L+
@ Chicago. Ilhnois 60690 Commonwealth Edison Cne First National Plaza. Chicago. Ilkno[s Address Reply to: Post Office Box 767 September 21, 1979 Mr. James G.
Keppler, Director Directorate of Inspection and Enforcement - Region III U.S.
Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
LaSalle County Station Units 1 and 2 Ven: Stack - Final Report NRC Docket Nos. 50-373/374 Reference (a):
L. O. DelGeorge letter to J. G.
Keppler dated June 6, 1979
Dear Mr. Keppler:
As was reported in Reference (a), defects identified in the LaSalle County ventilation stack has led to the re-evalua ion and modification of the stack.
Attached for your inforiation is a comprehensive summary of the inr faction, testing and design evaluation conducted by Sargent & Luncy with Commonwealth Edison to resolve the deficienc, "dentified.
As is indicated in the attached report, a permanent repair will be implemented to restore the 'lesign basis capacity of the stack.
This work was initiated in August, 1979 and is expected to bt completed by May, 1980.
If you have any questions on this submittal, please direct them to this office.
Very truly yours, 7)
/0 L. O. DelGeorge" Nuclear Licensing Administrator LOD:mae attachment cc: