Informs That Detailed Discussion of Corrective Actions Re Violations Noted in Insp Rept 50-397/87-19 Will Be Submitted by 880205
ML17279A767
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/22/1987
From: SORENSEN G C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: MARTIN J B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8801130093
Download: ML17279A767 (3)


Text

AC CELERATZD DISHUBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).CCESSION NBR:8801130093 DOC.DATE: 87/12/22 NOTARIZED:

NO DOCKET 1T FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System.RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B..

Region 5, Ofc of the Director SUBJECT: Informs that detailed discussion of corrective actions will be included in response to Insp Rept 87-19 by 880205.DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR I'NCL Z SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB NRR/DREP/EPB NRR/DRIS DIR OE LIEBERMAN,J REG F E 01 ERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME SAMWORTH,R AEOD NRR MORISSEAU,D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/I LRB OGC/HDS2 RES DEPY GI NRC PDR COPIES LTTR ENCL 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 A 8 A TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23 ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM~~')RO.))]P.Q.Box 968~3000 George Washington Way~Richland, Wushinufon 8¹+n, r 2 Docket No.50-397 December 22, 1987 Nr.J.B.Martin, Regional Administrator Region V, U.S.Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 walnut Creek, CA 94596-5368

Dear Nr.Martin:

Subject: NRC INSPECTION AT HNP-2 INSPECTION REPORT 87-19Reference:

Letter, JB Martin to GC Sorensen, same subject, dated December 18, 1987 The referenced letter transmitted to the Supply System the results of the Safety System Functional Inspection (SSFI)conducted by members of your staff and others on August 3 through 28, 1987.The inspection report identified the objective of the SSFI as being"to assess the operational readiness of selected safety systems to function under all operational and analyzed accident conditions." l<e note that the inspecti on di d not i denti fy any def i ci enci es whi ch woul d prevent the reviewed systems from performing their intended function.However, the inspection did identify several defi ciencies of lesser significance which we are taking steps to correct.The Supply System takes seriously its commitment to operational excellence and is in the process of establishing programs to correct the deficiencies identified in the SSFI.A detailed discussion of the corrective actions to be taken will be included in our response to the inspection report.As agreed with members of your staff, we will respond to the inspection report by February 5, 1988.Very truly your s, G.C.Sorensen, Manager Regulatory Programs 87l22 88PllSPP9<