[M;$ - {9 ' g j _. y,
vi l
&m S
y
$ ',,'..ja
'. p /
'f, Commonwealth Edison '
f
,1,
,' 4 : ji 72 West Adams Street, Chicago, Illinois N:' ',
A
,~
f ATdress Reply to: Post Omc3 Box 167~
j.!"
gg
%>. : Chicago, lihnois 60690 0767 '
,.- l E i i
s w
October 24, 1989 T.
~ x
~y a
Y$.
t C
T Dr.-Thomas E. Murley, Director-e' Offlee of Nuclear Reactor Regulation U.S.' Nuclear Regulatory Commission Washington, DC 20555 Q,
')
ql t
Subject:
LaSalle County Station Units 1 and 2 d
Inservice Testing (IST) Program l
E C Dx tet Nos. 50-373 and 50-374 q
4 Reference (a):. H.E. Morgan letter to T.E. Murley dated' October 2, 1989 (LaSalle County Station Units'1 and 2) Inservice Testing (IST)' Program.
,e t
Dear Dr. Murley:
i Reference (a) transmitted LaSalle County Station's Inservice Testing Program (Revision 2).
For clarification purposes, the attached document provides a summary of the changes made in Revision 2 of the LaSalle County.
' Station Inservice Testing Program.
If'there are any further questions regarding this matter, please' f
contact this office.
Very truly yours, W
6:
H. 4 Morgan Nuclear Licensing Administrator im Attachment i'
cc:
P.C. Shemanski - Project Manager, NRR AoT7 A.B. Davis - Regional Administrator, RIII I
t I
Senior Resident Inspector - LaSalle County i
t 0340T:8 s
8911010179 891024 o,
1:
PDR ADOCK 05000373
9:.,
.P PDC a
't m
's c
- Inservice Testing Program' i
y Summary of Changes for Revision 2 i
R
)
t
- r
REFERENCES:
1)
AIR NO. 373-104-89-00400. documents response to Generic.
l Letter 89-04, i
l 2)
AIR NO. 373-251-88-00226, documents review of the IST L,;
program to the Q-List (list of safety-related components).
f
+
The Inservice. Testing Program for pumps and valves is being revised based
- m on Generic Letter 89-04 (documented in reference 1).
The scope of the IST Program was also ' reviewed carefully to ensure the inclusion of the necessary pumps and valves in the program. This was accomplished by using LaSa11e's 3
Q-List and Component Classification documents. The following is a short
~;
}
discussion of the program changes.
A:
c
,SECTIOt in Table of Contente f
1.
A " Technical' Approach (es) and Position (s)" section was added to the j
IST program, therefore, it is referenced in the ' contents section.
?-
+
SECTION 21 Inmarvice' Testina Procram Descrintion
.[
2.2 - Innervlee Testina
,j, 1.
Added requirement to identify approval document to each relief request and cold shutdown justification (2.2.1.7).
2..
.Added section 2.2.3 which discusses when and why a Technical l
Approach / Position is Utilised.
', l '
~
SECTIGt 31 Format Leoend and Notes 3.0 - AEME Class 1.
2, and 3 Pumns a
1.
Added " Technical Approach (es) and Position (s)" to the field section 1
for pumps. The description is also given for the new field. The
" notes" field was changed to No. 13.
3 I
6 E
ZCADBULL p,g, y 1
i
-. m
q g.
' (c.
s
+.
4-
+
,;.- :v 1
' ' i a:..s.
' j.
i i
l
,1
?.
, Inservice Testing Program-Summary.of Changes for Revisior 2 l
2.
mad 3 Valves 3.'1 - ARMR Clama ~1.
i 1.
The field section for valves has been changed.
" Technical-Approach (es) and Position (s)" was labeled No.10 and replaced the "masimum stroke time" field. The maximum stroke time will not be.a part of the NRC submittal due'to establishing limiting values of
-f 'I full-stroke based on reference values.
2.
Added " disassemble and inspect"'(DI) an a new test type.
f 3.
Test abbreviation SA (semi-annual) has been added to the " test schedule" field.
