| | issue date = 05/03/2016 | | | issue date = 05/03/2016 |
| | title = April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 | | | title = April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 |
| | author name = Rose S D | | | author name = Rose S |
| | author affiliation = NRC/RGN-II/DRP/RPB5 | | | author affiliation = NRC/RGN-II/DRP/RPB5 |
| | addressee name = | | | addressee name = |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/ Reactor Projects Branch 5 Division of Reactor Projects | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/ |
| | Reactor Projects Branch 5 Division of Reactor Projects |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING SUMMARY- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout. The following NRC staff attended the public meeting: Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7 | | PUBLIC MEETING |
| | |
| | ==SUMMARY== |
| | - NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout. |
| | The following NRC staff attended the public meeting: |
| | Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Attendees 2. Meeting Handout | | : 1. List of Attendees |
| | : 2. Meeting Handout |
|
| |
|
| North Anna Power Station, Units 1 and 2Annual Assessment Meeting2015 Reactor Oversight ProcessNuclear Regulatory Commission Region 2 NRC Strategic Plan GoalsSafety-Ensure adequate protection of public health and safety and the environmentSecurity-Ensure adequate protection in the secure use and management of radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Regulatory FrameworkNRC's Safety Mission Strategic Performance AreasCornerstonesCross-Cutting Areas(Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution) | | North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2 |
| Significance ThresholdGreenBaseline InspectionWhiteRequires additional NRC oversightYellowRequires more NRC oversightRedRequires most NRC oversightPerformance IndicatorsInspection FindingsGreenVery low safety issueWhiteLow to moderate safety issueYellowSubstantial safety issueRedHigh safety issue Action Matrix ColumnsIncreasingSafety SignificanceInspection Management InvolvementRegulatory ActionLicensee ResponseRegulatoryResponseDegradedMultiple/RepetitiveDegradedUnacceptable Performance NRC Annual Assessment SummaryVEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix for all of 2015.North Anna Power Station, Units 1 and 2 NRC Inspection ActivitiesTwo Resident Inspectors on Site Implemented baseline inspection programInspected in-plant evolutions and activitiesCompiled and submitted quarterly inspection reportsThree Major Team InspectionsProblem Identification and Resolution InspectionComponent Design Bases InspectionTriennial Fire Protection InspectionNorth Anna Power Station, Units 1 and 2 for 2015 North Anna Power Station, Units 1 and 2 PIs and FindingsPerformance Indicators were all Green9 GreenNCV inspection findings No greater than Green inspection findings NRC Plans for 2016NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016. | | |
| National Summary of Plant PerformanceStatus as of 02/22/2016Licensee Response 90Regulatory Response 7Degraded Cornerstone 0Multiple/Repetitive Deg. Cornerstone3Unacceptable 0IMC 0350 Oversight0Total100 Actions in Response to the Japan Nuclear AccidentActions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.htmlMailbox for comments on staff actions: JLD_Public.Resource@nrc.govOffice of Public Affairs Point of Contact: OPA.resource@nrc.govor 301-415-8200 Open to the PublicThe NRC places a high priority on keeping the public and stakeholders informed of its activities. At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents. | | NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials |
| Contacting the NRCReport an emergency-(301) 816-5100 (call collect)Report a safety concern -(800) 695-7403 -Allegation@nrc.govGeneral information or questions-www.nrc.gov-Select "What We Do" for Public Affairs NRC Social Media ToolsNRC Blog http://public-blog.nrc-gateway.gov/NRC Twitter https://twitter.com/#!/NRCgovNRC Chat http://chat.nrc-gateway.gov/NRC YouTube http://www.youtube.com/user/NRCgovNRC Flickr Gallery http://www.flickr.com/people/NRCgovNRC RSS Feeds http://www.nrc.gov/public-involve/listserver.html#rssNRC GovDelivery-https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/ Reactor Projects Branch 5 Division of Reactor Projects | | |
| | Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response |
| | |
| | Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution) |
| | |
| | Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue |
| | |
| | Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing |
| | * Safety Significance |
| | * Inspection |
| | * Management Involvement |
| | * Regulatory Action |
| | |
| | NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment. |
| | North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015. |
| | |
| | NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection |
| | |
| | North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings |
| | |
| | NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016. |
| | |
| | National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100 |
| | |
| | Actions in Response to the Japan Nuclear Accident |
| | * Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html |
| | * Mailbox for comments on staff actions: |
| | JLD_Public.Resource@nrc.gov |
| | * Office of Public Affairs Point of |
| | |
| | ==Contact:== |
| | OPA.resource@nrc.gov or 301-415-8200 |
| | |
| | Open to the Public |
| | * The NRC places a high priority on keeping the public and stakeholders informed of its activities. |
| | * At www.nrc.gov, you can: |
| | - Find public meeting dates and transcripts; |
| | - Read NRC testimony, speeches, press releases, and policy decisions; and |
| | - Access the agencys Electronic Reading Room to find NRC publications and documents. |
