            Docket Nos. 50-327, 50-328
            License Nos. DPR-77, DPR-79
                                                                                                      t
            Mr. O. D. Kingsley, Jr.
            Senior Vice President, Nuclear Power
            Tennessee Valley Authority
            6N 38A Lookout Place
            1101 Market Street
            Chattanooga, TN 37402-2801
            Dear.Mr. Kingsley:
            SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-45 AND 50-328/88-45
            This refers to the Nuclear Regulatory Ccmission (NRC) inspection conducted by            :
            J. Lenahan on September 20 - 28, 1988. The inspection included a review of
            activities authorized for your Sequoyah facility. At the conclusion of the
            ' inspection, the findings were discussed with those members of your staff
            identified in the enclosed inspection report.
            Araas examined during the inspection are identified in the report. Within
            these areas, the inspection consisted of selective examinations of procedures
            and represent 4tive records, interviews with personnel, and observation of
            activities in progress.
            Within the scope of the inspection, no violations or deviations were
            identified.
            Your attention is invited to an unresolved item identified in the insper. tion report.
            This matter will be pursued during future inspections.
            In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
            Title 10, Code of Federal Regulations, a ccpy of this letter and its enciosure
            will be placed in the NRC Public Document R00m.
            Should you have any questions concerning this letter, please contact us.
                                                                    *          *
                                                      Sincerely,
                                                    l  b
        881200019488d%p,7                            Frank R. McCoy, Assistant Director
        PDR    ADOCK O                                  for TVA Inspection Programs
                            PNu
        G                                            TVA Projects Division
                                                      Office of Special Projects                      r
                                                                                                      i
            Enclosure-                                                                              a
            NRC Inspection Rt: port
                                                                                                      .
            cc:    (See page 2)
                                                                                                I \
                                                                                                1& of
 
                    .
    e        . ..          -    -
    H, 2y,-                                                      NOV 301988
      c.
                  ~
        .. Tdnnessee Valley. Authority
          .
                                                      2
    ,.
              cc w/ encl:
              J. A. Kirkebo, Vice President,
                Nuclear Engineering
              J. L. LaPoint, Acting Site Director
                Sequoyah Nuclear Plant
              R. L. Gridley, Director
                Nuclear Safety and Licensing
              M. Ray, Acting Site Licensing
                Manager
              TVA Representative, Rockville Office
              General Counsel, TVA
            . State of Tennessee
              bec w/ enc 1:
            ~J.  G. Partlow, OSP
              S. D. Richardson, OSP
              S. C. Black, OSP
              B. D. Liaw, OSP
              K. P. Barr, OSP/RII                    ,
              L. J. Watson, OSP/RII
              J. B. Brady, OSP/RII
  !
              J. Rutberg, 0GC
              NRC Resident Inspector
'
,
,              NRC Document Control Desk
,
d
i-
'
,
:
              RII              RII          RI!        RI
'
                    @                          /erdt        N
                enaHaf:ac      FJape                      ,tson
              1/    88        1$/g88    l
                                              1$/p/88    1pM3/88
,
L
}}
}}

Latest revision as of 06:21, 13 November 2020

Forwards Insp Repts 50-327/88-45 & 50-328/88-45 on 880920- 28.No Violations or Deviations Noted
ML20196D057
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/30/1988
From: Mccoy F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20196D063 List:
References
NUDOCS 8812080194
Download: ML20196D057 (2)


See also: IR 05000327/1988045

Text

" . ..

,

,.  ;\ .- ..

.

l .pa b

a

'

l? ..

NOV 301988 l

.

.

,

!

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

t

Mr. O. D. Kingsley, Jr.

Senior Vice President, Nuclear Power

Tennessee Valley Authority

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Dear.Mr. Kingsley:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-45 AND 50-328/88-45

This refers to the Nuclear Regulatory Ccmission (NRC) inspection conducted by  :

J. Lenahan on September 20 - 28, 1988. The inspection included a review of

activities authorized for your Sequoyah facility. At the conclusion of the

' inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Araas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and represent 4tive records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

Your attention is invited to an unresolved item identified in the insper. tion report.

This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a ccpy of this letter and its enciosure

will be placed in the NRC Public Document R00m.

Should you have any questions concerning this letter, please contact us.

  • *

Sincerely,

l b

881200019488d%p,7 Frank R. McCoy, Assistant Director

PDR ADOCK O for TVA Inspection Programs

PNu

G TVA Projects Division

Office of Special Projects r

i

Enclosure- a

NRC Inspection Rt: port

.

cc: (See page 2)

I \

1& of

.

e . .. - -

H, 2y,- NOV 301988

c.

~

.. Tdnnessee Valley. Authority

.

2

,.

cc w/ encl:

J. A. Kirkebo, Vice President,

Nuclear Engineering

J. L. LaPoint, Acting Site Director

Sequoyah Nuclear Plant

R. L. Gridley, Director

Nuclear Safety and Licensing

M. Ray, Acting Site Licensing

Manager

TVA Representative, Rockville Office

General Counsel, TVA

. State of Tennessee

bec w/ enc 1:

~J. G. Partlow, OSP

S. D. Richardson, OSP

S. C. Black, OSP

B. D. Liaw, OSP

K. P. Barr, OSP/RII ,

L. J. Watson, OSP/RII

J. B. Brady, OSP/RII

!

J. Rutberg, 0GC

NRC Resident Inspector

'

,

, NRC Document Control Desk

,