ML18087A738: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 24: Line 24:
DSJ UNIT 2 PROCEDURE NO. ?.._ (->Q -\ 'C,
DSJ UNIT 2 PROCEDURE NO. ?.._ (->Q -\ 'C,
* i.\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._
* i.\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._
__ PROPOSED CHANGE:  
__ PROPOSED CHANGE:
: 7.
: 7.
S.\ (s.R. '4. '\}.  
S.\ (s.R. '4. '\}.  
.. c. \,l \  
.. c. \,l \  
\ s. a.,..\ c.. ' ..., c:i _.., , , --, "-' \.::> "' ' \ e. i' Ml Q.  
\ s. a.,..\ c.. ' ..., c:i _.., , , --, "-' \.::> "' ' \ e. i' Ml Q.
:  
:  
....,\<; ( &deg;SC'Vv&"-
....,\<; ( &deg;SC'Vv&"-
Line 47: Line 47:
__
__
REV. NO. Q PROPOSED CHANGE:  
REV. NO. Q PROPOSED CHANGE:  
;J..5 s*-\-"'i'  
;J..5 s*-\-"'i'
:5.:i... SS S'-\lo 6 d..\a -aC\ C.Y-.."""'.....,C\  
:5.:i... SS S'-\lo 6 d..\a -aC\ C.Y-.."""'.....,C\  
"2...  
"2...  
Line 59: Line 59:
/ TE CATE FORM AP*J-t REV, 9   
/ TE CATE FORM AP*J-t REV, 9   
* ** -** \..: .. .* PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE: m PERMANENT D l3J (GREEN) *EXPIRES:
* ** -** \..: .. .* PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE: m PERMANENT D l3J (GREEN) *EXPIRES:
TY TO BOTH UNITS. *TEMPORARY (ORANGE)  
TY TO BOTH UNITS. *TEMPORARY (ORANGE)
[31UNIT2 PROCEDURE NO. _\ ........ \?_D ___  
[31UNIT2 PROCEDURE NO. _\ ........ \?_D ___  
....... *-0_0__..s:;;...._*
....... *-0_0__..s:;;...._*
Line 191: Line 191:
* I & C -001 NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the trip light energizes on the drawer. 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55. 8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
* I & C -001 NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the trip light energizes on the drawer. 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55. 8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
* x * *
* x * *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued)  
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued)
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power* Supply M-G Breaker on No. lG 460 VAC bus
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power* Supply M-G Breaker on No. lG 460 VAC bus
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
Line 278: Line 278:
...* *. '**-"'"'*. ** .: . __ .,_ ..... _ ....... -.  
...* *. '**-"'"'*. ** .: . __ .,_ ..... _ ....... -.  
.:.-.... ..:. .......  
.:.-.... ..:. .......  
._::_;._, ** _.,, *.  
._::_;._, ** _.,, *.
:...., .*.  
:...., .*.  
.***. .... ._ .... -.*** :.* ..
.***. .... ._ .... -.*** :.* ..

Revision as of 18:09, 25 April 2019

Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B.
ML18087A738
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/24/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.4.005, NUDOCS 8303160585
Download: ML18087A738 (32)


Text

" . .........

  • ' . ..,,,.. NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE: ON-THE-SPOT CHANGE ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS. *TEMPORARY (ORANGE) [XJ UNIT 1 PROCEDURENO.

__

__

REV. No. ____ o ____ CHANGE No._--'---

DSJ UNIT 2 PROCEDURE NO. ?.._ (->Q -\ 'C,

  • i.\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._

__ PROPOSED CHANGE:

7.

S.\ (s.R. '4. '\}.

.. c. \,l \

\ s. a.,..\ c.. ' ..., c:i _.., , , --, "-' \.::> "' ' \ e. i' Ml Q.

....,\<; ( °SC'Vv&"-

\f.I. I) *.... \ 1

<.'..\. S.l REASON FOR CHANGE: Sc c:;;;;:c \\,'c, h

£\...v...\-

\)ou;:.t-.l

\ ACTION TAKEN FOR OTHER UNIT: cs AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO MEETING NO.

I 7 f I I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN: B3031605SS--830314 PDR ADOCK 05000272 S PDR PERFORMED BY: \ SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. W\ \\ l'.'.:*C \-.

r DdTE fht6fz_

ATE DATE FORM AP*l*t REV. 9 .