| | |
| | Contacting the NRC |
| | * Report an emergency |
| | - (301) 816-5100 (call collect) |
| | * Report a safety concern |
| | - (800) 695-7403 |
| | - Allegation@nrc.gov |
| | * General information or questions |
| | - www.nrc.gov |
| | - Select What We Do for Public Affairs |
| | |
| | NRC Social Media Tools |
| | * NRC Blog http://public-blog.nrc-gateway.gov/ |
| | * NRC Twitter https://twitter.com/#!/NRCgov |
| | * NRC Chat http://chat.nrc-gateway.gov/ |
| | * NRC YouTube http://www.youtube.com/user/NRCgov |
| | * NRC Flickr Gallery http://www.flickr.com/people/NRCgov |
| | * NRC RSS Feeds http://www.nrc.gov/public- involve/listserver.html#rss NRC GovDelivery - |
| | https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC |
| | |
| | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/ |
| | Reactor Projects Branch 5 Division of Reactor Projects |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING SUMMARY- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout. The following NRC staff attended the public meeting: Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7 | | PUBLIC MEETING |
| | |
| | ==SUMMARY== |
| | - NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout. |
| | The following NRC staff attended the public meeting: |
| | Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Attendees 2. Meeting Handout | | : 1. List of Attendees |
| | : 2. Meeting Handout |
| | |
| | North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2 |
| | |
| | NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials |
| | |
| | Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response |
| | |
| | Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution) |
| | |
| | Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue |
| | |
| | Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing |
| | * Safety Significance |
| | * Inspection |
| | * Management Involvement |
| | * Regulatory Action |
| | |
| | NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment. |
| | North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015. |
| | |
| | NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection |
| | |
| | North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings |
| | |
| | NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016. |
| | |
| | National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100 |
| | |
| | Actions in Response to the Japan Nuclear Accident |
| | * Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html |
| | * Mailbox for comments on staff actions: |
| | JLD_Public.Resource@nrc.gov |
| | * Office of Public Affairs Point of |
| | |
| | ==Contact:== |
| | OPA.resource@nrc.gov or 301-415-8200 |
| | |
| | Open to the Public |
| | * The NRC places a high priority on keeping the public and stakeholders informed of its activities. |
| | * At www.nrc.gov, you can: |
| | - Find public meeting dates and transcripts; |
| | - Read NRC testimony, speeches, press releases, and policy decisions; and |
| | - Access the agencys Electronic Reading Room to find NRC publications and documents. |
| | |
| | Contacting the NRC |
| | * Report an emergency |
| | - (301) 816-5100 (call collect) |
| | * Report a safety concern |
| | - (800) 695-7403 |
| | - Allegation@nrc.gov |
| | * General information or questions |
| | - www.nrc.gov |
| | - Select What We Do for Public Affairs |
|
| |
|
| North Anna Power Station, Units 1 and 2Annual Assessment Meeting2015 Reactor Oversight ProcessNuclear Regulatory Commission Region 2 NRC Strategic Plan GoalsSafety-Ensure adequate protection of public health and safety and the environmentSecurity-Ensure adequate protection in the secure use and management of radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Regulatory FrameworkNRC's Safety Mission Strategic Performance AreasCornerstonesCross-Cutting Areas(Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)
| | NRC Social Media Tools |
| Significance ThresholdGreenBaseline InspectionWhiteRequires additional NRC oversightYellowRequires more NRC oversightRedRequires most NRC oversightPerformance IndicatorsInspection FindingsGreenVery low safety issueWhiteLow to moderate safety issueYellowSubstantial safety issueRedHigh safety issue Action Matrix ColumnsIncreasingSafety SignificanceInspection Management InvolvementRegulatory ActionLicensee ResponseRegulatoryResponseDegradedMultiple/RepetitiveDegradedUnacceptable Performance NRC Annual Assessment SummaryVEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix for all of 2015.North Anna Power Station, Units 1 and 2 NRC Inspection ActivitiesTwo Resident Inspectors on Site Implemented baseline inspection programInspected in-plant evolutions and activitiesCompiled and submitted quarterly inspection reportsThree Major Team InspectionsProblem Identification and Resolution InspectionComponent Design Bases InspectionTriennial Fire Protection InspectionNorth Anna Power Station, Units 1 and 2 for 2015 North Anna Power Station, Units 1 and 2 PIs and FindingsPerformance Indicators were all Green9 GreenNCV inspection findings No greater than Green inspection findings NRC Plans for 2016NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
| | * NRC Blog http://public-blog.nrc-gateway.gov/ |
| National Summary of Plant PerformanceStatus as of 02/22/2016Licensee Response 90Regulatory Response 7Degraded Cornerstone 0Multiple/Repetitive Deg. Cornerstone3Unacceptable 0IMC 0350 Oversight0Total100 Actions in Response to the Japan Nuclear AccidentActions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.htmlMailbox for comments on staff actions: JLD_Public.Resource@nrc.govOffice of Public Affairs Point of Contact: OPA.resource@nrc.govor 301-415-8200 Open to the PublicThe NRC places a high priority on keeping the public and stakeholders informed of its activities. At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.
