ML19319C243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:__. .              - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
{{#Wiki_filter:__. .              - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
                                                                                                                                                                                .
          <-
TG? EDo EDISON LOWELL E. ROE v.a. :                                .
TG? EDo EDISON LOWELL E. ROE v.a. :                                .
Fec hose Cowesom ent (4193 259-5242 h hwe Wo. 50-346 w I, 1976 M2== w of Nuclear Regulation at:en:  Mr. George W. Knighton, Chief Environmental Projects Branch No. I hhri States Nuclear Regulatory Commission Eashington, D.C. 20555 3 mar Mr. Knighton:
Fec hose Cowesom ent (4193 259-5242 h hwe Wo. 50-346 w I, 1976 M2== w of Nuclear Regulation at:en:  Mr. George W. Knighton, Chief Environmental Projects Branch No. I hhri States Nuclear Regulatory Commission Eashington, D.C. 20555 3 mar Mr. Knighton:
Th=lar separata cover, we are transmitting twenty-five (25) copies of our k        .fnurth Semi-Annual Report of our Pre-Operational Environmental Monitoring
Th=lar separata cover, we are transmitting twenty-five (25) copies of our k        .fnurth Semi-Annual Report of our Pre-Operational Environmental Monitoring Programs for the Davis-Besse Nuclear Power Station Unit No. 1.                                                                                    This report is for the period July 1, 1975, to December 31,-1975.                                                                                                        ,
  -
Programs for the Davis-Besse Nuclear Power Station Unit No. 1.                                                                                    This report is for the period July 1, 1975, to December 31,-1975.                                                                                                        ,
3uring this period activities continued to be directed towards obtaining aspastic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, volume IV, and previous reports, volumes I through III, provides two full years of preoperational environmental monitoring.
3uring this period activities continued to be directed towards obtaining aspastic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, volume IV, and previous reports, volumes I through III, provides two full years of preoperational environmental monitoring.
    -
The data collected for this period are consistent with previous data collected and do not indicate any unusual conditions for Western Lake Erie.
The data collected for this period are consistent with previous data collected and do not indicate any unusual conditions for Western Lake Erie.
Yours very truly, db b/7
Yours very truly, db b/7 THIS DOCUMENT CONTAINS l                POOR QUAllTY PAGES 8002 IIO i
                                                                                                                                                                                  .
,      ,
        '
THIS DOCUMENT CONTAINS l                POOR QUAllTY PAGES 8002 IIO i
Of THE TOLEDO EDISCN COMPANY  EDISON PLAZA        300 MADISON AVENUE          TOLEDO, OHIO 43652
Of THE TOLEDO EDISCN COMPANY  EDISON PLAZA        300 MADISON AVENUE          TOLEDO, OHIO 43652
                                                                                                                                                                                        ,
                                                         . - _ . , -            .___.1                                          . . - . .                        ._ . _ _ . - . _ . _}}
                                                         . - _ . , -            .___.1                                          . . - . .                        ._ . _ _ . - . _ . _}}

Latest revision as of 06:19, 1 February 2020

Forwards Preoperational Environ Monitoring Programs, Semiannual Rept Jul-Dec 1975
ML19319C243
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/01/1976
From: Roe L
TOLEDO EDISON CO.
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML19319C245 List:
References
NUDOCS 8002110709
Download: ML19319C243 (1)


Text

__. . - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

TG? EDo EDISON LOWELL E. ROE v.a. : .

Fec hose Cowesom ent (4193 259-5242 h hwe Wo. 50-346 w I, 1976 M2== w of Nuclear Regulation at:en: Mr. George W. Knighton, Chief Environmental Projects Branch No. I hhri States Nuclear Regulatory Commission Eashington, D.C. 20555 3 mar Mr. Knighton:

Th=lar separata cover, we are transmitting twenty-five (25) copies of our k .fnurth Semi-Annual Report of our Pre-Operational Environmental Monitoring Programs for the Davis-Besse Nuclear Power Station Unit No. 1. This report is for the period July 1, 1975, to December 31,-1975. ,

3uring this period activities continued to be directed towards obtaining aspastic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, volume IV, and previous reports, volumes I through III, provides two full years of preoperational environmental monitoring.

The data collected for this period are consistent with previous data collected and do not indicate any unusual conditions for Western Lake Erie.

Yours very truly, db b/7 THIS DOCUMENT CONTAINS l POOR QUAllTY PAGES 8002 IIO i

Of THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

. - _ . , - .___.1 . . - . . ._ . _ _ . - . _ . _