ML17285A318: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/06/1989
| issue date = 03/06/1989
| title = Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
| title = Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
| author name = SORENSEN G C
| author name = Sorensen G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000397/1987019]]
See also: [[see also::IR 05000397/1987019]]


=Text=
=Text=

Revision as of 00:34, 19 June 2019

Provides Revised Schedule Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/87-19 & 50-397/88-41.Plant Procedures 10.25.19 & 11.2.1.2 Will Be Issued by 890417
ML17285A318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/06/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-035, GO2-89-35, TAC-63528, NUDOCS 8903140431
Download: ML17285A318 (4)


See also: IR 05000397/1987019

Text

A.CCELEPXrED

Dl<HKBt-'z

os DE)do>STR~Tlos

SY~Hzx REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)CCESSION NBR:8903140431

DOC.DATE: 89/03/06 NOTARIZED:

NO DOCKET g FACIL:50-397

WPPSS Nuclear Project, Unit 2, Washington.Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION

SORENSEN,G.C.

Washington

Public Power Supply System RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 880727&890203 ltrs re violations

noted in Insp Repts 50-397/87-19

S 50-397/88-41.

DISTRIBUTION

CODE: IEOID COPIES RECEIVED:LTR

1 ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DEIIB

NRR SHANKMAN,S

NRR/DLPQ/PEB

11 NRR/DOEA DIR 11 NRR/DREP/RPB

10 NRR/PMAS/ILRB12

EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R

AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB

10 NRR/DREP/EPB

10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT

OGC/HDS2 RGN5 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R I D S NOrE'IO ALL"RIDS RZCIPIENIS

~PLEASE HELP US TO REDUCE WASTE CONIACI%HE DOCUMENT CONGEAL DESK~ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR KkK FBQM DZPHKBVTIGN

LISTS FOR DOCUMENIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

WASHINGTON

PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George 11'ashington

1Vay~Richland, 11'ashington

99352 March 6, 1989 G02-89-035

Docket No.50-397 U.S.Nuclear Regulatory

Commission

Attn;Document Control Desk Mail Station Pl-137 Washington, D.C.20555 Gentlemen:

Subject: NUCLEAR PLANT NO.2 ADDITIONAL

RESPONSE TO NOTICE OF VIOLATIONS

87-19-29 AND 88-41-03 i Reference:

1)Letter, G02-88-168, GC Sorensen (SS)to NRC,"NRC Inspection

Report 87-19 Item 29 Instrument

Rack Terminations", dated July 29, 1988 2)Letter, G02-89-014, GC Sorensen (SS)to NRC,"NRC Inspection

Report 88-41 Response to Notice of Violation", dated February 3, 1989 The purpose of this letter is to provide revised scheduled completion

dates associated

with commitments

made in response to Notice of Violations (NOVs)87-19-29 and 88-41-03.The reason for the following revised schedule is that completing

the commitments

has taken longer than anticipated

when the original responses were submitted.

1)NOV 87-19-29 (Violation

C.3)it In the referenced

letter (1), the Supply System committed to revise Plant Procedure (PPM)10.25.19,"Termination

and Splicing Instruction", to include examples of acceptable

crimp configurations.

This action was to be completed by March 15, 1989.The revised procedure is currently in the procedure review process and will now be issued by April 17, 1989.

Page Two ADDITIONAL

RESPONSE TO NOTICE OF VIOLATIONS

87-19-29 AND 88-41-03 i 2)NOV 88-41-03 (Violation

B)In the referenced

letter (2), the Supply System committed to make a pro-grammatic change to the ALARA process to reduce the threshold of those Radiation Work Permits (RWPs)which require a pre-job briefing.This action was also to be completed by March 15, 1989.Plant Procedure 11.2.1.2,"Al ARA Program Implementation", is currently in the process of being revised and now will be issued by April 17, 1989.Very truly yours,~(G.C.Sorensen, Manager Regulatory

Programs JDA/bk cc: JB Martin-NRC RY NS Reynolds-BCP8R RB Samwor.h-NRC=DL Williams-BPA/399 HRC Site Inspector-901A