Forwards Supplemental Response to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions
ML20055H766
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/24/1990
From: Morgan W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-***, TASK-OR GL-90-03, GL-90-04, GL-90-3, GL-90-4, IEB-80-14, IEB-80-17, NUDOCS 9007300034
Download: ML20055H766 (4)


Text

_

(

C .. j Commonweahh Edison

.. ,1400 Opus Place

\ Donners Crove, Ilunois 60515 I .

July 24, 1990 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20S55

Subject:

LaSalle County Station Units 1 and 2 Supplemental Response to Generic Letter 90-04 (Status of Licensee Implementation of Generic Safety Issues)

MRC_DQChet Nos. 50-373 and_50-314

Reference:

(a) J.G. Partlow letter to All Holders of Operating Licenses dated April 25, 1990.

(Generic letter 90-04)

(b) H.E. Morgan letter to NRC dated L June 29, 1990.

Dear Sirs:

The above refer 0nced letter requested that all licensee's review and provide documentation of the current implementation status of all generic safety issues (GSIs) identified within the letter that apply to their j respective facilities.

Reference (b) Submitted the Commonwealth Edison LaSalle County Station response to the requested information. This transmittal supplements reference (b) to include additional reference documents that provide additional documentation of the current implementation status of all generic safety issues identified in reference (a).

Please direct any questions you may have regarding this metter to

'this office-Very truly yours.

H . Morgan.

Nuclear Li nsing Administrator cc: A.B. Davis, Regional Administrator - Region III ) /

R. Pulsifer , Project Manager - NRR /( i Senior Resident Inspector - LSCS

/Imw/ID46 9007300034 900724 PDR ADOCK 05000373 ()

P PDC

?,. AIIACHMLHI

. FACILITY NAME: LaSallt Couaty_S.tition DOCKET NO.: 3131211 LICENSEE: CommonyealttLEdhoILCO2 SIAIULOLLIC ENSE LIMELEMEKIA110R_0LGENERIC_SAEEILIS SU ES RESOLVED _B11tLJ ME051110!LDLREQUIREMENIS_Oll.CORRECILVLACTIONS GSIliMEA_Mo.d SlAIUS COMMEKIS 40 (B065) U-1 C NVREG-0519, Supplement 4, 7/82 l U-2 NC 41 (B058)' U-1 C NUREG-0519, IR 373/86-17 closed U-2 NC License Condition 81-00-10.

IR 373/81-40 closed IE Bulletin 80-14 IR 373/82-13 closed IE o Bulletin 80-17.

l-43 (B107) U-1 & 2 I Final upgrade of specific operating procedures are not completed. Expected completion l date is December 1990.

51 (L913)- U-1 & 2 I 1/29/90 M.H. Richter letter to NRC. Evaluations completed.

Modifications and procedure im-piementation. expected to be completed: U-1, 5/27/91 U-2, 2/24/92 67.3.3 (A017) U-1 & 2 I .3/10/86 C.M. Allen letter to H.R.

Denton, 8/20/87 D. Huller letter to L.D. Buttterfleid, IR 373/88027 and IR 374/88026.

I Neutron Monitoring is open issue.

L Ceco response to be deferred until

!. all significant issues on the subject between the NRC and the BWR Owner's Group are resolved.

75 (B076) Item 1.1 U-1 & 2 C 11/5/83 P.L. Barnes. letter-to H.R.

Denton. 7/12/85 H.R. Butler .

letter to D.L. Farrar.

l-75 (8085) Item 1.2 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R.

Denton. 5/24/85 H.R. Butler letter to D.L. Farrar.

ID46-2 I i

e 1

[, . <

, 75 (B077) Item 2.1 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R. I Denton. Part 1 - 6/23/86 E.G.

Adensam letter to D.L. Farrar, i Part 2 - 12/29/88 P.C. Shemanski letter to H.E. Bliss.

75 (8086) Item 2.2.1 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R. i Denton. 11/24/89 J.O. Bradfute ,

letter to T.J. Kovach.  !

L 75 (LOO 3) Item 2.2.2 U-1 & 2 E 5/16/85 G. Alexander letter to j '

H.R. Denton.

I Ceco's response to GL 90-03 due

, August 30, will address this issue.

i 75 (B078) Items 3.1.1 U-1 & 2 C 11/5/83 P.L. Barnes letter to J

& 3.1.2 H.R. Denton.

75 (8079) Item 3.1.3 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R. 8 Denton. 8/22/85 H.R. Butler j letter to D L. Farrar. l 1

75 (B087) Items 3.2.1 U-1 & 2 C 11/5/83 P,L. Barnes letter to H.R.

& 3.2.2 Denton. l l 1 L

, 75 (B088) Item 3.2.3 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R.

Denton. 8/22/85 H.R. Butler letter to D.L. Farrar. )

75;(8080) Item 4.1 NA LaSalle does not have reactor trip ')

breakers.

, i l 75 (B081) Items 4.2.1 NA

& 4.2.2 75 (8082) Item 4.3 NA l i 75 (8090) Item 4.3 NA ,

75 (8091) Item 4.4 NA l 75 (B092) Item 4.5.1 U-1 & 2 C 11/5/83 P.L. Barnes letter to H.R.

Denton, 1

l 75 (B093) Items 4.5.2 0-1 & 2 C 5/16/85 G.L. Alexander letter to L & 4.5.3 H.R. Denton, 8/6/85 G.L.

Alexander letter to H.R. Denton.

(4.5.2) 1/31/89 P.C. Shemanskt letter to H.E. Bliss, (4.5.3) 11/6/89 J.0, Bradfute letter to T.J. Kovach.

1 1

l

~.

[

i 1

-86 (B004) U-1 & 2 C 6/4/84 R.Rybak letter to H.R. )

Denton. <

7/19/85 H.L~. Massin letter to .l H.R. Denton. j 11/18/85 H.R. Butler letter to '

D.L. Farrar. i 4/30/86 E.D. Adensam letter to i D.L. Farrar. l 5/30/86 J.R. Hojnarowski letter to l H.R. Denton, i 12/16/86 A. Bournia letter to J F D.L. Farrar. J 1/14/87 C.M. Allen letter to H.R. .

Denton. -

3/5/87 A. Bournia letter to D.L.

Farrar.

6/24/87 C.M. Allen letter to NRC. i 12/15/87 C.M. Allen letter to NRC. i 12/16/87 D. Muller letter to L.D.  ;

Butterfield.

i 93-(B098) NA 99 (L817) NA 124 NA  ;

t A-13 (8017) U-1 C U-1 Tech Spec 3/4.7.9 Amendment U-2 NC 18. U-2 Tech Spec 3/4.7.9.

l A-13 (8022) U-1 C U-1 Tech Spec 3/4.7.9 Amendment l U-2 NC 18. U-2 Toch Spec 3/4.7.9. ,

t t.

i A-16 (D012) 'NA .

A-35 (8023)' U-1 & 2 C .U-1 License Condition 2.C.(20),  !

373/81-00-36 was closed in NRC ,

IR 373/86017. U-2 License '

Condition 2.C.(11), 374/81-00-21 t was closed'in NRC IR 374/87018.

, Amendment #41 to NPF-11 for Unit 1 i l and Amendment #22 to NPF-18 for Unit 2.

B-10 NA LSCS is BWR MARK II i

l U B-36 U-1 & 2 NC Included in U-1 & 2 Tech Spec 3/4.7.2.

B-63 (B045) U-1 & 2 NC Included in U-1 & 2 Tech Spec 3/4.4.3.

(

/ sci:ID46-4 s

.