Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the 2008 Kewaunee End-of-Cycle Performance Assessment
ML091340329
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/14/2009
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To:
References
Download: ML091340329 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 14, 2009 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE APRIL 28, 2009, PUBLIC MEETING TO DISCUSS THE 2008 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT On April 28, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at the Kewaunee Municipal Building in Kewaunee, Wisconsin. The meeting was between NRC Region III management and Dominion Energy Kewaunee, Inc. representatives to discuss the NRCs 2008 End-of Cycle Assessment of the Kewaunee Power Stations safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 4, 2009, (ADAMS ML090640884).

The NRC began the meeting with an overview of the NRC, the NRCs Reactor Oversight Process (ROP), national ROP results, and the Action Matrix. This was followed by a summary of the NRCs assessment of Kewaunee performance in 2008. The NRCs meeting presentation slides can be found in ADAMS at ML091190499. A list of principal meeting attendees can be found in the attached Enclosure.

Mr. Scace, of the licensee, provided the licensees perspective on the assessment, acknowledging the White inspection finding in the emergency preparedness area. Mr. Scace then discussed the sites emphasis on continual improvement, recently developed coaching handbooks for plant supervisors, and a site emphasis on engineering tools. Cindy Pederson, the Region III Director of the Division of Reactor Projects, provided closing remarks, encouraging Kewaunee to maintain the performance focus that allowed the NRC close substantive cross-cutting issues in last years assessment of 2007 Kewaunee performance and acknowledging that the NRC would be conducting an inspection of actions taken by Kewaunee for the White inspection finding.

D. Christian At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: S. Scace, Site Vice President M. Wilson, Director Nuclear Safety & Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer, State of Wisconsin Mayor of Kewaunee City Council President Chair, Manitowoc County Board County Executive Chair, Kewaunee County Board Director, Manitowoc County Emergency Management Agency Director, Kewaunee County Emergency Management Agency City Manager of Two Rivers Village President of Mishicot G. Mortensen, INPO

D. Christian At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: S. Scace, Site Vice President M. Wilson, Director Nuclear Safety & Licensing C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer, State of Wisconsin Mayor of Kewaunee City Council President Chair, Manitowoc County Board County Executive Chair, Kewaunee County Board Director, Manitowoc County Emergency Management Agency Director, Kewaunee County Emergency Management Agency City Manager of Two Rivers Village President of Mishicot G. Mortensen, INPO DOCUMENT NAME: G:\1-Secy\1-Work In Progress\KEWASummary Letter 05-08-09.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:cms DATE 05/14/09 OFFICIAL RECORD COPY

Letter to D. Christian from M. Kunowski dated May 14, 2009

SUBJECT:

SUMMARY

OF THE APRIL 28, 2009, PUBLIC MEETING TO DISCUSS THE 2008 KEWAUNEE END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMKewaunee Resource RidsNrrDirsIpab Resource Patrick Hiland Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

PUBLIC MEETING PRINCIPAL ATTENDEES April 28, 2009 Dominion S. Scace, Site Vice-President M. Crist, Plant Manager M. Wilson, Director of Safety and Licensing Nuclear Regulatory Commission C. Pederson, Director, Division of Reactor Projects M. Kunowski, Branch Chief, Division of Reactor Projects S. Burton, Senior Resident Inspector, Kewaunee K. Barclay, Resident Inspector, Kewaunee J. Jandovitz, Senior Resident Inspector, Point Beach R. Ruiz, Resident Inspector, Point Beach P. Chandrathil, Public Affairs Officer A. Becker, Resident Office Assistant, Kewaunee and Point Beach Other Attendees T. Engelhart, Wisconsin Emergency Management R. Ryman, Green Bay Press Gazette Enclosure