| | * NRC Twitter https://twitter.com/#!/NRCgov |
| Contacting the NRCReport an emergency-(301) 816-5100 (call collect)Report a safety concern -(800) 695-7403 -Allegation@nrc.govGeneral information or questions-www.nrc.gov-Select "What We Do" for Public Affairs NRC Social Media ToolsNRC Blog http://public-blog.nrc-gateway.gov/NRC Twitter https://twitter.com/#!/NRCgovNRC Chat http://chat.nrc-gateway.gov/NRC YouTube http://www.youtube.com/user/NRCgovNRC Flickr Gallery http://www.flickr.com/people/NRCgovNRC RSS Feeds http://www.nrc.gov/public-involve/listserver.html#rssNRC GovDelivery-https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC}}
| | * NRC Chat http://chat.nrc-gateway.gov/ |
| | * NRC YouTube http://www.youtube.com/user/NRCgov |
| | * NRC Flickr Gallery http://www.flickr.com/people/NRCgov |
| | * NRC RSS Feeds http://www.nrc.gov/public- involve/listserver.html#rss NRC GovDelivery - |
| | https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC}} |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21174A3042021-06-23023 June 2021 SLRA RAI Response Public Meeting - 21-06-24 ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18320A2502018-11-20020 November 2018 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting ML18141A3072018-05-21021 May 2018 18 - SLR Status ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16104A3822016-04-26026 April 2016 New Fuel Storage Rack & SFP Criticality Analysis for April 26th 2016 Scheduled Category 1, Pre-Submittal Public Teleconference ML16104A3872016-04-13013 April 2016 Criticality Analysis Checklist for North Anna ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML1124205512011-08-30030 August 2011 Seismic Event ML1110304942011-04-13013 April 2011 Public Meeting Attendees ML1110304982011-04-13013 April 2011 Public Meeting Handouts ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation ML0911000392009-04-17017 April 2009 Notice of Public Meeting Category 1 - Annual Assessment of North Anna Power Station 2024-09-03
[Table view] Category:Meeting Summary
MONTHYEARML24222A4232024-08-19019 August 2024 Summary of June 17, 2024, Meeting with Virginia Electric and Power Company About Guidance in Section 7.5 of Standard Review Plan for Light Water Reactors ML24222A6992024-08-16016 August 2024 August 6, 2024, Summary of Regarding Potential License Amendment Request Change to Surveillance Requirements for Moderator Temperature Coefficient for Millstone, Unit No. 3, North Anna, Unit Nos. 1 and 2, and Summer, Unit No. 1 - ML23345A1092023-12-14014 December 2023 December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2 ML23167A7012023-06-26026 June 2023 Summary of Public Meeting with VEPCO Concerning a License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21293A0992021-12-10010 December 2021 Meeting Summary for Draft Supplemental Environmental Impact Statement Public Meeting ML21221A3022021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21221A3032021-10-18018 October 2021 June 24, 2021, Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000)- List of Attendees ML21239A0662021-09-0202 September 2021 August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - Summary ML21236A0532021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21221A0312021-08-27027 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21236A0512021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Memo ML21236A0582021-08-27027 August 2021 August 16, 2021, Meeting Summary: Discussion of Aging Management of Cyclic Fatigue in the Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - List of Attendees ML21221A0262021-08-26026 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21221A1382021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Meeting Summary ML21145A2152021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 2 - List of Attendees ML21145A2132021-06-0909 June 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Enclosure 1 - Summary ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20324A2592020-12-0303 December 2020 Scoping Meeting Summary ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML20104A0392020-04-21021 April 2020 Presubmittal Meeting Summary ML19190A2862019-07-16016 July 2019 Summary of July 7, 2019, Public Meeting with Dominion to Discuss Open Phase Condition RAI Responses ML19144A1292019-05-30030 May 2019 Summary of November 20, 2018, Pre Application Meeting with Dominion Energy Regarding the Planned License Amendment Request to Revise Emergency Action Levels ML19128A3432019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18151A4682018-05-29029 May 2018 Public Meeting Summary - 2017 Annual Assessment Public Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339 ML18066A0192018-03-16016 March 2018 Meeting Summary of October 4, 2017 Pre-Submittal Public Meeting to Discuss LAR Request Regarding Consolidation of the Emergency Operations Facilities ML17123A2092017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the