Letter Sequence RAI |
---|
|
|
MONTHYEARML0514701152005-05-27027 May 2005 RAI, Response to Generic Letter 2004-02 Project stage: RAI ML0603704402006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accident at Pressurized-Water Reactors Project stage: RAI ML0729706052007-10-24024 October 2007 Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files Project stage: Other ML0731905532007-11-15015 November 2007 North Anna, Units 1 and 2, and Surry, Units 1& 2, Request for Extension of Completion Dates for Corrective Actions Regarding NRC Generic Letter 2004-02 Project stage: Request ML0734505942007-12-13013 December 2007 Approval of Extension of Completion Dates for Corrective Actions of Generic Letter 2004-02 Project stage: Other ML0806505632008-02-29029 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505622008-02-29029 February 2008 Supplemental Response to NRC GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806503142008-02-29029 February 2008 Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0814306122008-05-22022 May 2008 Units 1 & 2 - NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Request for Interim. Project stage: Request ML0814905722008-05-29029 May 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0818302472008-07-0101 July 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0917406492009-06-22022 June 2009 Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0917406412009-06-22022 June 2009 Transmits Draft RAI on Generic Letter 2004-02 Re. Potential Impact of Debris Blockage of PWR Sumps Project stage: Draft RAI ML0920400062009-08-14014 August 2009 RAI, Regarding Response to Generic Letter 2004-02 (Tac No. MC4691) Project stage: RAI ML0924404262009-08-24024 August 2009 Attachment 1 - Volume 10, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling System (ECCS) Revision 0 Project stage: Request ML0923801712009-08-28028 August 2009 Notice of Telephone Conference Meeting with Dominion Energy Kewaunee, to Discuss Licensee'S Proposed Response to Request Regarding Generic Letter 2004-02 Project stage: Meeting ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 Project stage: Meeting ML0926003762009-09-15015 September 2009 Handout 2 - Drawings, Analyzed RCS - Not Limiting Break Project stage: Other ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station Project stage: Other ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI ML0928702112009-10-14014 October 2009 Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02 Project stage: RAI ML1011707792010-04-30030 April 2010 Notice of Meeting with Kewaunee Personnel to Discuss Kewaunee'S Proposed Response to an RAI Regarding Generic Letter 2004-02 Project stage: RAI ML1014005072010-05-19019 May 2010 E-mail Handouts for the 5/20/2010 Kewaunee Public Meeting Project stage: Meeting ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 Project stage: RAI 2009-10-14
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML19289D4842019-10-24024 October 2019 Summary for NEIMA-Kewaunee Meeting on 9/24/2019 ML16190A3452016-07-13013 July 2016 Inc. Pre-Submittal Meeting Regarding Load Drop Analysis for Spent Fuel Cask Handling Operations at Kewaunee Power Station (L53130) ML15223B2832015-08-11011 August 2015 Summary of Public Meeting to Discuss NRC Activities at the Kewaunee Power Station ML13205A0832013-07-24024 July 2013 Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment ML12352A2822012-12-31031 December 2012 Summary of Meeting with Dominion Energy Kewaunee on Implementation of Orders Japan Lessons Learned Effort ML12292A0942012-10-17017 October 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Unit 2 Steam Generators Replacement Activities ML11173A2772011-06-22022 June 2011 Summary of the Public Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Kewaunee Power Station End-Of-Cycle Performance Assessment for 2010 ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application ML1014106432010-06-0909 June 2010 May 20, 2010 Summary of Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML1012601102010-05-18018 May 2010 Summary of Public Meetings Conducted to Discuss the Draft Supplement Environmental Impact Statement Related to the Review of the Kewaunee Power Station License Renewal Application ML1012600702010-05-0505 May 2010 Summary of Public Meeting to Discuss the 2009 Kewaunee End-Of-Cycle Performance Assessment ML1007107412010-03-31031 March 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the NRC to Discuss Certain RAI Responses on Two Mechanical Systems ML1001104472010-01-13013 January 2010 Summary of Telephone Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Duplicate RAI Number ML0932400382009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Inaccessible Cables Program ML0932302572009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Program for Neutron Absorbing Material ML0926008992009-09-28028 September 2009 (KPS) - Summary of 9/15/09 Meeting Regarding the Licensee'S Proposed Response to the Request for Additional Information on Generic Letter 