Public Meeting Summary with Nuclear Management Company, LLC Re Kewaunee 2003 End-of-Cycle Assessment
ML041820238
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/21/2004
From: Gruss K
NRC/RGN-III/DRP/RPB5
To: Coutu T
Nuclear Management Co
References
Download: ML041820238 (5)


Text

June 21, 2004 Mr. Thomas Coutu Site Vice President Kewaunee Nuclear Power Plant Nuclear Management Company, LLC N490 Hwy 42 Kewaunee, WI 54216-9511

SUBJECT:

SUMMARY

OF THE JUNE 2, 2004 MEETING WITH KEWAUNEE NUCLEAR POWER PLANT TO DISCUSS KEWAUNEE NUCLEAR POWER PLANT PERFORMANCE

Dear Mr. Coutu:

On June 2, 2004, a public meeting was held at the Kewaunee Municipal Building, between the Nuclear Regulatory Commission (NRC) and Kewaunee Nuclear Power Plant staff. The purpose of the meeting was to discuss NRCs assessment of Kewaunee Nuclear Power Plant performance for the period of January 1, 2003, through December 31, 2003.

During the NRC presentation, an overall assessment of Kewaunee Nuclear Power Plants performance was provided. As explained in the Annual Assessment letter from NRC to you dated March 4, 2004, (ADAMS accession number ML040641158), Kewaunee Nuclear Power Plant operated in a manner that preserved public health and safety. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Regulatory Response Column of the NRCs Action Matrix, based on a White inspection finding in the mitigating systems cornerstone which originated in second quarter of 2002 involving a failure to have fixed fire suppression systems installed in certain fire zones within the plant.

A Supplemental Inspection was started in March 200. However, the inspection was suspended because an adequate root cause and extent of condition evaluation of the White finding had not been completed. This led to the White finding being open for greater than four quarter and the site remaining in the Regulatory Response Column of the Action Matrix. We subsequently rescheduled and completed the Supplemental Inspection of the issue in December 2003.

Following our presentation, you stated that Kewaunee Nuclear Power Plant was continuing to improve in a number of areas, including your Engineering Program.

Before adjourning the meeting, the NRC provided the opportunity for members of the public to ask questions. A member of the community requested clarification regarding the facilitys decision to replace the reactor vessel upper head during the 2004 refueling outage.

The meeting attendance list is enclosed. The slides presented by the NRC are available in ADAMS (ML041690156). Please contact me at (630) 829-9605, if there are any questions you have about this meeting.

T. Coutu In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kimberly Gruss, Acting Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43 cc w/encl: J. Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin

T. Coutu In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kimberly Gruss, Acting Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43 cc w/encl: J. Cowan, Executive Vice President, Chief Nuclear Officer Plant Manager Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel & Secretary D. Molzahn, Nuclear Asset Manager, Wisconsin Public Service Corporation L. Weyers, Chairman, President and CEO, Wisconsin Public Service Corporation D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin DOCUMENT NAME: G:\Branch TSS\EOC Ltrs\Mtg Notices 2004\Kew EOC mtg summary.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME JCameron:co KGruss DATE 06/17/04 06/21/04 OFFICIAL RECORD COPY

T. Coutu ADAMS Distribution:

WDR DFT CFL RidsNrrDipmIipb GEG HBC JFL CAA1 C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1

List of Attendees NRC, Region III Patrick Hiland, Acting Deputy Director, Division of Reactor Projects Kimberly Gruss, Acting Chief, Reactor Projects Branch 5, Division of Reactor Projects Jamnes Cameron, Project Engineer, Reactor Projects Branch 5, Division of Reactor Projects Robert Krsek, Senior Resident Inspector, Kewaunee Nuclear Power Plant Patrick Higgins, Resident Inspector, Kewaunee Nuclear Power Plant Nuclear Management Company Thomas Coutu Site Vice President Kevin Davison Plant Manger Sara Cassidy Kewaunee/Point Beach Communications Manager Jerrie Coleman Emergency Planning Manager Larry Gerner Compliance Supervisor Ken Peveler Engineering Programs Manager Jerry Riste Acting Regulatory Affairs Manager Wisconsin Public Service Corporation David J Molzahn Dominion Ed Brennan G. F. Winks III J. E. Wroniewicz State of Wisconsin Dan Stefenel Wisconsin Department of Health and Family Services, Radiation Protection Section Local Officials Darin A. Jeanquart Mayor, City of Kewaunee Public Roger Hirst Joseph Blazei