 981029
PDR ADOCK 05000302
G PDR
!
l
- - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - .
.
.
Entergy Operations, Inc. -2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Blaine Murray, Chief
Plant Support Branch
Division of Reactor Safety
I
Docket No.: 50-382 i
License No.: NPF-38
Enclosures:
1. Notice of Violation
2. NRC Inspection Report
50-3532/98-17
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississipni 39286-1995
Wise, Carter, Child & Caraway
P.0, Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
. P.O. Box B
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
. - _ _ _ _ _ _ _ _ _ _ _ . _
_ - _ _ _ _ _ _ _ _ _ _ - _ _ - .- . . _ _ _ _ _ _ _
.
l
-
l
Entergy Operations, Inc. -3-
Chairman i
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825 1697
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
William H. Spell, Administrator
- Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
f
_ _ _ _ _ _ _ _ _ _ - ___
.
.
Entergy Operations, Inc. -4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE06)
bec distrib. by RIV:
Regional Adminir,trator Resident inspector
DRS Director DRS Deputy Director
DRP Director DRS-PSB
Branch Chief (DAP/D) MIS System
Project Engineer (DRP/D) RIV File
Branch Chief (DRP/TSS) DRS Action Item File (Goines) (98-G-
DOCUMENT NAME: R:\_WT\WT817RP.JBN
. To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = copy with enclosures "N" = No copy
RIV:SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRS 9
- JBNicholas:nh *MPShannon *BMurray - *PHarrell DDChaf6$5rlain
10/ /98 10/ /98 10/ /98 10/ /98 1019/98
- Previously concurred. OFFICIAL RECORD COPY
a
l
i
,
s
.
Entergy Operations, Inc. -4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DC9 (IE06) l
l
bec distrib. by RIV: l
l
Regional Administrator Resident inspector
DRS D; rector DRS Deputy Director
DRP. Director DRS-PSB
Branch Chief (DRP/D) MIS System
l
Project Engineer (DRP/D) RIV File 1
Branch Chief (DRP/TSS) DRS Action item File (Gcines) (98-G-
I
'
/
/
l
l'
-
DOCUMENT NAME: R:\_WEWT817RP.JBN
To receive copy of document, Indicate in box: *C" = Copy without enclosures *E" = Copy with enclosures *N* = No copy
- RIV
- SRS:PSB E RIV:SRS:PSB E C:DRS\PSB E C:DRP\D DD:DRM 9
i *JBNicholas:nh *MPShannon *BMurray *PHarrell DDChaf665rlain
10/ /98 10/ /98 10/ /98 10/ /98 1019/98
i *Previously concurred. OFFICIAL RECORD COPY
030005-
.
A