2004-02 ML0921801372009-08-12012 August 2009 Summary Site Audit Related to the Review of the License Renewal Application for Kewaunee Power Station ML0921006122009-08-10010 August 2009 07/28/2009 Summary of Public Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0918205652009-07-0808 July 2009 Summary of Conference Calls with Dominion Energy Kewaunee, Inc., to Discuss Response to Follow-Up Question Regarding Severe Accident Mitigation Alternatives Request for Additional Information for Kewaunee Power Station ML0916904292009-06-17017 June 2009 Summary of Public Meeting with NRC and Members of the Kewaunee Power Station Emergency Preparedness Staff to Discuss the June 2009 Kewaunee Emergency Preparedness Exercise ML0913300252009-05-21021 May 2009 Summary of Meeting with Kewaunee to Discuss a Future Amendment to Convert the Plant TS from Custom to Improved TS Format ML0913403292009-05-14014 May 2009 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the 2008 Kewaunee End-of-Cycle Performance Assessment ML0900801102009-02-0505 February 2009 Summary of Meeting Between NRC Staff and Kewaunee to Discuss a Future Amendment to Convert Technical Specifications to the Improved Standard TS Format ML0830904522008-11-17017 November 2008 10/22/08 Summary of Public License Renewal Overview and Environmental Scoping Meeting Related to the Review of the Kewaunee Power Station License Renewal Application ML0815607282008-05-29029 May 2008 Ltr. 05/29/08 Kewaunee Re Non-Public Meeting Summary ML0810202352008-04-11011 April 2008 Summary of Meeting Between NRC Region III Management and Dominion Energy Kewaunee, Inc. Representatives to Discuss the Nrc'S Assessment ML0802304472008-01-25025 January 2008 Summary of Meeting with Dominion Energy Kewaunee Inc. Licensee'S Amendment Request on Seismic Methodology for Analysis of Auxiliary Building Crane ML0729601702007-10-31031 October 2007 Public Meeting Summary on the Reactor Oversight Process ML0729005732007-10-17017 October 2007 Summary of Public Meeting with Dominion Energy Kewaunee to Discuss the Ongoing Substantive Cross-Cutting Issues ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721900152007-08-0909 August 2007 8/2/07 Public Meeting Summary on the Kewaunee Appeal of a Frequently Asked Question on the Mitigating Systems Performance Index ML0709504642007-04-0505 April 2007 Summary of Public Meeting with Dominion Energy Kewaunee, Inc. Regarding the Kewaunee End-of-Cycle Plant Performance Assessment ML0703304272007-02-26026 February 2007 Summary of January 25, 2007, Meeting with Dominion Energy Kewaunee Inc., on the Licensee'S Amendment Request Regarding the Use of TORMIS Methodology ML0634605062006-12-12012 December 2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station ML0618405302006-07-0303 July 2006 Public Meeting Summary with Kewaunee to Discuss Improvement Initiatives ML0609005782006-03-30030 March 2006 Public Meeting Summary Kewaunee End-of-Cycle Plant Performance Assessment ML0604000982006-02-24024 February 2006 Summary of Meeting with Dominion Energy Kewaunee, Inc., to Discuss the Applicability of Dominion Safety and Core Design Methods to Kewaunee Power Station ML0532103612005-11-16016 November 2005 Kewaunee Public Meeting Summary, Regulatory Conference for Flooding Issue and Management Meeting ML0527702352005-09-29029 September 2005 Summary of the August 9, 2005, Public Meeting to Discuss the Kewaunee End-of-Cycle Plant Performance Assessment ML0513100572005-05-12012 May 2005 Summary of Meeting with Nuclear Management Company, LLC Regarding the Auxiliary Feedwater Amendment Request Dated May 5, 2005, and the Internal Flooding Design Basis ML0507505452005-03-18018 March 2005 3/18/05, Kewaunee, Summary of Telephone Conference Steam Generator Water Chemistry Excursion (TAC No. M40695) ML0435801802004-12-22022 December 2004 Summary of Public Meeting with Nuclear Management Company, Llc. to Discuss Engineering Initiatives ML0418202382004-05-21021 May 2004 Public Meeting Summary with Nuclear Management Company, LLC Re Kewaunee 2003 End-of-Cycle Assessment ML0333709182003-12-15015 December 2003 Summary of Meeting with Nuclear Management Company, LLC, Regarding Amendment Requests to Use Alternate Source Term Methodology at Prairie Island and Kewaunee ML0323103952003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0323101482003-08-18018 August 2003 Point Beach & Kewaunee Meeting Summary Reactor Vessel Head Replacement Activities ML0312504092003-04-21021 April 2003 Public Meeting Summary with Nuclear Management Co. LLC Kewaunee to Discuss Kewaunee Performance Re EOC ML0222502832002-08-20020 August 2002 Summary of Meeting Between the NRC Staff and Nuclear Management Company, LLC Upcoming Power Uprate and Associated Submittals for Kewaunee ML0214900232002-05-31031 May 2002 Meeting with Nuclear Management Company, LLC, to Discuss Their Response to Interim Compensatory Measure B.2.b of the Security Orders 2019-10-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 28, 2009 LICENSEE: Dominion Energy Kewaunee, Inc.
