April 11, 2008 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE APRIL 1, 2008, PUBLIC MEETING TO DISCUSS THE 2007 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT On April 1, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Fox Hills Resort Conference Center in Mishicot, Wisconsin. The meeting was between NRC Region III management and Dominion Energy Kewaunee, Inc., representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Kewaunee Power Stations safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600292). The letter requested that the licensee discuss at the meeting its perspective on the assessment and the progress of its actions to address the repetitive substantive cross-cutting issues in human performance and problem identification and resolution.

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Kewaunee performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080940530. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the assessment and discussed its progress in addressing the repetitive substantive cross-cutting issues. The licensees meeting presentation handout can be found in ADAMS at ML080940554. In summary, the licensee believed that confidence from the NRC was warranted in the licensees ability to address the substantive cross-cutting issues because of various plans, metrics, and procedures in place and because of station and corporate commitment to improve.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated DISTRIBUTION:

See next page

Memo to Dominion Energy Kewaunee, Inc. from M. Kunowski dated April 11, 2008

SUBJECT:

SUMMARY

OF THE APRIL 1, 2008, PUBLIC MEETING TO DISCUSS THE 2007 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT cc: S. Scace, Site Vice President T. Webb, Director Nuclear Safety & Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer, State of Wisconsin Mayor of Kewaunee City Council President Chair, Manitowoc County Board County Executive Chair, Kewaunee County Board Director, Manitowoc County Emergency Management Agency Director, Kewaunee County Emergency Management Agency City Manager of Two Rivers Village President of Mishicot G. Mortensen, INPO

April 11, 2008 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE APRIL 1, 2008, PUBLIC MEETING TO DISCUSS THE 2007 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT On April 1, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Fox Hills Resort Conference Center in Mishicot, Wisconsin. The meeting was between NRC Region III management and Dominion Energy Kewaunee, Inc., representatives to discuss the NRCs 2007 End-of Cycle Assessment of the Kewaunee Power Stations safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600292). The letter requested that the licensee discuss at the meeting its perspective on the assessment and the progress of its actions to address the repetitive substantive cross-cutting issues in human performance and problem identification and resolution.

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Kewaunee performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080940530. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided its perspective on the assessment and discussed its progress in addressing the repetitive substantive cross-cutting issues. The licensees meeting presentation handout can be found in ADAMS at ML080940554. In summary, the licensee believed that confidence from the NRC was warranted in the licensees ability to address the substantive cross-cutting issues because of various plans, metrics, and procedures in place and because of station and corporate commitment to improve.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\KEWA\PUBLIC MEETING NOTICES & LETTERS\KEWA

SUMMARY

LETTER 04-01-08.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:cms DATE 4/11/08 OFFICIAL RECORD COPY

Memo to Dominion Energy Kewaunee, Inc. from M. Kunowski dated April 11, 2008

SUBJECT:

SUMMARY

OF THE APRIL 1, 2008, PUBLIC MEETING TO DISCUSS THE 2007 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

DXC1 TEB PDM RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SRI Kewaunee DRPIII DRSIII PLB1 TXN

PUBLIC MEETING PRINCIPAL ATTENDEES April 1, 2008 Dominion W. Matthews, Senior Vice-President of Nuclear Operations S. Scace, Site Vice-President M. Crist, Plant Manager P. Blasioli, Director, Organizational Effectiveness L. Armstrong, Director of Engineering M. Wilson, Director of Safety and Licensing K. Davison, Recovery Manager Nuclear Regulatory Commission J. Caldwell, Regional Administrator C. Pederson, Director, Division of Reactor Projects M. Kunowski, Branch Chief, Division of Reactor Projects S. Burton, Senior Resident Inspector, Kewaunee P. Higgins, Resident Inspector, Kewaunee R. Krsek, Senior Resident Inspector, Point Beach R. Ruiz, Resident Inspector, Point Beach V. Mitlyng, Public Affairs Officer A. Becker, Resident Office Assistant, Kewaunee and Point Beach D. Betancourt-Roldan, Reactor Engineer Other Attendees R. Langan, Office of U.S. Representative S. Kagen B. Busch, Wisconsin Emergency Management R. Ryman, Green Bay Press Gazette Enclosure