Commonw:alth Edison T
't
\\ " e)'.1400 Opus Place 1.
1 Wg% ~ t t
Downers Grove, Iliinois 60515 i
~v f
+
July 27,.1990
,4 Mr' A. Bert Davisc 1
Regional' Administrator-U.S. Nuclear Regula. tory Commission' 1
- Region.III
- .
A-c799 Roose/eltLRoad-Glen Ellyn,'IL :601373
Subject:
LaSalle County Station Units 1 and 2:
- Response to Inspection ReportL50-373/90012
(
and-50-374/90013 NRC Docket Ne'
. )-)73 'and 50-374; 4
Reference:
(a) H.J.~ Miller letter to C. Reed.
dated July 27',11990.
Dear Mr.= Davis:
.This letter is in response-to reference (a).where Commonwealth l
Edison's LaSalle County Station was requested to provide a: response: addressing
.the program for correct repetitive local' leak rate failures. ~
The following attachment provides.thefcommonwealth Cdison response:to this request.
~i If you have any further questions regarding._this matterT please i
contact this office.
Very.truly yours, b
. -\\
.l H. E.
argan
. Nuclear Licensing Administrator J
p n
cc:
NRC Resident. Inspector - LSCS l-
'l
\\
1mw/10132 9009iio~o97 9997,,
{DR ADOCK 05000373 PDC AUG 14 mo
' I c
, _\\/\\
Bib.Qfa i
-y
.f ATTACHMENT l
-(
50-373/90012 (30-374/90013)6 j
ImRalle Response'to Inspection Rgoort
.g
-Renardinn Repetitive Local Leak Rate Test Failurgg; q
1 w
In response lto Inspection' Report' 50-373/90012',LLaSalle Statidn.was?
i
[
c requested to. address the program 1forLeerrecting_ repetitive <1ocal-leak: rate; h
p-
- failures'. LaSalle Station = believes they;have impien ted an effective programi i
)
for identifying'and' correcting repetitivellocall leak rate failures.- This is' lj L
. achieved.through testing, Licensee Event' R Tort l(LER) investigation, 'and:
'O engineering' analysis ' to dete'rmine short' and'long term. corrective actions. : The) j success of.this' method.is demonstratedhin)the referenced. inspection report l l
^
h regarding'Feedwater^ Check Valves. ELaSa11e' Station has initiated additional-i j" '
programs for' addressing the; repetitive local leak rateLfa11urescfor certain affected primary containment penetrations. These-affected. primary containment
~
~
' penetrations. along with~their specific corrective ' actions-- are - 1f sted' as :
^
follows:
1 Reactor' Water'Cleanuo'(RWCU):
-An' Engineering investigation will be conducted regarding possible. replacement?
or modification programs forithe.RWCU Suction 1Line. Isolation Valves,-
1(2)G33-F001 and 1(2)G33-F004.
.The final-replacement and/or modification 1
~
program chosen'willLensure minimum leakage through these valves._ Due to the time' constraints associated with replacement of=these valves,LLaSalle-Station =
l
~I has decided not to' install a different type.of_ valve for this application L
during the next refueling outage, as origina11y' scheduled.'
l t
Main Steam Isolation Valve Outside Drains-1 An Engineering investigation'similar to'the investigation for the RWCUfEu'ction j
Line Isolation Valves will be conducted for the Main Steam' Isolation Valre-t Outside Drain Valves,-1(2)B21-F067A/B/0/D.
'l Drvwell Floor Drains and Eauloment Draina ' (DWFD.~ 'DWED)
LaSalle Station has identified that the:cause of the local leak rate testi i
failures'for the Drywell Ficor/ Equipment Drain Sump as being.fo'eignsobjects q
r becoming caught in the valve seats.' These objects;have entereditheLDWFD/DWED systems through their Drywell Sumps.
LaSalle Station;is:investigatingithe use of: filtering screens to be-placed in the DWFD/DWED' Sumps duringcextended-(refuel) outages.
In~ addition, LaSalle Station is considering per'. odic inspection and c?eaning of the subject. sumps.
It is expected that placing:the
,3 temporary screens in the subject sumps as well as periodic inspections of the-L sumps will prevent foreign objects f rom being caught in the DWFDS/DWEDS -
1 Isolation Valves.
l t
l I
~
'l g.
1
.% v -
a 4
,y y ;;
1
- i;-,
,ch 4
- Nc
'f~
4 5
- .,; );$?, p-
-]
3 :-
.. g.
5 a
J.
LlIbaide MSIV Draina. C M ustible Gan' Control'.
4 Chilled Cleanina Pronram' 39 hfter reviewing the local. leak.rateitest history.ofithe valves-described in Sections 5.c.e,f, and g ofLthe-Inspection.' Report,"LaSa11e' Station believes that the subject f ailures are not' repetitive bht sporadic in nature.
LaSalle Station:will review the local leak rate-test results'for thelsubject
. penetrations'at the end.of--theLUnit 2. fourth refueling outagelin order to s
l identify any further failure trends'.that;could be' regarded as. repetitive; Based upon=the future local ~ leak rate test results for these penetrations,
(
additional programs ~for minimizing valve leakages may be incorporated.:
- To ensure completion of these' actions,; all' of. the' above mentioned.
Engineering investigations and followup corrective'-actions will be' tracked by.
~
l the:LaSalle Station. Commitment Tracking System.:
rf
.I
{
4
- L l.
i a
- i