Letter Sequence Request |
---|
EPID:L-2021-LLO-0002, Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement
|
MONTHYEARML21084A8002021-03-25025 March 2021 Decommissioning Funding Status Report, Financial, Test and Independent Public Accountants' Letter of Attestation Project stage: Request ML21131A1412021-05-10010 May 2021 Application for Order Approving Transfer of Control of KPS License and Conforming License Amendments Project stage: Request ML21145A0832021-05-13013 May 2021 Notification of Amended Post-Shutdown Decommissioning Activities Report (Revision 2) for Kewaunee Power Station Project stage: Request ML21148A0892021-06-0606 June 2021 Acknowledgement of Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments Project stage: Other ML21148A0742021-06-0606 June 2021 Energy Solutions Proposed Post Shutdown Decommissioning Activities Report with Financial and Planning Information Project stage: Other ML21168A3392021-06-17017 June 2021 Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report Project stage: Request ML21218A1412021-08-10010 August 2021 Acceptance Review of Dominion Energy Kewaunee, Inc. - Kewaunee Ps Approval for Order Approving Transfer of Control of Kewaunee Ps License and Conforming License Amendments Project stage: Acceptance Review ML21277A2462021-09-29029 September 2021 Resubmittal of Solutions Decommissioning Quality Assurance Program (Dqap), Revision 0 Project stage: Request ML21257A0692021-09-30030 September 2021 Enclosure - Request for Additional Information - Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendment Project stage: RAI ML21257A0622021-09-30030 September 2021 Approval for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments Project stage: Request ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments Project stage: RAI ML21257A3492021-10-0505 October 2021 FRN - Kewaunee Power Station Approval for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments Project stage: Other ML21301A1782021-10-28028 October 2021 Response to Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Project stage: Response to RAI ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer Project stage: Other ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) Project stage: Other ML22047A0572022-02-16016 February 2022 Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program Project stage: Supplement ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) Project stage: RAI ML22060A1912022-02-25025 February 2022 Response to Request for Additional Information Related to Submittal for Approval of the Kewaunee Solutions Decommissioning Quality Assurance Program (Dqap), Revision O for Kewaunee Power Station (KPS) Project stage: Response to RAI ML22076A0652022-03-15015 March 2022 Energy Solutions and Dominion Energy Kewaunee - Supplement to License Transfer Application Related to Use of Existing Dominion Energy Quality Assurance Program Project stage: Supplement ML22014A3942022-03-31031 March 2022 Enclosure 3 - Kewaunee Power Station Safety Evaluation Report Project stage: Approval ML22014A3872022-03-31031 March 2022 Order Approving Transfer of the License for the Kewaunee Power Station License and Conforming Future License Amendment Project stage: Request ML22014A3932022-03-31031 March 2022 Enclosure 2 - Draft Confirming Amendment to Kewaunee Power Station Renewed Facility Operating License DPR-43 Project stage: Draft Other ML22014A3922022-03-31031 March 2022 Enclosure 1 - Order Approving Indirect Transfer of the License for the Kewaunee Power Station License and Approving Conforming Amendment Project stage: Other ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance Project stage: Request ML22172A2332022-06-21021 June 2022 Notification of Transaction Closing Date Project stage: Request ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction Project stage: Request ML22175A0972022-06-24024 June 2022 Financial Assurance Information for Kewaunee License Transfer Project stage: Request ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 Project stage: Other ML22160A5162022-06-28028 June 2022 Issuance of Conforming License Amendment Regarding Indirect Transfer of License from Dominion Energy Kewaunee, Inc. to Kewaunee Solutions, Inc. Project stage: Request ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 Project stage: Other ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc Project stage: Approval 2021-09-30
[Table View] |
|
---|
Category:Legal-Insurance/Indemnity Document
