Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program
ML22047A057
Person / Time
Site: Kewaunee  
Issue date: 02/16/2022
From: Stoddard D, Workman R
Dominion Energy Kewaunee, EnergySolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
21-171A
Download: ML22047A057 (1)


Text

~

r... D iii + E om1n1on ii it" nergy ENERGYSOLUTIONS U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 February 16, 2022 ENERGYSOLUT/ONS AND DOMINION ENERGY KEWAUNEE SUPPLEMENT TO LICENSE TRANSFER APPLICATION Serial No.:

NRA:

10 CFR 50.80 10 CFR 50.90 10 CFR 72.50 21-171A RO Docket Nos.:

50-305 72-64 License No.:

DPR-43 RELATED TO DECOMMISSIONING QUALITY ASSURANCE PROGRAM On May 10, 2021, EnergySolutions, LLC (ES) and Dominion Energy Kewaunee, Inc. (DEK)

(collectively, the Applicants) submitted a license transfer application for the Kewaunee Power Station (KPS) (the LTA, Accession No. ML21131A141). The LTA stated that Kewaunee Solutions (KS) would develop a quality assurance program that would comply with 10 CFR 50.54(a). On September 29, 2021, ES submitted the KS Decommissioning Quality Assurance Program (DQAP) for NRC approval (Accession No. ML21277A246). On October 18, 2021, the NRG acknowledged receipt of the DQAP submittal (Accession No. ML21288A557).

To facilitate completion of the NRG's review of the L TA while the review of the DQAP is in progress, the Applicants propose the following approach, which also clarifies the September 29, 2021 DQAP submittal. First, KS commits that it will have in place a DQAP approved by NRG Safety Evaluation Report in accordance with the provisions of 10 CFR 50.54(a) prior to closing of the license transfer.

This is a regulatory commitment as noted in the attachment to this letter.

Second, the Applicants propose language for the NRG to use as a condition in its L TA approval Order, requiring KS to have in place an NRG-approved DQAP prior to closing of the transfer. The Applicants' proposed condition would state as follows:

Prior to closing of the license transfer, Kewanee Solutions shall have in place an NRG-approved Decommissioning Quality Assurance Program (DQAP) for Kewaunee Power Station consistent with the Safety Evaluation Report approving the DQAP.

Serial No 21-171A Page 2 of 2 Should you have any questions or require additional information, please contact Craig D. Sly, Manager, Fleet Licensing, at (804) 273-2784.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 16th day of February 2022.

Sincerely, Daniel G. Stoddard President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Attachment:

As stated cc: w/Attachment Mr. Karl Sturzebecher NRC Project Manager-Kewaunee Power Station U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 NRC Region Ill Administrator U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 cc: w/o Attachment Mr. Jeff Kitsembel Division of Energy Regulation & Analysis Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Russell Workman General Counsel EnergySo/utions, LLC Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-265 2

Attachment ONE-TIME REGULA TORY COMMITMENT ACTION Kewaunee Solutions (KS) will have in place an NRG-approved Safety Evaluation Report (SER) for the KS Decommissioning Quality Assurance X

Program (DQAP), submitted in accordance with the provisions of 10 CFR 50.54(a), prior to closing of the License Transfer. TYPE CONTINUTING COMPLIANCE Serial No 21 -171A Page 1 of 1 SCHEDULED COMPLETION DATE Prior to Closing