North Anna Power Station, Units 1 and 2 with the Public for the Period of January 1, 2016 Through December 31, 2016 ML16138A0752016-05-19019 May 2016 Summary of April 26, 2016, Pre-Application Teleconference with Virginia Electric and Power Company for Increase in Maximum Fuel Enrichment for the New Fuel Storage Racks and the Spent Fuel Pool ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15316A2522015-11-19019 November 2015 October 20, 2015, Millstone, Units 2 and 3, Surry, Units 1 and 2, North Anna, Units 1 and 2 - Summary of Pre-submittal Conference Call Regarding Emergency Action Level Scheme Changes ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14101A1202014-04-11011 April 2014 Public Meeting Summary - North Anna Power Station, Docket Nos. 50-338, 50-339 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13151A1282013-05-31031 May 2013 Public Meeting Summary - North Anna Power Station Docket Nos. 50-338 and 50-339 ML12131A5032012-05-0909 May 2012 5/1/2012 Summary of Category 1 Public Meeting Regarding the Annual Assessment of the North Anna Power Station ML12060A3682012-03-0101 March 2012 G20110668/EDATS: OEDO-2011-0622 - 02/02/12 - Meeting Summary for Meeting with Paul Gunter Et Al. Regarding Their 10 CFR 2.206 Petition to Suspend the Operating Licenses for North Anna Power Station, Unit Nos. 1 and 2 ML12060A3522012-03-0101 March 2012 G20110757/EDATS: OEDO-2011-0701 - 12/12/11 - Meeting Summary of Meeting with Paul Gunter Et Al. Regarding Their 10 CFR 2.206 Petition to Suspend the Operating Licenses (Ols) for North Anna 1 and 2 ML1131804092011-11-14014 November 2011 Public Meeting Summary - Status of Nrc'S Restart Review and Inspection - North Anna Power Station ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML1110304742011-04-13013 April 2011 Public Meeting/Open House Summary Letter ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020704582010-07-28028 July 2010 Summary of Meeting with VEPCO to Discuss Fuel Transition Licensing ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop 2024-08-19
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML18040A0502018-02-0606 February 2018 Conversation Record with Dominion Energy Virginia Discuss North Power Station (NAPS) Independent Spent Fuel Storage Installation (ISFSI) Technical Specification ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML11333A1262011-12-0707 December 2011 Summary of Conference Call Regarding the 2011 Steam Generator Tube Inspection Results 2018-02-06
[Table view] Category:Verbal Comm
MONTHYEARML18040A0502018-02-0606 February 2018 Conversation Record with Dominion Energy Virginia Discuss North Power Station (NAPS) Independent Spent Fuel Storage Installation (ISFSI) Technical Specification ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML11333A1262011-12-0707 December 2011 Summary of Conference Call Regarding the 2011 Steam Generator Tube Inspection Results 2018-02-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/
Reactor Projects Branch 5 Division of Reactor Projects
SUBJECT:
PUBLIC MEETING
SUMMARY
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.
The following NRC staff attended the public meeting:
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7
Enclosures:
- 1. List of Attendees
- 2. Meeting Handout
North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue
Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing
NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.
NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection
North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings
NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100
Actions in Response to the Japan Nuclear Accident
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.resource@nrc.gov or 301-415-8200
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
NRC Social Media Tools
https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/
Reactor Projects Branch 5 Division of Reactor Projects
SUBJECT:
PUBLIC MEETING
SUMMARY
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.
The following NRC staff attended the public meeting:
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7
Enclosures:
- 1. List of Attendees
- 2. Meeting Handout
North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)
Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue
Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing
NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.
NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection
North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings
NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100
Actions in Response to the Japan Nuclear Accident
- Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
- Office of Public Affairs Point of
Contact:
OPA.resource@nrc.gov or 301-415-8200
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
NRC Social Media Tools
https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC