Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station
ML23151A547
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 06/01/2023
From: Adam Wilson
NRC/RGN-II/DRP/RPB4
To: Matthew Fannon
NRC/RGN-II/DRP/RPB4
References
Download: ML23151A547 (2)


Text

June 1, 2023 MEMORANDUM TO: Matthew S. Fannon, Chief Reactor Projects Branch 4 Division of Reactor Projects Region II FROM: Adam A. Wilson, Senior Project Engineer Signed by Wilson, Adam Reactor Projects Branch 4 on 06/01/23 Division of Reactor Projects Region II

SUBJECT:

PUBLIC MEETING

SUMMARY

- 2022 ANNUAL ASSESSMENT MEETING REGARDING NORTH ANNA POWER STATION, DOCKET NOS. 50-338 AND 50-339; AND SURRY POWER STATION, DOCKET NOS. 50-280 AND 50-281, MEETING NUMBER 20230430 On May 9, 2023, the Nuclear Regulatory Commission (NRC) conducted a live virtual meeting concerning North Anna Power Station and Surry Power Station. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2022, through December 31, 2022.

The public meeting was held remotely through the Microsoft Teams application. Additionally, a call-only telephone bridge line was available. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML23103A381), Assessment Meeting Presentation (ML23103A348).

The meeting was conducted from 6:00 PM to 7:00 PM local time. Meeting attendees consisted of representatives from the NRC, Dominion Energy, and members of the public. Due to the nature of the meeting, no official list of attendees is included. NRC staff were available for questions following each presentation. There was minimal interaction with the public which was consistent with the typical annual assessment meetings conducted near the station.

The meeting was listed in the Public Meeting Feedback System under Meeting Code 20230430 and as of the date of this memo, there were no feedback responses submitted.

Docket Nos.: 50-338, 339 and 50-280, 281 License Nos.: NPF-4, NPF-7 and DPR-32, DPR-37 CONTACT: Adam A. Wilson, RII/Division Reactor Projects (DRP) 404-997-4574

ML23151A547 OFFICE RII:DRP RII:DRP NAME A.Wilson M.Fannon DATE 06/01/2023 06/01/2023