Summary of Meeting with Nuclear Management Company, LLC Regarding the Auxiliary Feedwater Amendment Request Dated May 5, 2005, and the Internal Flooding Design Basis
ML051310057
Person / Time
Site: Kewaunee 
(DPR-043)
Issue date: 05/12/2005
From: Lyon C
NRC/NRR/DLPM/LPD3
To:
Lyon CF, NRR/DLPM, 415-2296
References
TAC MC6916
Download: ML051310057 (5)


Text

May 12, 2005 LICENSEE:

Nuclear Management Company, LLC FACILITY:

Kewaunee Nuclear Power Plant

SUBJECT:

SUMMARY

OF MEETING ON MAY 10, 2005, TO DISCUSS THE AUXILIARY FEEDWATER AMENDMENT REQUEST DATED MAY 5, 2005, AND THE INTERNAL FLOODING DESIGN BASIS (TAC NO. MC6916)

On May 10, 2005, members of the U.S. Nuclear Regulatory Commission (NRC) staff met with Nuclear Management Company, LLC (NMC, the licensee), representatives at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, MD. The meeting was also audio-conferenced with NRC staff at Kewaunee Nuclear Power Plant (KNPP). The meeting was a Category 1 public meeting.

The meeting was requested by the licensee to discuss its license amendment application dated May 5, 2005 (ML051260407 and ML051260401). The proposed amendment would change the Technical Specifications to modify the auxiliary feedwater (AFW) pump suction protection requirements and change the design-basis as described in the Updated Safety Analysis Report (USAR) to revise the functionality of the discharge pressure switches to provide pump runout protection, which requires operator actions to restore the AFW pumps for specific post-accident recovery activities. The licensee requested NRC staff review and approval of the amendment by June 6, 2005, to support restart of KNPP. The NRC staff provided initial comments on the submittal for consideration by the licensee, but noted that it was early in the evaluation process.

Any NRC staff requests for additional information that arise from the NRC staff's review will be provided to the licensee for docketed response in accordance with the NRC staff's normal practice.

Following the discussion of the AFW amendment, the licensee presented its approach to resolving the design-basis issues associated with internal flooding at KNPP. The licensee anticipates submitting an amendment request in the summer 2005 timeframe to clarify the design-basis for internal flooding as described in the USAR. The NRC staff provided comments for consideration by the licensee in the preparation of its future submittal.

No regulatory decisions were made at the meeting. The meeting agenda was provided with the meeting notice (ML051240166). The licensees presentation slides were placed in ADAMS following the meeting (ML051310353). A list of attendees is enclosed.

/RA/

Carl F. Lyon, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

Attendance List cc w/encl: See next page No regulatory decisions were made at the meeting. The meeting agenda was provided with the meeting notice (ML051240166). The licensees presentation slides were placed in ADAMS following the meeting (ML051310353). A list of attendees is enclosed.

/RA/

Carl F. Lyon, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-305

Enclosure:

Attendance List cc w/encl: See next page DISTRIBUTION:

PUBLIC PDIII-1 R/F LMarsh/JLyons TKozak, RIII FLyon THarris DWeaver, EDO CLiang AMohseni LRaghavan TMensah, NRR Comm Analyst OGC ACRS LKozak MChiramal RTelson JTatum RPelton SJones HLi JGuo SWong CBaron ADAMS Accession Number: ML051310057

  • previously concurred OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME FLyon THarris*

LRaghavan DATE 5/12/05 5/11/05 5/12/05 OFFICIAL RECORD COPY

Enclosure ATTENDANCE LIST NRC MEETING WITH NUCLEAR MANAGMENT COMPANY, LLC KEWAUNEE NUCLEAR POWER PLANT AUXILIARY FEEDWATER AMENDMENT REQUEST AND INTERNAL FLOODING DESIGN BASIS MAY 10, 2005 D. Lippard, Dominion Energy L. Hartz, Dominion Energy M. Branch, Dominion Energy (contractor)

D. Sommers, Dominion Energy T. Szymanski, Dominion Energy T. Shaub, Dominion Energy L. Armstrong, NMC J. Stafford, NMC B. Koehler, NMC E. Weinkam, NMC J. Holly, NMC T. Breene, NMC K. Peveler, NMC T. Perez, NMC C. Neuser, NMC D. Horner, McGraw-Hill T. Kozak, NRC L. Kozak, NRC R. Telson, NRC C. Liang, NRC J. Tatum, NRC R. Pelton, NRC S. Jones, NRC M. Chiramal, NRC H. Li, NRC A. Mohseni, NRC L. Raghavan, NRC J. Guo, NRC S. Wong, NRC F. Lyon, NRC C. Baron, NRC (contractor)

Kewaunee Nuclear Power Plant cc:

John Paul Cowan Executive Vice President &

Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Plant Manager Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 Manager, Regulatory Affairs Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 David Molzahn Nuclear Asset Manager Wisconsin Public Service Corporation 600 N. Adams Street Green Bay, WI 54307-9002 Resident Inspectors Office U. S. Nuclear Regulatory Commission N490 Hwy 42 Kewaunee, WI 54216-9511 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Jonathan Rogoff Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Larry L. Weyers Chairman, President and CEO Wisconsin Public Service Corporation 600 North Adams Street Green Bay, WI 54307-9002 David Zellner Chairman - Town of Carlton N2164 County B Kewaunee, WI 54216 Mr. Jeffery Kitsembel Electric Division Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854