SECTION di Innervice Testina Plan-Pumns
^
1.
.A " Technical Approach (es) and Position (s)" column was added prior to the'" notes" field. The " notes" column became field no.13.
SECTION 51 Pumn Relief Reauesta p
?.
1.
An " Approval / Reference Document (s)" field was added to each relief
[
?-
request to depict the approval document or identify any applicable l
reference (s) used.
SECTION 6:
Inservice Teatino Plan - Valves Svatem Description
~
ALL 1.
Added TP-01 to all power operated valves that are stroked timed.
CM 1.
All SOVs will use the " rapid-acting valves" position per RV-56.
DG 2.
1(2)DG049A/B, ODG023A/B, 1(2)E22-F362A/B (DG air compressor i
discharge check valves) have been classified as active class 3 components, and therefore will be tested in the IST program per 7
1 RV-51.
s
\\
l I
i hy I
d ZCADBULL Page 2 v
k':
k@
l s
1 i ? kW '
4 o,_ f'.i 1
a i
(
3
, Inservice Testing program
.i Summary of Changes.for Revision 2
! "4
.J Inzervico Testl' a Plan - Valven J'~
SECTION 6:
n f
System Descrintian IKi 2.
1(2)DG055A/B, ODG029A/B, 1(2)E22-f369A/B, 1(2)E22-F370A/B (DG
'i' Air Receiver Check Valves) have been added to the IST program t
even=though they are non-code. 'At LaSalle they are considered 3'
to be safety-related passive, but a setpoint test will be' performed to ensure their operational readiness.-
DO 1.
1(2)DOO24 have been classified as passive and will be deleted
- t from the IST program.
FC 1.
1(2)TC105A/B have been deleted from the IST program due to the-u fact.that FC is a non-safety related system and does not fall j
within the scope of the IST program.
l 1
HG 1..
1(2)HG017A/B '(H2 Recombiner Water-Spray cooler supply CV's) have i
been classified as active class 2 valves and will be included in I
the'IST program. A cold shutdown justification (CS-53) has been written describing their test method and equivalent cold shutdown frequency.
i-2.
1(2)HG016 and 1(2)HG007 have also been classified active and will be tested in the IST program per Tech Specs on a 6 month 3
frequency. A c/s justification (CS-54) has been written describing the basis for this test frequency.
l HP 1.
1(2)E22-F006 (Water Leg Pump Disch Check Valves) have been added
[
to the IST program. A relief requent (RV-50) has been written for testing the plants ECCS WL pump discharge check valves.
It c'
also explains why the upstream cv's must be disassembled and
~
inspected during reactor refueling per RV-46.
E IA 1.
The outboard MSIV accumulatur check valves have been moved from IN to IA system designation.
^
I IN 1.
INO31, IN100, and IN101 solenoid valves will use RV-56,
" rapid-acting valves" position.
5 LP 1.
1(2)E21-F034 (Water Leg Pump Discharge Stop Check Valves) have j
been added to the program. These valves will be tested 1
quarterly per RV-50.
j' 2.
1(2)E21-F033 (water leg pump disch cv/s) testing methods have been changed to partial exercising quarterly per RV-50 with K
disassembly and inspection during refueling outages per RV-46.
li:
t
)
ZCADBULL Page 3 u
f.- y '
,3
?1 I,'i s
,s Inservice Testing Program
. Summary of Changes for Wevision 2 9
SECTION 6:
Inservice Testina' Plan - Valves System Description
'MS 1.
1(2)E32-F010,'1(2)E32-F011, 1(2)E32-F310A/B/C/D have been added to the IST program due to the component classification review.
These' valves have been determined to be class 2, active
<o components ~. Disassembly and inspection is the method of testing which will be used on a reactor refueling basis per RV-52 and RV-46.
'NR 1.
The following valves are non-code, however,.they are safety-related active. The valves are currently exercised and' leak tested per Technical Specifications, however, now they i
require a stroke time and PIT per GL 89-04.
.a.
1(2)C51-C004A b.
1(2)C51-C004B c.
1(2)C51-C004C d.
1(2)C51-C004D e.