  • * @; ' -* \..... NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE PROCEDURE TITLE \<_e.s; CHANGE TYPE: rY1 PERMANENT D (GREENJ *EXPIRES:

BILITY TO BOTH UNITS. *TEMPORARY (ORANGEJ UNITt 1x1 UNITZ PROCEDURE NO. __

____ . REV. NO. Q CHANGE NO. _ _._ __ PROCEDURENo.

__

REV. NO. Q PROPOSED CHANGE:

J..5 s*-\-"'i'
5.:i... SS S'-\lo 6 d..\a -aC\ C.Y-.."""'.....,C\

"2...

-\.\ "\ \B-=l..\-8 e, s -1.\ d-lc

'2.\o S\."-f "\ '(,

\"'\:) -8 REASON FOR CHANGE: ACTION TAKEN FOR OTHER UNIT: AUTHO"R IZATION:

    • SUPERVISOR IN CHARGE L\ \le

\o -**SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

POST CHANGE-REVIEW/APPROVAL YES NO D D MEETING NO. ls2_ 01 I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN: PERFORMED BY: SIGNATURE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. CHANGE NO. _ _._ __

/ TE CATE FORM AP*J-t REV, 9

  • ** -** \..: .. .* PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE: m PERMANENT D l3J (GREEN) *EXPIRES:

TY TO BOTH UNITS. *TEMPORARY (ORANGE)

[31UNIT2 PROCEDURE NO. _\ ........ \?_D ___

....... *-0_0__..s:;;...._*

_____ REV. NO. __ o __ CHANGE No._.....__

___ _ REV. No: __ o _____ CHANGE No. _ __.\ __ PROPOSED CHANGE:

s

<\. \ J,_

C.-c.-...;

.\-'f'c \.-REASON FOR CHANGE: *----'5

<" $\...\ '°"

s'-'*, \->r-c::; ......... ..... *C\J\

ACTION TAKEN FOR OTHER UNIT: AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO D D MEETING NO. POST CHANGE-REVIEW/APPROVAL a

/I I I MANAGER* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN: PERFORMED BY: SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. . ;""*-**,* DATE FORM AP-3*1 REV. 9

  • SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE:

lPD-18.4.005

-RESPONSE TIME TEST OF SSPS LOGIC -R'EMARKS:

Rx 'l'RIP ; TRAIN II B II

  • EEO QA PERF. ENGR. SORC STA. SUPT. REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _

'7/'2.1/8'2.

-:!_ .A L..I.

¥$ffl,-*-WA ... 0 i'i..

"";v\. c .. n. " ' . * --*-**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,..

... ...-..-..

...............

_... ... -......... ......

..... *-*"--** --* **-----*---


*.. ....__ ,-... J x * **

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE . NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE --=l __ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -* Rx Trip, Train B 1.0 Purpose: 1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil. 1. 2 1. 3 To obtain the response from the UV coil to the opening of the reactor trip breakers
  • To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.

2.0

References:

2.1 2.2

... Performance Department Manual. Reactor Protectio'n System Logic Diagrams -221050 thru 221065. 2.3 Westinghouse Instruction Manual -Solid State Protection.

2.4 Hagan

Interconnection Diagrams -220000 thru 220092 . 1111 c -001 x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TESTPROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE _2 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 3.0 Precautions:

3.1 Special

care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.

3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive

  • paper is wasted. 4.0 Limitations and Actions: 4.1 None stated *
  • I & C
  • 001 . . **.:*o..J--::**.-*r*_.**<."'!*;:**'""" ....

.. -... . .; .. , , ..

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.

DATE 5/3/82 PAGE 3 OF 28 ---TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B *

  • I & C -001 5.0 Test Equipment:

Device Visicorder Model 1912 Test Leads & Jumpers Test Resistor for Hagan Input Signals . Toggle Switches (4) Latern Type 6VDC Battery (2) or Equiv. *** -* ., ..,.-* ** * "<'".; '*' '-.r,*.,-***,-*

\ ...

__ .,,.-.,._,, ,. ,**r-* *",-* ** "'"* *** *

  • PD No. Recal. D*ate N/A N/A N/A N/A N/A N/A N/A N/A x * *
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMSER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx. Trip, Train B 6.0 Prerequisites:

6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6). Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified-to do so in accordance with the Solid State Protection System Qualification Card

  • Job Supervisor I & C -001 ** * ** -... *,** .... -. * * ,,_ .. !""_,,..
    • r-.... ,.----.. ---*--. . . . *' ...... .. -._,. .. * .. **-** . ....... . . -..

X' * *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE

.. NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE -"'5 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx.Trip, Train B 6.0 Prerequisites: (Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and cations which will be affected by the i?erformance of this procedure.

Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel . Indication, and Steam Generator Level from the Wide Range Indication.

Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual. Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions

  • Job Supervisor I & C
  • 001 x .. * *
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER-REV. NO. 0 DATE 5/3/82 PAGE OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 7.0 System Line-up: 7.1 None stated
  • I & C -001 *r ' . * .* ., ,* ** . ' * . * * ** ---

x *

  • c. ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE*

OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions:

8.1 Lift the following leads at the NIS cabinet: 8.1.1 Rack 78 -TB123-l 8.1.2 Rack 79 TB223-l (.s.R, \.\, '-'. \oc. 't:... T) 8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B. C \.. . -.-, .

  • c*1-, ,

Y1\I\.'\

.._1:.."'j \..:, C\-

oQ r .,a..__, *

-*TY't"\\1\i

.:::;; G

-\<.. 1c:,...c\

°T"-T-m:'N'A.\....

'll;li;;..

C\ 0Q\.'-.'("C..,._

\:>-,.\-'$\.,....,,,,' ?-.\,.:1,_.l'M)

8.3 Place

the Input Error Inhibit switch for Train A in the "Inhibit" position.

8.4 Place

the Train B Mode Selector switch in the position.

8.5

  • Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I. *8.6 Connect Visicorder Channel 1 to the output terminals.

of the Bistable Switch under test as shown in Table 2 (115 VAC)

  • I & C
  • 001 ., .*. *-*. .. * ........ -...

'-"""'.-

...

  • ?.

.... -.-.... : ... ---... *----.:--*-** -*** -*. --.. -Initial A B x ** *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip,* Train B 8.0 Instructions: (Continued)

8.7 Connect

Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.

8.8 8.9 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position

  • Adjust the visicorder to obtain a good quality step function trace. 8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY. 8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.

Initial 8.12 Stop the visicorder after the UV coils are de-energized.

Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference

  • 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4. I & C -001 . *,

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE __;;_9 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.14 For 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes
  • (Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)

8.14.1 . 8.14.2 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633. For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634. NOTE: The UV Coil will remain de-energized for this step. 8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36. I & C

  • 001 Initial x .. * * ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. lPD-18.4.005 0 DATE PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip,* Train B B.0 Instructions: (Continued)

B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes. (Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48. B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase . .

  • the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes. (Note: Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

I & C

  • 001 Initial x * *
  • NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE PAGE-11 OF 28 TITLE RESPONSE TIME-TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 (Continued) 8.19 CAUTION: Terminals may be energized (115VAC).

Connect channel 3 of visicorder to coil contacts 5 and 6 on Short terminal 1 to 5 on A.R. timer. 1 8.20 Disconnect the field wires connected to the terminals in Table 3, Steps 37 through 40

  • 8.21 Connect a toggle 'switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.22 Connect visicorder channel 1 across the terminals.

8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40. (For a coincident channel trip, place the toggle switch to OFF.) 8.24 Remove the" toggle switches from of Table 3, Steps 37 through 40 and reconnect the field wires. 8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44. 8.26 Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) '8.27 Connect visicorder Channel 1 across the terminals.

I & C

  • 001 Initial I*--x ..
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -* lPD-18. 4. 005 REV.NO.

DATE PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44. (For a coincident channel trip, place the toggle switch to OFF.)* 8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the Initial

  • field wires.
  • I & C -001 NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the trip light energizes on the drawer. 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55. 8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
  • x * *
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued)
8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power* Supply M-G Breaker on No. lG 460 VAC bus
  • Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.

Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet. 8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the visicorder. (Note: In series with one conductor, connect a 6VDC latern-type battery.)

Initial I & C -001 -.

.. .. .... -.... ,,, ... _.,,_ .. -.********-***"*

            • .... _______ *::.....*

x (_ * *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE

-. NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE. 14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM Rx Trip, Train B 8.0 Instructions: (Continued)

Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56. To close the trip breaker, place *the Mode Selctor Switch in Operate. Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33. Place the Mode Selector Switch in Test. 8. 38 CAUTION: Terminals may be energized

_( llSVAC) Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.

8.39 Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.40 Connect visicorder Channel 1 across the terminals.

8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59. (For a coincident channel trip, place the toggle switch to OFF.) 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires. I & C -001 x .. * *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.

DATE 5/3/82 PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63. 8.44.Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.4.5 Connect visicorder Channel 1 across the terminals.

8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63. (For a coincident channel trip, place the toggle switches to OFF.) 8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires

  • I & C
  • 001 Initial x * *
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: 9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.

9.2 Remove

test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I

  • 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet. 9.4 Return NIS power range drawers to normal and clear any associated alarms. 9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".

