ML17208A571: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:0'oosiso ~~~


==SUMMARY==
==SUMMARY==
OF OPERATXNG EXPERIENCE 0'oosiso~~~DOCKET NO.-UNXT 50-250 Turkey Point Unit No.3 DATE Ma 14, 1978 COMPLETED BY V.T.Chilson QEPORT MONTE'pril, 1978 TELEPHONE 305/552-3824 Turkey Point.Unit No.3 operated at approximately 100%R.P.during the month, except for the outage of Apr'il 19-20, 1978 and the load reductions on April 26 and 28, 1978.Refer to the Unit Shutdowns.and Power ReductionsSection of the Operating Status report for details.Major safety-related maintenance performed during the month included inspection of the Rod Control System.  
OF OPERATXNG EXPERIENCE DOCKET NO.-   50-250 Turkey Point UNXT    Unit No. 3 DATE   Ma   14, 1978 COMPLETED BY   V. T. Chilson TELEPHONE    305/552-3824 QEPORT   MONTE'pril,   1978 Turkey Point. Unit No. 3 operated at approximately 100% R.P. during the month, except for the outage of Apr'il 19-20, 1978 and the load reductions on April 26 and 28, 1978. Refer to the Unit Shutdowns .
~
and Power ReductionsSection of the Operating Status report for details.
Major safety-related maintenance performed during the   month included inspection of the Rod Control System.
 
                  ~


==SUMMARY==
==SUMMARY==
OF ORERATXNG EXPERXENCE REPORT MONTH A rxl 1978 DOCKET NO.50-251 Turkey Point Unit Ho.4 DATE May 14, 1978 COMPLETED BX V.T.Chilson TELEPHONE 305/552-3824 Turkey Point Unit No.4 operated at approximately 100%R.P.during the month except for the load reduction'on April 24-25, 1978 to perform the periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.No Major safety-related maintenance was performed during the month.  
OF ORERATXNG EXPERXENCE DOCKET NO. 50-251 Turkey Point Unit Ho. 4 DATE   May 14, 1978 COMPLETED BX   V. T. Chilson TELEPHONE   305/552-3824 REPORT MONTH  A  rxl  1978 Turkey Point Unit No. 4 operated at approximately 100% R.P. during the month except for the load reduction'on April 24-25, 1978 to perform the periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.
$Ui~ia 1ARY OK'PERATING EXPERlENCE DOC YiET NO.UNIT.50-335 St.Lucie Unit No.1 DATE May 14, 1978 COMPLETED BY V.T.Chilson ,QEPORT tlONTH April, 1978 TELEPHONE 305/552-3824 St.Lucie Unit No.1 remained out of service during the month for scheduled refueling, maintenance, and inspection.
No Major safety-related maintenance was performed during the month.
Major safety-related maintenance included: Performance of Steam Generator Tube Inspection Program.Refueling operation continued.
 
during the month.
                    $ Ui~ia 1ARY OK'PERATING EXPERlENCE DOC YiET NO. .50-335 St. Lucie UNIT  Unit No. 1 DATE May 14, 1978 COMPLETED BY   V. T. Chilson TELEPHONE    305/552-3824
0.w}}
,QEPORT tlONTH   April,     1978 St. Lucie Unit No. 1 remained out of service during the month for scheduled refueling, maintenance, and inspection.
Major safety-related maintenance included:
Performance of Steam Generator Tube Inspection Program.
Refueling operation continued. during the month.
 
0 . w}}

Latest revision as of 00:22, 30 October 2019

Monthly Operating Repts for Apr 1978
ML17208A571
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 05/14/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A566 List:
References
NUDOCS 8005120425
Download: ML17208A571 (4)


Text

0'oosiso ~~~

SUMMARY

OF OPERATXNG EXPERIENCE DOCKET NO.- 50-250 Turkey Point UNXT Unit No. 3 DATE Ma 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE 305/552-3824 QEPORT MONTE'pril, 1978 Turkey Point. Unit No. 3 operated at approximately 100% R.P. during the month, except for the outage of Apr'il 19-20, 1978 and the load reductions on April 26 and 28, 1978. Refer to the Unit Shutdowns .

and Power ReductionsSection of the Operating Status report for details.

Major safety-related maintenance performed during the month included inspection of the Rod Control System.

~

SUMMARY

OF ORERATXNG EXPERXENCE DOCKET NO. 50-251 Turkey Point Unit Ho. 4 DATE May 14, 1978 COMPLETED BX V. T. Chilson TELEPHONE 305/552-3824 REPORT MONTH A rxl 1978 Turkey Point Unit No. 4 operated at approximately 100% R.P. during the month except for the load reduction'on April 24-25, 1978 to perform the periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.

No Major safety-related maintenance was performed during the month.

$ Ui~ia 1ARY OK'PERATING EXPERlENCE DOC YiET NO. .50-335 St. Lucie UNIT Unit No. 1 DATE May 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE 305/552-3824

,QEPORT tlONTH April, 1978 St. Lucie Unit No. 1 remained out of service during the month for scheduled refueling, maintenance, and inspection.

Major safety-related maintenance included:

Performance of Steam Generator Tube Inspection Program.

Refueling operation continued. during the month.

0 . w