ML063460506: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/12/2006
| issue date = 12/12/2006
| title = 11/30/2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station
| title = 11/30/2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station
| author name = Louden P L
| author name = Louden P
| author affiliation = NRC/RGN-III/DRP/RPB5
| author affiliation = NRC/RGN-III/DRP/RPB5
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Dominion, Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion, Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305

Revision as of 08:56, 13 July 2019

11/30/2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station
ML063460506
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/12/2006
From: Louden P
NRC/RGN-III/DRP/RPB5
To: Christian D
Dominion, Dominion Energy Kewaunee
References
Download: ML063460506 (5)


Text

December 12, 2006Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

PUBLIC MEETING TO DISCUSS REVISED RISK ASSESSMENTINFORMATION AND FUTURE ACTIONS FOR THE KEWAUNEE POWER STATION

Dear Mr. Christian:

This letter refers to the public meeting conducted on November 30, 2006, at the Region IIIOffice in Lisle, Illinois. The meeting was held at our request to discuss the status of your revised risk assessment program at the Kewaunee power station.Mr. Mark Satorius, Director, Division of Reactor Projects, at the Nuclear RegulatoryCommission (NRC), Regi on III, opened the meeting with introductions of NRC officialsand then turned the meeting over to your staff.Ms. Leslie Hartz, Site Vice President, then lead a presentation provided by several Dominionstaff members that described Dominion's revised risk assessment results for the Kewaunee station and risk reduction activities that had been completed and those that are planned in both the near and long term. The presentation summarized that once the planned modifications are complete that the baseline risk assessments values for Kewaunee would be reduced by about 91 percent from the current values. Mr. James Caldwell, Region III Administrator, concluded the meeting by thanking your staff forcoming to the Regional Office and providing the information. He then acknowledged the efforts taken to date and your planned efforts to continue to reduce baseline risk at the Kewaunee plant.A listing of principal Dominion and NRC meeting attendees and a copy of the handout providedby Dominion at the meeting are enclosed as Enclosures 1 and 2, respectively, to this letter.

D. Christian-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If you have any questions regarding this meeting, please contact me at (630) 829-9627.Sincerely,/RA/Patrick L. Louden, ChiefBranch 5 Division of Reactor ProjectDocket No. 50-305License No. DPR-43

Enclosures:

1. Public Meeting Attendees2. Dominion presentation slidescc w/encls:L. Hartz, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin D. Christian2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If you have any questions regarding this meeting, please contact me at (630) 829-9627.Sincerely,Patrick L. Louden, ChiefBranch 5 Division of Reactor ProjectDocket No. 50-305License No. DPR-43

Enclosures:

1. Public Meeting Attendees2. Dominion presentation slidescc w/encl:L. Hartz, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of WisconsinDOCUMENT NAME:C:\FileNet\ML063460506.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIINAMEPLouden:dtpDATE12/12/2006OFFICIAL RECORD COPY D. Christian-3-DISTRIBUTION
TEB JFS2 RidsNrrDirsIrib GEG KGO GLS SXB3 DRPIII DRSIII PLB1 TXN PUBLIC MEETING PRINCIPAL ATTENDEESNovember 30, 2006DominionLeslie HartzSite Vice President, KewauneeJerry BischofVice President of Engineering Lori ArmstrongDirector of Engineering, Kewaunee Tom WebbDirector of Safety and Licensing, Kewaunee Thomas HookPRA Supervisor Dave BucheitNSE Manager Tom BreeneLicensing ManagerSeveral other Dominion representatives were on the telephone listening to the meeting from theInnsbrook, Virginia, corporate office.Nuclear Regulatory CommissionJames CaldwellRegional Administrator, Region IIIGeoffrey GrantDeputy Regional Administrator, Region III Mark SatoriusDirector, Division of Reactor Projects, Region III Anne BolandDeputy Director, Division of Reactor Safety, Region III Patrick LoudenChief, Branch 5, Division of Reactor Projects Stephen BurtonSenior Resident Inspector, Kewaunee Mike FranovichChief APOB, NRR Jeff CircleAPOB, NRR Sonia BurgessSenior Risk Analyst, Region III Dave PassehlSenior Risk Analyst, Region III Roland LickusState Liaison Officer, Region III Ron LangstaffSenior Reactor Inspector Alan DahburReactor Inspector David JaffeProject Manager, NRR (via telephone)

PublicJeff KitsembelWisconsin Public Service Commission (via telephone)