9.6 Place

the Mode Selector switch for Train B in the "Operate" position

  • I & c* -001 Initial

.x * *

  • I Iii C
  • 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.

DATE PAGE 17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: (Continued)

9.7 Initiate

the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel. Stearn Line S.I. Block Pressurizer S.I. Block 9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.

  • * ' /.J..j1:z.S".;.., n \"""-:\1,""°N*\.\::.

"'f\T-'\ *; c ;"'-C\.£.\

  • Re.c.cv...>n.:i I!.'--'\-

..... <_; : \'.:\

--. ..u, e El

-\<._ li"J....C\

9.9 Remove

the jumper from TB507-4 and TB507-5 in both A and TRAIN B. 9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT . Initial A B A B A B / **-* . . . ..... ** .. -* .. *;*** *.; .. -. __ *_* '_:._** ... _ ...

,, ... ,,.,.: .. --.,--.... -. ,. ... ' ..... *--.... --.......

..... _ .. _ ... .:__ .. ___ ::_____...:.:......:.._--'--------------

x * * * : '* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: (Continued) 9.11 Reconnect the Leads lifted at the following locations:

9.11.1 NIS Rack 78, TB 123-1 . 9.11.2 NIS Rack 79, TB 223-1 i+ Iv-.;

t <;. '--'-f .... _, \i \ s 1:' l-\..>-J -M.

\.. -\-"' '<!_. \e_ \0 N-:O .-C.-L ' i ' \.\cc_\l--..

'Ce'

-C:\'..\ \ P-.-;-..;,i v,.\l.*<i<::...

\-. 0 \H, .. r-.f**

d:<

\,\""o.J.L


I & C -001 -***.****-*,.* . .o:*.****":"-,-.-

  • .

.. -....

...........

-' ___ ,, --.*

...............

., .... ... Initial x * *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Train B 10.0 Remarks: I.O
  • 11.0 Completion:

11.1 Completed Technician

  • Date Time 11.2 Approved By:

Date Time I & C -001 I x * *

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 PAGE 20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B. TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST: I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-412-1 Rack 2 TJ-421-1 Rack 6 TJ-422-1 Rack 6 TJ-431-1 Rack 13 TJ-432-1 Rack 13 TJ-441-1 Rack 15 TJ-442-1 Rack 15 NOTE: To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks. II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 IV. STEAM GENERATOR LEVEL TJ-517 Rack 31 TJ-527 Rack 31 TJ-518 Rack 11 TJ-528 Rack 11. TJ-519 Rack 8 TJ-529 Rack 4 TJ-434 *Rack 3 TJ-435 Rack 7 TJ-436 Rack 12 TJ-457 Rack 12 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-444 Rack 3 TJ-445 Rack 7 TJ-446 Rack 12 TJ-474 Rack 14 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C
  • 001 x * *
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE I (Continued)

B. Install the following Jumpers in SSPS INPUT RELAY BAY: I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2 TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C

  • 001

.X

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV. NO. 0 --------DATE 5/3/82 _ _,___ _________

_ PAGE 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1 BS-411C 2 TB 1-11&12 BS-441C 15 2 BS-421C 6 TB 2-5&6 BS-441C 15 3 BS-431C 13 TB 3-3&4 BS-441C 15 .4 BS-441C* 15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1 TB 1-7&8 BS-474A 14 6 BS-456C 10 TB 2-9&10 BS-474A 14 7 BS-*457C 12 TB 4-1&2 BS-474A 14 8 BS-474A 14 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9 BS-455A

  • 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3 TB 2-7&8 BS-416 12 *BS-424 3 BS-425 7 -14 BS-415 7 TB 2"".'7&8 BS-416 12 BS-424 3 BS-425 7 .5 BS-416 12 TB 2-3&4 BS-414 3 BS-424 3 BS-425 7 I & C -001 -

.x

  • STEP 16 17
  • 18 19 20 21 22 24 .. *-.... *--* -. -*-*-.... --*---**--* -*******-.

-... _ -*-* *'-'**-, ...... --... *, -,_ --.. -.............. * ..... -*._ ... *----_ ...... ***-**** .. -_.,_ --**-* ---* .. ** *-*--* ... * . . -SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL BS-424 3 TB 2-11&12 BS-426 12 BS-414 3 . BS-415 7 BS-425 7 TB 2-11&12 BS-426 12 BS-414 3 BS-415 7 BS-426 12. TB 2-7&8 BS-424 3 BS-414 3 BS-415 7 BS-434 3 TB 3-3&4 BS-436 12 BS-414 3 -BS-415 7 BS-435 7 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 BS-436 12 TB 2-11&12 BS-434 3 BS-414 3 BS-415 7 BS-445 7 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 BS-444 3 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 BS-446 12 TB 3-3&4 BS-444 3 BS-414 3 I & C -001 -

x !