MONTHYEARML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML18065A1962018-02-28028 February 2018 Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements ML14182A1632014-06-24024 June 2014 and ISFSI, Millstone Power Station Units 1, 2 & 3 and ISFSI, North Anna Units 1 and 2 and ISFSI and Surry Power Station Units 1 and 2 and ISFSI, Revision to Nuclear Liability Insurance Endorsements ML0811307012008-04-17017 April 2008 Nuclear Liability Insurance Endorsements for Kewaunee, Millstone, North Anna and Surry Power Stations ML0521404312005-08-0101 August 2005 Nuclear Liability Insurance Endorsements ML0220000652002-07-11011 July 2002 Insurance Endorsements 2022-06-13
[Table view] Category:Letter
MONTHYEARML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commissions Analysis of Dominion Energy Kewaunees Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML22076A0652022-03-15015 March 2022 Energy Solutions and Dominion Energy Kewaunee - Supplement to License Transfer Application Related to Use of Existing Dominion Energy Quality Assurance Program ML22060A1912022-02-25025 February 2022 Response to Request for Additional Information Related to Submittal for Approval of the Kewaunee Solutions Decommissioning Quality Assurance Program (Dqap), Revision O for Kewaunee Power Station (KPS) ML22066A4982022-02-24024 February 2022 Nuclear Property Insurance Coverage ML22047A0572022-02-16016 February 2022 Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program ML22032A3242022-02-0202 February 2022 Letter to C. Sly, Dominion, from B. Watson, NRC - Dominion Energy Kewaunee, Inc. - RAI Regarding Energysolutions Submittal for Approving Decommissioning Quality Assurance Program IR 05000305/20210012021-12-27027 December 2021 NRC Inspection Report Nos. 05000305/2021001 (Dnms); 07200064/2021001 (DNMS) ML21351A4352021-12-19019 December 2021 U.S. Nuclear Regulatory Commission'S Analysis of Dominion Energy Kewaunee, Inc.'S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21309A0152021-11-0909 November 2021 Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21301A1782021-10-28028 October 2021 Response to Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License ML21294A3652021-10-21021 October 2021 Changes to Decommissioning Trust Agreement ML21288A5572021-10-18018 October 2021 Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21277A2462021-09-29029 September 2021 Resubmittal of Solutions Decommissioning Quality Assurance Program (Dqap), Revision 0 2024-01-26
[Table view] |
Text
. ~
================ENERGYSOLUTIONs--------
June 13, 2022 ES-2022-012 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Notification ofNuclear Insurance Pursuant to 10 CFR 140.1 l(a)(4) and 10 CFR 50.54(w)
Kewaunee Power Station NRC License No. DPR-43 NRC Docket Nos. 50-305 and 72-64 NRA/CDS: RO The U.S. Nuclear Regulatory Commission (NRC) approved the transfer of License No. DPR-43 for the Kewaunee Power Station (I<.PS) by Order dated March 31, 2022 (the Order). Closing of the transfer is expected to occur on or about June 30, 2022. The Order specified the following condition:
At least two business days before the planned closing date of the purchase transaction, EnergySolutions shall provide the Director ofNMSS satisfactory documentary evidence that the appropriate amount of insurance required of a licensee under 10 CFR 140.1 l(a)(4) and 10 CFR 50.54(w) has been obtained.
Energy Solutions hereby encloses confirmation that American Nuclear Insurers will write nuclear liability insurance for KPS, including amending the facility form policy and master worker certificate for KPS, upon transfer of the KPS license to Kewaunee Solutions, Inc. Additionally, Energy Solutions encloses confirmation that Nuclear Electric Insurance Limited will write a Nuclear Liability and Decontamination Policy for Kewaunee Solutions, Inc. These letters constitute the required evidence of insurance pursuant to the above condition.
Should you have any questions or require additional information, please contact Joseph R. Lynch, Licensing Manager, EnergySolutians/Kewaunee Solutions (KS) at 508-728-1421.
Energy Solutions ES-2022-012 Page 2 of2 Sincerely,
~pigitally signed by Joseph R. Lynch JO Se Ph R* Lyn Ct,/h, .-*Date: 2022.06.13 15:27:48 -04'00' Joseph R. Lynch EnergySolutions, LLC/Kewaunee Solutions (KS)
Licensing Manager
Attachment:
As Stated cc: w/ Attachment Mr. Karl Sturzebecher NRC Project Manager- Kewaunee Power Station U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 NRC Region III Administrator U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Mr. JeffKitsembel Division of Energy Regulation & Analysis Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Robert Busch, Jr.
Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Daniel G. Stoddard President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Energy Solutions ES-2022-012 Attachment Confirmation of Nuclear Insurance Nuclear Electric Insurance Limited (NEIL) - 1 Page American Nuclear Insurers - 2 Pages
Nuclear Electric Insurance Limited 1201 N Market St Suite1200 Wilmington, DE 19801 USA office + 302 888 3000 fax + 302 888 3007 April 1, 2022 ATTN: Document Control Desk Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re.: Dominion Energy Kewaunee, Inc. - License Transfer to Kewaunee Solutions, Inc.
To whom it may concern:
This letter confirms that Nuclear Electric Insurance Limited is willing to write a Nuclear Liability and Decontamination Policy for Kewaunee Solutions, Inc. as the 100% owner of the Kewaunee Nuclear Power Plant, subject to the payment of premium. A Nuclear Liability and Decontamination Policy will be effective upon close of the transfer of the facility license from Dominion Energy Kewaunee, Inc.
The limits on the above referenced policy will satisfy the NRC required minimum insurance limit of $50 million for this site.
This commitment to write a Nuclear Liability and Decontamination Policy for Kewaunee Solutions, Inc. for a twelve-month policy period remains valid through July 1, 2022. If the asset transfer takes place after that date, we will review the circumstances before re-stating our commitment.
Sincerely, Scott Lauchlan Director - Underwriting (Core Business) cc: Kate Fowler (Marsh USA)
Jon Levis (NEIL)
Robert Curtis (NEIL)
Ken Manne (NEIL)
Peter Cavanaugh (NEIL)
Jason Martinez, CPCU, ARM, ARe Director, Underwriting June 1, 2022 Attn: Document Control Desk Director, Office of Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re: Kewaunee Solutions, Inc. - NRC Operating license Transfer for the Kewaunee Nuclear Power Plant Letter of lnsurability To Whom It May Concern, This letter confirms that American Nuclear Insurers will write nuclear liability insurance for the Kewaunee Nuclear Power Plant, located in the town of Carlton, Kewaunee County, WI, upon the transfer of the NRC operating license from Dominion Energy Kewaunee, Inc. to Kewaunee Solutions, Inc.
Effective as of the transaction close date, which is expected to be on or before July 1, 2022, ANI will amend the below policy and certificates for the Kewaunee Nuclear Power Plant as follows:
- a. Facility Form Policy No. NF -0204: ANI will amend the named insured to "Kewaunee Solutions, Inc." in lieu of "Dominion Energy Kewaunee, Inc.". ANI will also amend the operator of the facility to "Kewaunee Solutions, Inc." in lieu of "Dominion Energy Kewaunee, Inc.".
- b. Master Worker Certificate No. NW -0586: ANI will amend the named insureds to "Kewaunee Solutions, Inc." in lieu of "Dominion Energy Kewaunee, Inc.". ANI will also amend the operator of the facility to "Kewaunee Solutions, Inc." in lieu of "Dominion Energy Kewaunee, Inc.".
The commitment to write insurance for Kewaunee Nuclear Power Plant remains valid through July 15, 2022. In the event the license transfer occurs after this date, ANI will review the existing circumstances prior to reinstating our commitment to provide insurance.
Please feel free to contact me with any questions or concerns.
American Nuclear Insurers 85 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 jmartinez@nuclearinsurance.com [l Voice: (860) 682-1341 Fax: (860) 659-0002
Attn: Document Control June 1, 2022 Page 2 Yours sincerely, Jason Martinez, CPCU, ARM, ARe Director, Underwriting C: EnergySolutions - Russ Workman & Greg Wood Marsh - Kate Fowler, Tyler Susa & David Wilkins Dominion - Gregg Crenshaw & Christopher Patterson