| | number = ML20133L496 | | | number = ML20133L496 |
| | issue date = 01/07/1997 | | | issue date = 01/07/1997 |
| | title = Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Dtd 960911 Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program | | | title = Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program |
| | author name = Pittiglio C | | | author name = Pittiglio C |
| | author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) | | | author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = NUDOCS 9701220042 | | | document report number = NUDOCS 9701220042 |
| | | title reference date = 09-11-1996 |
| | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE |
| | page count = 5 | | | page count = 5 |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20128G1421996-09-25025 September 1996 Advises NRC Approved Decommissioning Plan, Impact Of... Fsv Final Decommissioning, Satisfies All Elements of License Termination Plan as Required by Rev to Reactor Decommissioning Rule 10CFR50.82(a)(9) ML20136B2561996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Falsification of Radiation Survey Records.Revised NOV Encl ML20136B2731996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Util Failure to Assure Compliance w/10CFR50.9 Concerning Accuracy of Radiation Survey Records. Revised NOV Encl ML20136B3241996-04-0202 April 1996 Informs That NRC Will Be Withdrawing NOV ,based on Reevaluation of Evidence Provided & Response to NOV ML20058G9671993-12-0707 December 1993 Ack Receipt of Ltrs of 931110,responding to Notice of Violation & Proposed Imposition of Civil Penalty Issued on 931013 IR 05000267/19930021993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Rept 50-267/93-02. Deficiency Determined to Have Contributed to 930527 Crane Overload Event IR 05000267/19930011993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/93-01 ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20128D6931992-12-0101 December 1992 Forwards Exemption from Requirement in 10CFR50,app E,Section IV.F.2 to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise. EA & SE Also Encl ML20198C7511991-06-25025 June 1991 Suggests That Region Iv/Senior Util Executive Conference Be Held During Month of Sept 1991 in Arlington,Tx to Provide Open Forum for Candid Discussions Limited to Topics of General Interest & Not Pertain to Plant Specific Issues ML20058K0231990-11-30030 November 1990 Forwards Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted ML20062H8131990-11-29029 November 1990 Forwards Partially Withheld Insp Rept 50-267/90-18 on 901022-26 & Notice of Violation ML20062H2041990-11-21021 November 1990 Forwards Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted ML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247K9051989-09-19019 September 1989 Advises That 890726 Request for Approval of Route to Transport Spent Reactor Fuel Approved.Route,From Facility to DOE Inel in Idaho,Encl ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl 1998-07-20
[Table view] |
Text
..
<*l January 7,1997 Mr. A.: Clegg Crawford Vice President, Electric Operations Public Service Company of Colorado P.O. Box 840 Denver, Colorado 80201-0840
SUBJECT:
PROPOSED SAMPLING AND SURVEY PLAN FOR THE EFFLUENT PATHWAY, FORT ST. VRAIN FINAL SURVEY PROGRAM-
Dear Mr. Crawford:
The Nuclear Regulatory Commission staff has reviewed the Public Service Company of Colorado's (PSC) Seatember 11. 1996, submittal (P-96068) entitled.
" Proposed Sampling and Survey )lan for Effluent Pathway. Fort St. Vrain Final Survey Program." We have enclosed a number of comments that need to be resolved before final approval of the submittal.
If you have any questions, please contact me, at (301) 415-6702, or David Fauver, at (301) 415-6625.
Sincerely,
[0RIGINAL SIGNED BY:] ,
Clayton L. Pittiglio. Project Manager Low-Level Waste and Decommissioning Projects Branch Division of Waste Management j Office of Nuclear Material Safety '
and Safeguards i Docket No. 50-267 i License No. DPR-34 )
j
Enclosure:
As stated l
cc: See attached list DISTRIBUTION: Central' File- NMSS r/f DWM r/f Spitzberg/RIV LLDP r/f In small Box on "0FC:" line place a: C = Cover E = Cover & Enclosure N = No Copy :
- SEE PREVIOUS CONCURRENCE =
Path & File Name s:\DWM\LLDP\CLP\FSVLTR.PW !
0FC :
LLD{ E LLDP
_ g E LLDP E L%P/ E g I NAME: h/glio DFauv [ TJohnson JHick pggy DATE: ,I N J/96 12/16/96 12/31/96 1/ /97 h g_g / f 0FFICIAL RECORD COPY //J/'/(f PDR : YES x NO Category: Proprietary or CF Only l Delete file after distribution Yes
~\CNW: YES NO. x No x i IG: YES NO x l 9701.220042 970107 DR ADOCK 050002 7 gh
)hek W
8
, apnCity '
t UNITED STATES
< S NUCLEAR REGULATORY COMMISSION f WASHINGTON, D.C. 20065 4 001
+4 ** / January 7,1997 Mr. A. Clegg Crawford Vice President Electric Operations Public Service Company of Colorado P.O. Box 840 Denver. Colorado 80201-0840
SUBJECT:
PROPOSED SAMPLING AND SURVEY PLAN FOR THE EFFLUENT PATHWAY.
FORT ST. VRAIN FINAL SURVEY PROGRAM
Dear Mr. Crawford:
The Nuclear Regulatory Commission staff has reviewed the Public Service Company of Colorado's (PSC) Seatember 11, 1996, submittal (P-96068) entitled. i
" Proposed Sampling and Survey plan for Effluent Pathway, Fort St. Vrain Final Survey Program." We have enclosed a number of comments that need to be ,
resolved before final approval of the submittal. l If you have any questions, please contact me, at (301) 415-6702, or David I Fauver, at (301) 415-6625.
Sincerely.
Clayt L. P ttiglio P ect Manager Low-Level Waste a e mmissioning Projects Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards ,
Docket No. 50-267 License No. DPR-34
Enclosure:
As stated cc: See attached list
, o h
Fort St. Vrain Letter dated: January 7, 1997 Docket No. 50-267 License No. DPR-34 cc: <
Mr. Wayne H. 8runetti President, and Chief Executive Officer Public Service Company of Colorado P.O. Box 840 Denver CO 80201-0840 Regional Administrator. Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive. Suite 400 Arlington TX 76011 Chairman Board of County Commissioners of Weld County, Colorado Greeley, CO 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 - Denver Place 999 18th Street. Suite 1300 Denver. CO 80202-2413 Radiation Control Division (RCD-D0-B1)
Colorado Department of Health 4300 Cherry Creek Drive South Denver CO 80222-1530
-Commitment Control Program Coordinator Public Service Com3any of Colorado 16805 Weld County Road 19-1/2 Platteville. CO 80651 Mr. M. H. Holmes Nuclear Licensing Manager Public Service Com)any of Colorado 16805 Weld County Road 19-1/2 Platteville CO 80651 i
t r
NRC Comments on Public Service Company of Colorado Submittal, " Proposed Sampling and. Survey Plan for Effluent Pathway, Fort Saint Vrain Final Survey ,
Program," September 11. 1996 1)- The RESRAD analysis for' determining the site-specific guideline values used a scenario that assumes the open land areas will continue to be .
used as pasture land. Additional information is needed to support the assumed future land use and potential future dose to members of the :
public. PSC should use the default parameters from Scenario C of PG 08 to determine the most conservative unrestricted use dose and compare this: dose with the dose using the site-specific guideline values PSC
-believes to be more realistic. Approval of the alternate scenario will depend on the magnitude of the differences between the baseline and guideline values, the time required for the dose from Scenario C to be reduced to acceptable levels by radionuclide decay (which provides an indication of how long the ' alternate land use scenario would need to be !
in place), and the strength of the justification for the alternative scenario, t
- 2) Were subsurface samples collected during characterization to support the PSC conclusion that contamination is limited to the surface? If so, please provide the results. If not, please provide additional information supporting this conclusion.
- 3) Were each of the soil / sediment samples analyzed for all of the ,
radionuclides listed in Table 7.1? What information was used to select !
. the radionuclides listed in Table 7.1? Why was Sr-90 not included in
- the table?
- 4) The characterization data were used as the primary justification for reducing the sample size in the effluent pathway survey units. Please
, provide the effluent pathway characterization results for NRC review. ,
There is insufficient justification provided for not providing sample j frequencies consistent with NUREG-5849 for affected areas. If p characterization data meet the same data quality objectives as the final survey, these data can be used as final survey data.
! 5) Was the potential for groundwater contamination evaluated?
- 6) The Jay Thomas Ditch was designed as Affected Class 1 thus requiring
- 100% scan. Table 7.4 designates the area as Affected Class 1 but does not reflect the 100%' scan for the Jay Thomas Ditch. What is the basis for this discrepancy?
l 7) What is the area of the sediment storage area?
Enclosure
- ' . Mr. A. Clegg Crawford Vice President, Electric Operations Public Service Company of Colorado P.O. Box 840 Denver, Colorado 80201-0840 _
SUBJECT:
PROPOSED SAMPLING AND SURVEY PLAN FOR THE EFFLUENT HWAY, FORT ST. VRAIN FINAL SURVEY PROGRAM
Dear Mr. Crawford:
The Nuclear Regulatory Commission staff has reviewed e PubTic Service Company of Colorado's (PSC) September 11, 1996, su ttal/(P-96068) entitled,
" Proposed Sampling and Survey Plan for Effluent P hway/ Fort St. Vrain Final Survey Program." We have enclosed a number of ents that need to be resolved before final approval of the submitta .
If you have any questions, please contact D id Jf. Fauver at (301) 415-6625I or I can be contacted at (301) 415-6702.
Sintop rejL., Pittiglio, Project Manager Cl
-l.evel Waste and De' commissioning Projects Branch D141sion of Waste Management ffice of Nuclear Material Safety and Safeguards Docket No. 50-267 License No. DPR-34
Enclosure:
As stated cc: See attached list DISTRIBUTION: Central Fil . NMSS r/f JGre Dir r/f
- LL N CPoland HWM-effw IV/Spitzber LHREMilRB6issF o[stfihb(8 6MtfDifijss'DDJfibdfiW36pMsfsfi6Es In small Box on "0FC:" ifplacea: C = Cover E = Cover b Enc 1osure ,N = No Copy 0FC : LLDP
[ ,dDP ,
E LLDP ,/ E LLDP /k NAME:
Ch h DFauv 8 TJohn[re" JH)ck'[
DATE: ,12 7M [ 12//4/96 12/3//96 ) [ /96 M h & Fil N e s:\DWM\LLDP\CLP\fSVLTR.PW WICIAL C D COPY In real Bo on "DATE:" line place a: M = E-Mail Distribution Copy H = Hard Copy P : YES x NO Category: Proprietary or CF Only ,
CNW: YES NO x Delete file after distribution Yes No x !
IG: YES N0 x
)
i 1
1