Nuclear Licensing Administrator LOD:mae attachment cc:  Director of Inspection and                                                        dA Enforcement                                                                /f70 g
Nuclear Licensing Administrator LOD:mae attachment cc:  Director of Inspection and                                                        dA Enforcement                                                                /f70 g
                                                                                                '
                                                                         \of\  U\\
                                                                         \of\  U\\
4 'i l P, 7910020        ig'
4 'i l P, 7910020        ig'
                                                                                 \}}
                                                                                 \}}

Latest revision as of 01:02, 2 February 2020

Forwards Sargent & Lundy Final Rept Re Deficiency in Ventilation Stack Reported in LO Delgeorge 790606 Ltr. Restoration of Design Basis Capacity Indicated in Encl Rept Was Initiated in Aug 1979 & Will Be Completed by May 1980
ML19249E792
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/21/1979
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19249E793 List:
References
NUDOCS 7910020441
Download: ML19249E792 (1)


Text

. L+

Commonwealth Edison

@ Chicago. Ilhnois 60690 Cne First National Plaza. Chicago. Ilkno[s Address Reply to: Post Office Box 767 September 21, 1979 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III '

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

LaSalle County Station Units 1 and 2 Ven: Stack - Final Report NRC Docket Nos. 50-373/374 Reference (a): L. O. DelGeorge letter to J. G.

Keppler dated June 6, 1979

Dear Mr. Keppler:

As was reported in Reference (a), defects identified in the LaSalle County ventilation stack has led to the re-evalua ion and modification of the stack. Attached for your inforiation is a comprehensive summary of the inr faction, testing and design evaluation conducted by Sargent & Luncy with Commonwealth Edison to resolve the deficienc, "dentified.

As is indicated in the attached report, a permanent repair will be implemented to restore the 'lesign basis capacity of the stack. This work was initiated in August, 1979 and is expected to bt completed by May, 1980.

If you have any questions on this submittal, please direct them to this office.

Very truly yours, 7)

DelGeorge"

/0 _

L. O.

Nuclear Licensing Administrator LOD:mae attachment cc: Director of Inspection and dA Enforcement /f70 g

\of\ U\\

4 'i l P, 7910020 ig'

\