ML20196D057
| ML20196D057 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/30/1988 |
| From: | Mccoy F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20196D063 | List: |
| References | |
| NUDOCS 8812080194 | |
| Download: ML20196D057 (2) | |
See also: IR 05000327/1988045
Text
"
- \\
. ..
.- ..
,.
,
.
.pa b
l
a
l?
NOV 301988
'
..
.
.
,
!
Docket Nos. 50-327, 50-328
t
Mr. O. D. Kingsley, Jr.
Senior Vice President, Nuclear Power
Tennessee Valley Authority
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Dear.Mr. Kingsley:
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-45 AND 50-328/88-45
This refers to the Nuclear Regulatory Ccmission (NRC) inspection conducted by
J. Lenahan on September 20 - 28, 1988.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
' inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Araas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and represent 4tive records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Your attention is invited to an unresolved item identified in the insper. tion report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a ccpy of this letter and its enciosure
will be placed in the NRC Public Document R00m.
Should you have any questions concerning this letter, please contact us.
Sincerely,
l b
881200019488d%p,7
Frank R. McCoy, Assistant Director
ADOCK O
PNu
for TVA Inspection Programs
G
TVA Projects Division
Office of Special Projects
r
i
Enclosure-
a
NRC Inspection Rt: port
cc:
(See page 2)
.
I \\
1& of
-
- -
-
.
- . -
.
e
.
. ..
H, 2y,-
NOV 301988
-
-
c.
~
.. Tdnnessee Valley. Authority
2
.
,.
cc w/ encl:
J. A. Kirkebo, Vice President,
Nuclear Engineering
J. L. LaPoint, Acting Site Director
Sequoyah Nuclear Plant
R. L. Gridley, Director
Nuclear Safety and Licensing
M. Ray, Acting Site Licensing
Manager
TVA Representative, Rockville Office
General Counsel, TVA
. State of Tennessee
bec w/ enc 1:
~J. G. Partlow, OSP
S. D. Richardson, OSP
S. C. Black, OSP
B. D. Liaw, OSP
K. P. Barr, OSP/RII
,
L. J. Watson, OSP/RII
J. B. Brady, OSP/RII
!
'
J. Rutberg, 0GC
NRC Resident Inspector
,
NRC Document Control Desk
,
,
d
i -
'
,
RII
RII
RI!
RI
enaHaf:ac
/
N
@
'
FJape
erdt
,tson
l
1$/p/88
1pM3/88
1$/g88
1/
88
,
L