1(2)C51-C004E
?
i RD 1.-
The 1(2)C11-D001-115 and 1(2)C11-D001-138 valves have been added to the program per GL 89-04.
Relief Request RV-45 documents the testing methods.
RH 1.
1(2)E12-F060A/B (will use RV-56), 1(2)E12-F075A/B (will use RV-56): process sample valves are class 2, active and will be tested per normal code testing methods.
2.
1(2)E12-TC89/93/94/97, are also going to be added to the IST program. These valves'have been determined to perform a safety-related function and will be tested per normal code testing methods.
t r
3.
The 1(2)E12-F046A/B/C minimum flow line check valves will be partially stroked quarterly per RV-49, and disassembled and inspected per RV-46 per GL 89-04.
4.
1(2)E12-F040A/B, RHR drain isolation valves to radwaste are class 2, active and will be tested per normal code testing methods.
l L'
i i
n; f'
i
)>
Page 4 ZCADBULL m
l-r
n{ g,
u
/..
e
- o, m.-
.s.
n-
's
,e y,
~ ' '
s,..,
vr, Inservice' Testing Program l
Summary'of Changes forJRevision.2.
s.
SECTION'6t- -Innervice Testina Plan ~- Valygg E,
Sy.g tagg Description
'5 RH '.
?l.<
'The'following relief valves have had their classification changed to passive (per reference 2), however, they will remain in the IST. program and the setpoint. testing will continue.
i a.
1(2)E12-F005s_
h.
1(2)E12-F088A j
b.
1(2)E12-F025A 1.
1(2)E12-F088B
.c.
1(2)E12-F025B j.
1(2)E12-F088C d.
1(2)E12-F025C k.
1(2)E12-F311A
[
e.
1(2)E12-F030-1.
1(2)E12-F311B' f.
1(2)E32-F055A' m.
1(2)E12-F313A
'g.
1(2)E12-F0558 n.
1(2)E12-F313B y
5.
1(2)E12-F073A/B and 1(2)E12-F074A/B have been changed to active. They are already esercised in a station surveillance, however, they must now be stroke timed and have a position-a indication test performed for the IST program.
6.
1(2)E12-F084A/B/C (Water Leg Pump Disch CV's) will be added to p
the IST program. They will be partial stroke tested quarterly.
per RV-50 with disassembly and inspection every refuel outage per RV-46.
7.
1(2)E12-F085A/B/C (Water Leg Pump CV's) have been added to the program and will be tested quarterly pet.RV-50.
t RI 1.
1(2)E12-F036A/B have been given a pessive classification, however, testing will continue as with other relief valves.
t 2.
TP-02 was added to E51-F028/F040/F047 valves to document and 1
clarify testing in the IST program.
i l-l I
w P
t L
/
P t
I i ^
i.
ZCADBULL Page 5
!~
'a l
[Q(,p i 4
.)
_,_as 4,
L. L '.
- I*
4% v
- .4
-Inservice Testing Program i
{J Summary of Changes'for Revision 2 7
ur :
1
- I'
'd.. \\
Innervice Testina Plan - Valves "l
RECT 10N-6
)
0:
Egitta Description q
RR 1.
The following valves are presently tested per LOS-PC-R1, j
2 however, due to reference 1 these valves are'now required tv be y
added to the IST program'(CIVs, Appendix J osempted).- The L
inboard valves can on3y be tested during c/s or refueling outages, but the outboard valves can.be tested quarterly.. C5. J5 explains the c/s basis.
a.'
1(2)B33-F338A 1.
1(2)B33-F342A
[
b.
1(2)B33-F338B
- j. 1(2)B33-73428.
4 i,
c.
1(2)B33-F339A-k.
1(2)B33-F343A l
(
d.
1(2)B33-F3398
- 1. '1(2)B33-F343B e.
1(2)B33-F340A-m.
1(2)B33-F344A
.f.
1(2)B33-F340B n.
1(2)B33-F344B' f.
g.
1(2)B33-F341A o.
1(2)B33-F345A I
4 h.
1(2)B33-F341B p.
