UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 22, 2011 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE MAY 26, 2011, PUBLIC MEETING TO DISCUSS THE KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT FOR 2010 On May 26, 2011, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Kewaunee Municipal Building in Kewaunee, Wisconsin. The meeting was between NRC representatives and Dominion Energy Kewaunee, Inc., representatives to discuss the NRCs 2010 End-of-Cycle Assessment of the Kewaunee Power Stations safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 4, 2011, (ADAMS ML110620489).

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Kewaunee performance in 2010. The NRCs meeting presentation slides can be found in ADAMS at ML111390409. A list of principal meeting attendees can be found in the attached enclosure.

Mr. Steven Scace, the Kewaunee site vice-president, provided the licensees perspective on the assessment, acknowledging the licensees position in the Licensee Response column of the NRCs Action Matrix. Mr. Scace also discussed the licensee's commitment to stay in the Licensee Response column. Additionally, Mr. Scace mentioned that although Dominion Energy is selling the plant, they have a continued commitment with the plant as long as they hold the license and will continue working to improve the facility.

After the business portion of the meeting, NRC representatives spoke with an individual from local media and a member of the public.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: Distribution via ListServe

PUBLIC MEETING PRINCIPAL ATTENDEES May 26, 2011 Dominion S. Scace, Site Vice-President R. Simmons, Plant Manager S. Yuen, Engineering Director M. Wilson, Licensing and Regulatory Affairs Manager T. Olson, Supply Chain Manager T. Evans, Maintenance Manager Nuclear Regulatory Commission M. Kunowski, Branch Chief, Division of Reactor Projects T. Beltz, Project Manager, Office of Nuclear Reactor Regulation R. Krsek, Senior Resident Inspector, Kewaunee Power Station K. Barclay, Resident Inspector, Kewaunee Power Station S. Burton, Senior Resident Inspector, Point Beach Nuclear Plant M. Thorpe-Kavanaugh, Resident Inspector, Point Beach Nuclear Plant H. Logaras, Regional Government Liaison Specialist P. Chandrathil, Public Affairs Officer P. Cardona-Morales, Reactor Engineer Other Attendees R. Ryman, Reporter, Herald Times Enclosure

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 22, 2011 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE MAY 26, 2011, PUBLIC MEETING TO DISCUSS THE KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT FOR 2010 On May 26, 2011, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Kewaunee Municipal Building in Kewaunee, Wisconsin. The meeting was between NRC representatives and Dominion Energy Kewaunee, Inc., representatives to discuss the NRCs 2010 End-of-Cycle Assessment of the Kewaunee Power Stations safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 4, 2011, (ADAMS ML110620489).

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Kewaunee performance in 2010. The NRCs meeting presentation slides can be found in ADAMS at ML111390409. A list of principal meeting attendees can be found in the attached enclosure.

Mr. Steven Scace, the Kewaunee site vice-president, provided the licensees perspective on the assessment, acknowledging the licensees position in the Licensee Response column of the NRCs Action Matrix. Mr. Scace also discussed the licensee's commitment to stay in the Licensee Response column. Additionally, Mr. Scace mentioned that although Dominion Energy is selling the plant, they have a continued commitment with the plant as long as they hold the license and will continue working to improve the facility.

After the business portion of the meeting, NRC representatives spoke with an individual from local media and a member of the public.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: Distribution via ListServe DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC Mtg Summary\KEW 2010 EOC summary.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski for PCardona- MKunowski Morales:cs DATE 06/22/11 06/22/11 OFFICIAL RECORD COPY

Letter to Dominion Energy Kewaunee from M. Kunowski dated June 22, 2011

SUBJECT:

SUMMARY

OF THE MAY 26, 2011, PUBLIC MEETING TO DISCUSS THE KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT FOR 2010 DISTRIBUTION:

Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource