{{#Wiki_filter:December 12, 2006Mr. David A. ChristianSenior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
{{#Wiki_filter:December 12, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING TO DISCUSS REVISED RISK ASSESSMENTINFORMATION AND FUTURE ACTIONS FOR THE KEWAUNEE POWER STATION
PUBLIC MEETING TO DISCUSS REVISED RISK ASSESSMENT INFORMATION AND FUTURE ACTIONS FOR THE KEWAUNEE POWER STATION


==Dear Mr. Christian:==
==Dear Mr. Christian:==


This letter refers to the public meeting conducted on November 30, 2006, at the Region IIIOffice in Lisle, Illinois. The meeting was held at our request to discuss the status of your revised risk assessment program at the Kewaunee power station.Mr. Mark Satorius, Director, Division of Reactor Projects, at the Nuclear RegulatoryCommission (NRC), Regi on III, opened the meeting with introductions of NRC officialsand then turned the meeting over to your staff.Ms. Leslie Hartz, Site Vice President, then lead a presentation provided by several Dominionstaff members that described Dominion's revised risk assessment results for the Kewaunee station and risk reduction activities that had been completed and those that are planned in both the near and long term. The presentation summarized that once the planned modifications are complete that the baseline risk assessments values for Kewaunee would be reduced by about 91 percent from the current values. Mr. James Caldwell, Region III Administrator, concluded the meeting by thanking your staff forcoming to the Regional Office and providing the information. He then acknowledged the efforts taken to date and your planned efforts to continue to reduce baseline risk at the Kewaunee plant.A listing of principal Dominion and NRC meeting attendees and a copy of the handout providedby Dominion at the meeting are enclosed as Enclosures 1 and 2, respectively, to this letter.
This letter refers to the public meeting conducted on November 30, 2006, at the Region III Office in Lisle, Illinois. The meeting was held at our request to discuss the status of your revised risk assessment program at the Kewaunee power station.
D. Christian-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If you have any questions regarding this meeting, please contact me at (630) 829-9627.Sincerely,/RA/Patrick L. Louden, ChiefBranch 5 Division of Reactor ProjectDocket No. 50-305License No. DPR-43
Mr. Mark Satorius, Director, Division of Reactor Projects, at the Nuclear Regulatory Commission (NRC), Region III, opened the meeting with introductions of NRC officials and then turned the meeting over to your staff.
Ms. Leslie Hartz, Site Vice President, then lead a presentation provided by several Dominion staff members that described Dominions revised risk assessment results for the Kewaunee station and risk reduction activities that had been completed and those that are planned in both the near and long term. The presentation summarized that once the planned modifications are complete that the baseline risk assessments values for Kewaunee would be reduced by about 91 percent from the current values.
Mr. James Caldwell, Region III Administrator, concluded the meeting by thanking your staff for coming to the Regional Office and providing the information. He then acknowledged the efforts taken to date and your planned efforts to continue to reduce baseline risk at the Kewaunee plant.
A listing of principal Dominion and NRC meeting attendees and a copy of the handout provided by Dominion at the meeting are enclosed as Enclosures 1 and 2, respectively, to this letter.
 
D. Christian                                     In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions regarding this meeting, please contact me at (630) 829-9627.
Sincerely,
                                              /RA/
Patrick L. Louden, Chief Branch 5 Division of Reactor Project Docket No. 50-305 License No. DPR-43


==Enclosures:==
==Enclosures:==
: 1. Public Meeting Attendees2. Dominion presentation slidescc w/encls:L. Hartz, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin D. Christian2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letterand its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If you have any questions regarding this meeting, please contact me at (630) 829-9627.Sincerely,Patrick L. Louden, ChiefBranch 5 Division of Reactor ProjectDocket No. 50-305License No. DPR-43
: 1. Public Meeting Attendees
: 2. Dominion presentation slides cc w/encls:   L. Hartz, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin
 
D. Christian                                                                  2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions regarding this meeting, please contact me at (630) 829-9627.
Sincerely, Patrick L. Louden, Chief Branch 5 Division of Reactor Project Docket No. 50-305 License No. DPR-43


==Enclosures:==
==Enclosures:==
: 1. Public Meeting Attendees2. Dominion presentation slidescc w/encl:L. Hartz, Site Vice PresidentC. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of WisconsinDOCUMENT NAME:C:\FileNet\ML063460506.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIINAMEPLouden:dtpDATE12/12/2006OFFICIAL RECORD COPY D. Christian-3-DISTRIBUTION
: 1. Public Meeting Attendees
:TEB JFS2 RidsNrrDirsIrib GEG KGO GLS SXB3 DRPIII DRSIII PLB1 TXN PUBLIC MEETING PRINCIPAL ATTENDEESNovember 30, 2006DominionLeslie HartzSite Vice President, KewauneeJerry BischofVice President of Engineering Lori ArmstrongDirector of Engineering, Kewaunee Tom WebbDirector of Safety and Licensing, Kewaunee Thomas HookPRA Supervisor Dave BucheitNSE Manager Tom BreeneLicensing ManagerSeveral other Dominion representatives were on the telephone listening to the meeting from theInnsbrook, Virginia, corporate office.Nuclear Regulatory CommissionJames CaldwellRegional Administrator, Region IIIGeoffrey GrantDeputy Regional Administrator, Region III Mark SatoriusDirector, Division of Reactor Projects, Region III Anne BolandDeputy Director, Division of Reactor Safety, Region III Patrick LoudenChief, Branch 5, Division of Reactor Projects Stephen BurtonSenior Resident Inspector, Kewaunee Mike FranovichChief APOB, NRR Jeff CircleAPOB, NRR Sonia BurgessSenior Risk Analyst, Region III Dave PassehlSenior Risk Analyst, Region III Roland LickusState Liaison Officer, Region III Ron LangstaffSenior Reactor Inspector Alan DahburReactor Inspector David JaffeProject Manager, NRR (via telephone)
: 2. Dominion presentation slides cc w/encl:               L. Hartz, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin DOCUMENT NAME:C:\FileNet\ML063460506.wpd G Publicly Available                       G Non-Publicly Available                 G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE            RIII NAME              PLouden:dtp DATE              12/12/2006 OFFICIAL RECORD COPY
PublicJeff KitsembelWisconsin Public Service Commission (via telephone)}}
 
D. Christian   DISTRIBUTION:
TEB JFS2 RidsNrrDirsIrib GEG KGO GLS SXB3 DRPIII DRSIII PLB1 TXN
 
PUBLIC MEETING PRINCIPAL ATTENDEES November 30, 2006 Dominion Leslie Hartz                          Site Vice President, Kewaunee Jerry Bischof                          Vice President of Engineering Lori Armstrong                        Director of Engineering, Kewaunee Tom Webb                              Director of Safety and Licensing, Kewaunee Thomas Hook                            PRA Supervisor Dave Bucheit                          NSE Manager Tom Breene                            Licensing Manager Several other Dominion representatives were on the telephone listening to the meeting from the Innsbrook, Virginia, corporate office.
Nuclear Regulatory Commission James Caldwell                        Regional Administrator, Region III Geoffrey Grant                        Deputy Regional Administrator, Region III Mark Satorius                          Director, Division of Reactor Projects, Region III Anne Boland                            Deputy Director, Division of Reactor Safety, Region III Patrick Louden                        Chief, Branch 5, Division of Reactor Projects Stephen Burton                        Senior Resident Inspector, Kewaunee Mike Franovich                        Chief APOB, NRR Jeff Circle                            APOB, NRR Sonia Burgess                          Senior Risk Analyst, Region III Dave Passehl                          Senior Risk Analyst, Region III Roland Lickus                          State Liaison Officer, Region III Ron Langstaff                          Senior Reactor Inspector Alan Dahbur                            Reactor Inspector David Jaffe                            Project Manager, NRR (via telephone)
Public Jeff Kitsembel                        Wisconsin Public Service Commission (via telephone)
Enclosure 1}}

Revision as of 12:23, 23 November 2019

11/30/2006 Summary of Public Meeting with Dominion to Discuss Revised Risk Assessment Information and Future Actions for Kewaunee Power Station
ML063460506
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/12/2006
From: Louden P
NRC/RGN-III/DRP/RPB5
To: Christian D
Dominion, Dominion Energy Kewaunee
References
Download: ML063460506 (5)


Text

December 12, 2006 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

PUBLIC MEETING TO DISCUSS REVISED RISK ASSESSMENT INFORMATION AND FUTURE ACTIONS FOR THE KEWAUNEE POWER STATION

Dear Mr. Christian:

This letter refers to the public meeting conducted on November 30, 2006, at the Region III Office in Lisle, Illinois. The meeting was held at our request to discuss the status of your revised risk assessment program at the Kewaunee power station.

Mr. Mark Satorius, Director, Division of Reactor Projects, at the Nuclear Regulatory Commission (NRC), Region III, opened the meeting with introductions of NRC officials and then turned the meeting over to your staff.

Ms. Leslie Hartz, Site Vice President, then lead a presentation provided by several Dominion staff members that described Dominions revised risk assessment results for the Kewaunee station and risk reduction activities that had been completed and those that are planned in both the near and long term. The presentation summarized that once the planned modifications are complete that the baseline risk assessments values for Kewaunee would be reduced by about 91 percent from the current values.

Mr. James Caldwell, Region III Administrator, concluded the meeting by thanking your staff for coming to the Regional Office and providing the information. He then acknowledged the efforts taken to date and your planned efforts to continue to reduce baseline risk at the Kewaunee plant.

A listing of principal Dominion and NRC meeting attendees and a copy of the handout provided by Dominion at the meeting are enclosed as Enclosures 1 and 2, respectively, to this letter.

D. Christian In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions regarding this meeting, please contact me at (630) 829-9627.

Sincerely,

/RA/

Patrick L. Louden, Chief Branch 5 Division of Reactor Project Docket No. 50-305 License No. DPR-43

Enclosures:

1. Public Meeting Attendees
2. Dominion presentation slides cc w/encls: L. Hartz, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin

D. Christian 2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions regarding this meeting, please contact me at (630) 829-9627.

Sincerely, Patrick L. Louden, Chief Branch 5 Division of Reactor Project Docket No. 50-305 License No. DPR-43

Enclosures:

1. Public Meeting Attendees
2. Dominion presentation slides cc w/encl: L. Hartz, Site Vice President C. Funderburk, Director, Nuclear Licensing and Operations Support T. Breene, Manager, Nuclear Licensing L. Cuoco, Esq., Senior Counsel D. Zellner, Chairman, Town of Carlton J. Kitsembel, Public Service Commission of Wisconsin State Liaison Officer, State of Wisconsin DOCUMENT NAME:C:\FileNet\ML063460506.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME PLouden:dtp DATE 12/12/2006 OFFICIAL RECORD COPY

D. Christian DISTRIBUTION:

TEB JFS2 RidsNrrDirsIrib GEG KGO GLS SXB3 DRPIII DRSIII PLB1 TXN

PUBLIC MEETING PRINCIPAL ATTENDEES November 30, 2006 Dominion Leslie Hartz Site Vice President, Kewaunee Jerry Bischof Vice President of Engineering Lori Armstrong Director of Engineering, Kewaunee Tom Webb Director of Safety and Licensing, Kewaunee Thomas Hook PRA Supervisor Dave Bucheit NSE Manager Tom Breene Licensing Manager Several other Dominion representatives were on the telephone listening to the meeting from the Innsbrook, Virginia, corporate office.

Nuclear Regulatory Commission James Caldwell Regional Administrator, Region III Geoffrey Grant Deputy Regional Administrator, Region III Mark Satorius Director, Division of Reactor Projects, Region III Anne Boland Deputy Director, Division of Reactor Safety, Region III Patrick Louden Chief, Branch 5, Division of Reactor Projects Stephen Burton Senior Resident Inspector, Kewaunee Mike Franovich Chief APOB, NRR Jeff Circle APOB, NRR Sonia Burgess Senior Risk Analyst, Region III Dave Passehl Senior Risk Analyst, Region III Roland Lickus State Liaison Officer, Region III Ron Langstaff Senior Reactor Inspector Alan Dahbur Reactor Inspector David Jaffe Project Manager, NRR (via telephone)

Public Jeff Kitsembel Wisconsin Public Service Commission (via telephone)

Enclosure 1