Mr. Craig D. Sly Manager - Nuclear Fleet Licensing Nuclear Regulatory Affairs Dominion Energy Services, Inc.
5000 Dominion Blvd Glen Allen, VA 23060
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF DOMINION ENERGY KEWAUNEE, INCS DECOMMISSIONING FUNDING STATUS REPORT FOR KEWAUNEE POWER STATION, DOCKET NO (50-305)
Dear Mr. Sly:
By letter dated March 25, 2021, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System [ADAMS] Accession No. ML21084A800) for Kewaunee Power Station (KPS).
The NRC has reviewed and analyzed the site-specific decommissioning cost estimate, as required in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(4)(i), and the amount(s) stated within the licensees decommissioning trust fund, as of December 31, 2020, for the above plant, as well as earnings assumptions. Based on the reported decommissioning trust balance, together with earnings credits specified under NRC regulations, the NRC has determined that as of December 31, 2020, Dominion Energy Kewaunee, Inc. (DEK), is providing a total amount of decommissioning funding assurance in the amount of $780,400,000 for KPS.
This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that DEK has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82, Termination of License, for KPS on December 31, 2021. A summary report completed by NRC staff reflecting decommissioning power reactor DFSs is expected to be completed and made publicly available by the end of calendar year 2021.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.
December 19, 2021
C. Sly If you have any questions regarding this matter, please contact me or Mr. Karl Sturzebecher by telephone at 301-415-8534, or via email to Karl.Sturzebecher@nrc.gov.
Sincerely, Bruce A. Watson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-305, 72-64 License No. DPR-43 cc:
Kewaunee ListServ Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Nuclear Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711 Signed by Watson, Bruce on 12/19/21
Ltr ML21351A435 OFFICE NMSS/DWUP/RDB NMSS/DUWP/RDB NAME KSturzebecher BWatson DATE Dec 17, 2021 Dec 19, 2021