December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2
ML23345A109
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 12/14/2023
From: Geoffrey Miller
Plant Licensing Branch II
To:
Virginia Electric & Power Co (VEPCO)
Miller G
Shared Package
ML23345A110 List:
References
EPID L-2022-LLA-0166
Download: ML23345A109 (1)


Text

December 14, 2023 LICENSEE: Virginia Electric and Power Company FACILITIES: North Anna Power Station, Unit Nos. 1 and 2 Surry Power Station, Unit Nos. 1 and 2

SUBJECT:

SUMMARY

OF DECEMBER 7, 2023, PUBLIC MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY CONCERNING A LICENSE AMENDMENT REQUEST TO REVISE EMERGENCY PLAN STAFF AUGMENTATION TIMES (EPID L-2022-LLA-0166)

On December 7, 2023, an observation public meeting1 was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Virginia Electric and Power Company (the licensee, VEPCO) via video conference. The purpose of the public meeting was to discuss the license amendment request2 (LAR) for North Anna Power Station, Unit Nos. 1 and 2 (North Anna), and Surry Power Station, Unit Nos. 1 and 2 (Surry), that would revise Emergency Plan staff augmentation times (previously supplemented on March 30, 20233). Specifically, the meeting was to discuss a licensee response to NRC staff questions that VEPCO submitted October 12, 2023.4 In its presentation,5 the NRC staff indicated that there continued to be information needs for the NRC to complete its review regarding second round RAIs 1 and 3. During the discussion, the NRC staff noted an error in the slides in that they incorrectly referenced RIS 2006-10, when it should have been 2016-10.

For RAI 1, the NRC staff stated that it was still not apparent that VEPCO had an on-shift individual that could relieve the Operations Shift Manager of the collateral duties of the Station Emergency Manager at 60 minutes. Following discussion of RAI 1, VEPCO staff indicated that they felt they understood the clarification necessary.

For RAI 3, the NRC staff stated that justification for extending Repair Team activities to 90 minutes was still not sufficient and that a significant amount of technical analysis would likely be required to justify the acceptability of this proposed change. VEPCO staff indicated that they understood the NRC staff concern.

In closing, VEPCO representatives indicated that they would take the information from the meeting and consider the options to reconcile the issues and concerns.

1 The meeting notice and agenda are available in the ADAMS under Accession No. ML23331A827.

2 The License Amendment Request (LAR) dated November 7, 2022, is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML22312A550.

3 The supplemental information dated March 30, 2023, is available in ADAMS under Accession No. ML23089A354.

4 The supplemental information dated October 12, 2023, is available in ADAMS under Accession No. ML23285A066.

5 The NRC staff presentation slides are available in ADAMS under Accession No ML23338A152.

No regulatory decisions were made during the meeting.

A list of attendees is provided as an enclosure. A public comment was received from a representative of the Nuclear Energy Institute that discussed some historical difficulties encountered in generic approaches.

Please direct any inquiries regarding this meeting to Ed Miller at 301-415-2481 or Ed.Miller@nrc.gov.

Sincerely,

/RA/

G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, and 50-339

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES DEC 7, 2023, MEETING WITH VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 SURRY POWER STATION NOS. 1 AND 2 LICENSE AMENDMENT REQUEST EMERGENCY PREPAREDNESS STAFF AUGMENTATION TIMES Name Organization Ed Miller U.S. Nuclear Regulatory Commission (NRC)

Mike Waters NRC Mike Norris NRC Mike Markley NRC John Lamb NRC Nick DiFrancesco NRC Jeffrey Herrera NRC Craig Sly Virginia Electric and Power Company (VEPCO)

Ed Collins VEPCO Ashleigh Burish VEPCO Bret Rickert VEPCO Katherine VanSchooneveld VEPCO Lindasy Mackey VEPCO Osama Bawab VEPCO Krista Longstone VEPCO Cathy Grady VEPCO Russell Savedge VEPCO Tyran Tharp VEPCO Monica Ray EC^2 David Yound Nuclear Energy Institute Michael Davis No Affiliation Given Adam Abrams No Affiliation Given Greg Hudson No Affiliation Given John Egdorf No Affiliation Given Enclosure

Package: ML23345A110 Meeting Notice: ML23331A827 Meeting Summary: ML23345A109 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NSIR/DPR/RLB/BC NAME GEMiller KGoldstein MMarkley NDiFrancesco DATE 12/11/2023 12/14/2023 12/12/2023 12/14/2023