ML17279B026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/06/1988
| issue date = 05/06/1988
| title = Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513
| title = Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:52, 19 June 2019

Informs That Rev to Plant Procedure 1.3.10, Fire Protection Program, Committed to in 870128 Response to Insp Rept 50-397/86-25,currently in Process to Incorporate Listed Addl Changes.Procedure Will Be Revised by 880513
ML17279B026
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/06/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-111, TAC-63528, NUDOCS 8805120229
Download: ML17279B026 (3)


See also: IR 05000397/1986025

Text

ACCELERATED

OSI'IGHUTION

DEMON%RATION

SYSTEM REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)CCESSION NBR:8805120229

DOC.DATE: 88/05/06 NOTARIZED:

NO DOCKET FACIL:50-397

WPPSS Nuclear Project, Unit 2, Washington

Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION'ORENSEN,G.C.

Washington

Public Power Supply System RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 870128 ltr re violations

noted in Insp Rept 50-397/86-25.

DISTRIBUTION

CODE: IEOID COPIES RECEIVED'LTR

I ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation R sponse NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB

ll NRR/DOEA DIR 11 NRR/DREP/RPB

10 NRR/PMAS/ILRB12

OE LIEBERMAN,J

RggEXtH RGN5 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R

AEOD NRR MORISSEAUgD

NRR/DLPQ/QAB

10 NRR/DREP/EPB

10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT

OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1/ATOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

Washington

Public Power Supply System 3000George

Washington

Way P.O.Box968 Richland, Washington99352-0968

(509)372-5000

May 6, 1988 G02-88-111

Docket No.50-397 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.CD 20555 Gentlemen:

Subject: NUCLEAR PLANT NO.2 LICENSE NO.'PF-21 NRC INSPECTION

REPORT 86-25 Reference:

Letter, G.C.Sorensen (SS)to J.B.Martin (NRC-RV), dated 1/28/87 In the referenced

letter, the Supply System committed to revise Plant Procedure (PPM)1.3.10,"Fire Protection

Program," in response to NRC Inspection

Report Notice of Violation 86-25-15.The procedure was revised to strengthen

the pr ocesses and better define the responsibilities

associated

with fire protection

staff reviews of 1)design change packages, 2)welding and cutting activities, and 3)actual fires that occurred.As a result of further review, the procedure is currently in the process of being revised to incorporate

additional

changes made to the Fire Protection

Program since the time the referenced

letter was sent to the NRC.Specific changes made to the original response to the Notice of Violation are as follows: a)Review of Welding and Cutting Activities

~The Industrial

Safety and Fire Protection

Group will be responsible

for auditing Maintenance

Work Requests (MWRs)in the field, on a random basis, to determine if adequate preplanning

for impairments, hazardous work, etc., has been included.~The Plant Fire Marshal will be responsible

for taking followup action to assure closeout of Transient Combustible

Permits and Cutting-Welding-Grinding

Permits which have exceeded the specified time limit.SS05i20229

S80506 PDR ADQCK 05000397 9 DCD

Page Two NUCLEAR PLANT NO.2 LICENSE NO.NPF-21 NRC INSPECTION

REPORT 86-25 b)Investigation

of Actual Fires~The Shift Support Supervisor

will be res ons'he Plant Fire Marshal of fires e plosions or related incidents, unp anne fire protection

impairments.

~The Plant Fire Marshal will be re i e responsible

for informing the explosions

or related incidents.

a e y and Fire Protection

Grou of a p any fires, It is antici ated th p at PPM 1.3.10 will be revised by May 13, 1988.Should you have any questions regardin this M P Po ll M-2 L'ery truly yours, Ac.G.C.Sorensen, Manager Regulatory

Programs lw cc: JB Mar tin, HRC RV NS Reynolds-BCP8R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A