  • STEP STEAM 25 26 27 8 29 30 31 32 33 34 35 36
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE. 24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B .rr'ABLE II BISTABLE RACK TERMINALS RACK TIME RESPONSE , UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7 GENERATOR WATER LEVEL LOW-LOW BS-517B 31 TB 1-9&10 BS-519B 8 BS-518B 11 TB 1-3&4 BS-519B 8 BS-519B 8 TB Bs...:.511B 31 BS-527B 31 TB 2-3&4 BS-529B 4 BS-528B 11 TB 1-11&12 BS-529B 4 BS-529B 4 TB 1-3&4 BS-527B 31 BS-537B 31 TB 2-9&10 BS-539B 4 BS-538B 11 TB 2-7&8 BS-539B 4 BS-539B 4 TB 1-7&8 BS-537B 31 BS-547B 31 TB 3-3&4 BS-549B 8 BS-548B 11 TB 3-3&4 BS-549B 8 BS-549B 8 TB 2-9&10 BS-547B 31 I & C
  • 001 { I

.* "-*-..* -...*.. *--****** *******-.:."-

...* *. '**-"'"'*. ** .: . __ .,_ ..... _ ....... -.

.:.-.... ..:. .......

._::_;._, ** _.,, *.

...., .*.

.***. .... ._ .... -.*** :.* ..

  • x
  • STEP -. STEAM 25A
  • 6A 27A 28A 29A 3*0A 31A ., SALEM GENERATING STATION -PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-1 S. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 --------PAGE 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP BS-517B *31 TB 1-9&10 BS-519B 8* BS-549B* 8 BS-548B 11 BS-518B 11 TB 1-3&4 BS-519B 8 BS-549B 8 BS-548B 11 BS-519B 8 TB 2-5&6 BS-Sl 7B 31 BS-549B 8 BS-548B 11 BS-527B 31 TB 2-3&4 BS-529B 4 BS-549B* 8 BS-548B 11 BS-528B 11 TB 1-11&12 BS-529B 4 BS-549B 8 BS-548B 11 BS-5.29B 4 TB 1-3&4 BS-527B 31 BS-549B 8 BS-548B 11 BS-537B 31 TB 2-9&10 BS-539B 4 BS-549B 8 BS-548B 11 BS-538B 11 TB 2-7&8 BS-539B 4 BS-549B 8 BS 546B 11 I & C -001
  • 'x
  • STEP STEAM 33A 34A 35A 36A SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER-lPD-18.4.005 REV.NO. _O ______ _ DATE __

______ __ PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -* Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK .CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP BS-539B 4 TB 1-7&8 BS-537B 31 BS-549B 8 BS-548B 11 BS-54 7B 31 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 BS-548B 11 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 BS-549B 8 TB 2-9&10 BS-547B 31 BS-529B 4 BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3 TB 2-7&8 BS-416 12 38 BS-415 7 TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'.

L\ I le 12 TB 2-7-&'S' 3-t L.

3 40 BS-424 3 TB 2-11&12 BS-426 12 41 BS-425 7 TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3 43 Bp-434 3 TB 3-3&4 BS-436 12 44 BS-435 7 TB 3-3&4 BS-436 12 5 BS-436 12 TB 2-11&12 BS-434 3 BS-444 3 TB 3-7&8 BS-446 12 47* BS-445 7 TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\.\

BS-444 3* \?-..J c I & C *001 <!.

  • c\-\ \ .. , ..... _ ....... -**-**:****-*--*-----

** ____ ... .:_ .. *------... --* ---._.

.. :x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE

______ _ PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE III ---* STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H) UNDER FREQUENCY (ABOVE P7) Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H) POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8 N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41

  • I & C--001
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 --------PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1
  • TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1 TB 109-1 TB 109-2 2 58 2 TB 209-1 TB 209-2 3 59 3 TB 308-1 TB 308-2 1 TURBINE STEAM STOP VALVES 60 1 TB 109-3 TB 109-4 2, 3, 4 61 2 TB 209-3 TB 209-4 1, 3, 4 62 3 TB 308-3 TB 308-4 1, 2, 4 63 4 TB 407-3 TB 407-4 1, 2, 3
  • I & C *001 . -.. -* ' ----****-*--**--***-***--------

--. --*-': ----.. --------**-***

....... -* _,,.. -----..... -.-.:**. .. . .. . . .. .