FACILITY: Kewaunee Power Station (KPS)
SUB..IECT:
SUMMARY
OF SEPTEMBER 15, 2009, MEETING REGARDING THE LICENSEE'S PROPOSED RESPONSE TO THE REQUEST FOR ADDITIONAL INFORMATION ON GENERIC LETTER 2004-02 (TAC NO. MC4691)
On September 15, 2009, the Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting by telephone with Dominion Energy Kewaunee, Inc. (the licensee). The purpose of the meeting was to discuss the licensee's proposed response to a Request for Additional Information (RAI) dated August 14, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092040006) regarding Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design-Basis Accidents at Pressurized-Water Reactors." Attendees of the meeting are listed in Enclosure 1.
As outlined in its handout slides (Enclosure 2, ADAMS Accession No. ML092600018; , ADAMS Accession No. ML092600376; and Enclosure 4, ADAMS Accession No. ML092600643), licensee personnel, supported by the licensee's contractors, presented an overview of the KPS sump design and an outline of the proposed RAI response for each question.
The NRC personnel stated that additional discussion or information would be needed for a few of the RAI questions. The NRC personnel also stated that they would need to further evaluate some of the questions in light of the discussion. The following RAI questions need further discussion as indicated:
RAlltem Discussion 2 Thermobestos Zone of (break) Influence of 5.45D; acceptability of stainless steel banded aluminum jacket vs. stainless steel riveted stainless jacket (used at KPS).
5,6,7, and 12 The NRC staff plans on combining these questions regarding the debris generation, transport, and erosion of TempMat, fiberglass and Thermobestos debris. The NRC staff will reframe these questions based on an improved understanding of the material used at KPS.
8 KPS personnel contend that the KPS containment is very clean, resulting in a much lower latent debris quantity than other pressurized-water reactors. The NRC staff requested that the licensee provide information on sampling and results. The NRC staff also requested that the licensee justify the assumption of 100 pound mass latent debris.
-2 15 The NRC staff requested to review computational fluid dynamics velocity plots prior to submission of the RAI response to verify that the parameters being provided are the specific parameters needed by the reviewers.
16 The NRC staff requested additional information/basis for addition of debris in test flume from a single drop zone vs. containment transport zones.
17 NRC personnel stated that they will review this question and provide feedback to the licensee regarding information to be provided in the response (if any).
19.c.ii The NRC staff requested additional discussion regarding test protocol to introduce 25 percent of latent fiber prior to flume pump start.
40 The NRC staff requested additional discussion of refueling cavity drain blockage potential and impact in consideration of screen on drain standpipe.
A subsequent telephone conference will be scheduled to complete the discussion of the licensee's proposed response.
No comment was received via the Public Meeting Feedback form.
Please direct any inquiries to me at 301-415-1451. ?
<?fl~
Pet~r S. Tam, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305
Enclosures:
- 1. List of Attendees 2-4. Licensee Handout cc w/encl: Distribution via ListServ
NRC and Dominion Energy Kewaunee, Inc. (DEK)
Meeting of September 15, 2009 List of Attendees (in alphabetical order)
Organization S. Bailey NRC/NRRISafety Issue Resolution Branch J. Bleigh Performance Contracting, Inc. (DEK's contractor)
T. Breene DEK S. Cain Alden Research Laboratories, Inc. (DEK's contractor)
L. Christensen DEK J. Dillich DEK J. Gadzala DEK D. Guzonas Atomic Energy of Canada Limited (DEK's contractor)
C.Hott NRC/NRRISafety Issue Resolution Branch J. Kitsembel Wisconsin State Public Service Commission P. Klein NRC/NRRISG Tube Integrity and Chemical Engineering Branch C. Kudla Performance Contracting, Inc. (DEK's contractor)
J. Lehning NRC/NRRISafety Issue Resolution Branch T. Olson DEK S. Putman DEK D. Rhodes Atomic Energy of Canada Limited (DEK's contractor)
C. Sly DEK D. Sommers DEK S. Smith NRC/NRRISafety Issue Resolution Branch P.Tam NRC/NRR/Plant Licensing Branch 111-1 R. Torres NRC/NRRISafety Issue Resolution Branch
Package - ML092600030 Summary - ML092600899 Enclosures 2,3, and 4 - ML092600018, ML092600376, and ML092600643 Mee rmq NorIce- ML092380171 OFFICE NRRlLPL3-1/PM NRRlLPL3-1/LA NRRlDSS/SSIB/BC(A) NRRlLPL3-1/BC(A)
NAME PTam THarris SBailev PTam DATE 9/22/09 9/22/09 9/24/09 9/28/09