1(2)B33-F345B O<
The following relief valves have been deleted from the IST RT 1.
' program since the reactor water cleanup system is non-safety E
-related.
l j
)
a.
1(2)G33-F339A d.
1(2)G33-F340B b.
1(2)G33-F339B e.
1(2)G33-F341A t
~ c.
1(2)G33-F340A f.
1(2)G33-F341B f
VG3 1.
1(2)VG0001 and VG0003 are classified as class 3 active valves and have been added to the IST program. Testing will include bn
' stroke timing and PITS.
F I
' VQ '
1.
VQ041 is a non-code valve and has been deleted from IST per E'
reference 2 documentation. The valves are classified as passive.
i' SECTION 7e Valve Rollef Recuests/ Cold Shutdown Justifications
-[
1:
_(. '
ALL An " Approval / Reference Document (s)" field was added to each relief request and cold shutdown justification to depict the approval document or identify any applicable reference (s) used.
L e
lIs s
t i,
s.
)
5 I:'
[
ZCADBULL Page 6 E
Si
p; - -
Y
.t,
,.g.)..
i t...
, + ' -
l
+
4..i, c!
' Inservice. Testing Program gs fi.
Summary of Changes for Revision 2
?$s'
)
1 SECTION 71 Valve Reljaf Reaumata/ Cold Ehutdown Justificationa
-Y 1-RV. Describes the basis for relief and alternate test methods for i
p the Gontrol Rod Drive.(CRD) charging water header cv's and the
[" ~
CRD' coo'.ing water cv's.
t
- 2..RV-46; Describes the GL 89-04 approved alternative to full-stroke esercising check. valves -- disassembly and inspection.
t 3.
RV-47 Explains the' basis for relief and alternate testing for the LPCS motor cooler water outlet ev's~which deviates from c0de testing l because it only proves a partial stroke according to Generic Letter 89-04.
L 4.
RV-48 (RCIC min flow line cv's); The present testing only proves a partial stroke according to Generic Letter 89-04.
This' relief request explains the basis for relief and testing method for-these valves.
- d 5.
RV-49.
(LPCI min flow line ev's);' Explains basis for relief and alternate test methods for these. valves.
IS i
6.
RV-50 (Water leg pump discharge cv's); Describes the reasoning and method of testing these valves.
7.
RV-51 Describes the basis for relief and alternate testing for the DG, compressor discharge cv's which have been added to the IST 3
i-program.
8.
RV-52 Explains basis for relief and alternate testing for the MSIV-LCS Cv's.
9.
CS-53 (Hydrogen Recombiner water-spray cooler supply cv's); Describes the reasoning behind the method of testing these. valves once a year (equivalent to c/s testing) for the IST program.
i 10.
CS-54 (Hydrogen Recombiner containment suction ev's); Explains basis for cold shutdown testing of these valves.
11.
CS-55 (Reactor Recirc hydraulic line inboard cv's); Describes the basis for relief and why these valves will be tested only during refueling outages. Explains that the outboard valves con be
[
i tested quarterly.
g.
12.
CS-56 Describes the limits imposed on rapid-acting solenoid valves in t
the IST program per the NRC staff's position described in GL 89-04.
)'
l i,
ZCADBULL Page 7 p
+
$N ' 'S
,y
>+,r.
./
w,
,4 m
q:-.
. p.
. m e '. :.,=,,.
Q-c s.?
'i' Inservice Testing Program 4
S weary of Changes-for Revision 2 I
'EECTItM'as-Technical Approachas and Positions
- 1.
TP-01' Developed to describe stroke, time testing of valves in'the IST program and the acceptance criteria involved with establishing alert and required action rLage limits.
F Describes the method'of-full-stroke' testing'of the T
'2.
TP-02:
E51-r028/F040/F047 RCIC systern ev's.
p.,
.in I
<1
.J e,
C.
t i:
2
?
$2
~
c
}:
T
'.i l-t.-
j.
+
li i
.4.i 0
1, f.
jL j.;
9 '.-
r J
)
i
},
ZCADBULL Page O t
6 9
w.
,...m.