| title = Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review (CAC No. Mf7492)
| title = Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review
| author name = Clark P M
| author name = Clark P
| author affiliation = NRC/NRR/DLR/RPB1
| author affiliation = NRC/NRR/DLR/RPB1
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 13: Line 13:
| document type = Audit Report, Letter
| document type = Audit Report, Letter
| page count = 108
| page count = 108
| project = CAC:MF7492
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2017 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.
Waterford 3 17265 River Road Killona, LA 70057-3093
==SUBJECT:==
AGING MANAGEMENT PROGRAMS AUDIT REPORT REGARDING WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF7492)
==Dear Mr. Chisum:==
By letter dated March 23, 2016, Entergy Operations, Inc. submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). On July 29, 2016, the staff completed the onsite audit of aging management programs. The audit report is enclosed.
If you have any questions, please contact me by telephone at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.
Sincerely,
                                                /RA/
Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382
==Enclosure:==
Audit Report cc: Listserv
==SUBJECT:==
AGING MANAGEMENT PROGRAMS AUDIT REPORT REGARDING WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF7492)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov
---------------
PClark SBloom DMorey BWittick AJohnson AGhosh, OGC DMcIntyre, OPA SBurnell, OPA AMoreno, OCA FRamirez, RIV CSpeer, RIV KKennedy, RIV jjarrel@entergy.com dfrey@entergy.com lmilste@entergy.com GYOUNG4@entergy.com Dlach@entergy.com ataylo1@entergy.com aharris@entergy.com ADAMS Accession Number: ML17054C529                        *Concurred via e-mail OFFICE LA:DLR                  PM:RPB1:DLR      BC:RARB:DLR BC:RASB:DLR NAME          *YEdmonds        PClark          DMorey        BWittick (BRoger for)
DATE          3/13/17          3/13/2017        4/28/2017    5/4/2017 OFFICE (A)BC:ESGB:DE          (A)BC:RPB1:DLR  PM:RPB1:DLR NAME          AJohnson        RChazell        PClark DATE          3/20/17          3/16/17          5/9/2017 OFFICIAL RECORD COPY
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION, DIVISION OF LICENSE RENEWAL Docket No:      50-382 License No:      NPF-38 Licensee:        Entergy Operations, Inc.
Facility:        Waterford Steam Electric Station, Unit 3 Location:        Killona, LA Dates:          July 11-July 15, 2016 July 25-July 29, 2016 Reviewers:      P. Clark, Project Manager, Division of License Renewal (DLR)
D. Morey, Branch Chief, DLR B. Wittick, Branch Chief, DLR A. Buford, Structural Engineer, DLR S. Cuadrado de Jesús, General Engineer, DLR W. Holston, Sr. Mechanical Engineer, DLR A. Wong, Sr. Project Manager, DLR Z. Bart Fu, Mechanical Engineer, DLR S. Min, Materials Engineer, DLR M. Yoo, General Engineer, DLR C. Doutt, Sr. Electrical Engineer, DLR J. Gavula, Mechanical Engineer, DLR B. Lehman, Materials Engineer, DLR J. López, Structural Engineer, DLR A. Mink, Mechanical Engineer, DLR D. Brittner, Mechanical Engineer, DLR A. Prinaris, Structural Engineer, DLR W. Gardner, General Scientist, DLR M. Sadollah, Electrical Engineer, DLR G. Thomas, Sr. Structural Engineer, DLR H. Akhavannik, Electrical Engineer, DLR A. Huynh, Materials Engineer, Division of Engineering J. Medoff, Sr. Mechanical Engineer, DLR S. Obadina, Mechanical Engineer, DLR B. Allik, Materials Engineer, DLR Enclosure
Approved By: Dennis Morey, Chief Aging Management of Reactor Systems Branch Division of License Renewal Brian Wittick, Chief Aging Management of Structures, Electrical, and Systems Branch Division of License Renewal Andrew Johnson, Acting Chief Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering
Introduction The U.S. Nuclear Regulatory Commission (NRC or the staff) conducted a 10-day audit onsite at the Waterford Steam Electric Station, Unit 3 (Waterford 3), nuclear power plant in Killona, Louisiana, from July 11, 2016, to July 29, 2016. Additional in-office document review was conducted before and after the onsite audit. The purpose of the audit was to examine Entergy Operations, Inc. (Entergy or the applicant), aging management programs (AMPs) and related documentation to verify the applicants claims of consistency with the corresponding AMPs in NUREG-1801, Generic Aging Lessons Learned (GALL) Report - Final Report, Revision 2, issued December 2010. As described in the GALL Report, the staff based its evaluation of the adequacy of each AMP on its review of the following 10 program elements in each AMP:
(1) scope of program; (2) preventive actions; (3) parameters monitored or inspected; (4) detection of aging effects; (5) monitoring and trending; (6) acceptance criteria; (7) corrective actions; (8) confirmation process; (9) administrative controls; and (10) operating experience.
Exceptions to the GALL Report AMP elements will be evaluated separately as part of the staffs review of the Waterford license renewal application (LRA) and documented in the staffs safety evaluation report (SER).
NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, (SRP-LR), Revision 2, issued December 2010, provides staff guidance for reviewing an LRA. The SRP-LR allows an applicant to reference in its LRA the AMPs described in the GALL Report. By referencing the GALL Report AMPs, the applicant concludes that its AMPs correspond to those AMPs reviewed and approved in the GALL Report and that no further staff review is required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicants determination should be documented in an auditable form and maintained onsite.
During the audit, the staff audited AMP elements 1 through 6 and 10 (scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and operating experience). These elements of the applicants AMPs were claimed to be consistent with the GALL Report and were audited against the related elements of the associated AMP described in the GALL Report, unless otherwise indicated in this audit report. Elements 7 through 9 (corrective actions, confirmation process, and administrative controls) were audited during the scoping and screening methodology audit conducted June 13, 2016, to June 16, 2016, and are evaluated separately.
The staff audited all AMPs that the applicant stated were consistent with the GALL Report AMPs.
During the audit, if the applicant took credit for a program in the GALL Report, the staff verified that the plant program contained all of the elements of the referenced GALL Report program. In addition, the staff verified that the conditions at the plant were bounded by the conditions for which the GALL Report program was evaluated.
In performing the audit, the staff examined the applicants LRA, program basis documents, and related references; interviewed various applicant representatives; and conducted walkdowns of several plant areas. In total, 41 AMPs were reviewed and 36 breakout (discussion) sessions with applicant representatives were conducted. This report documents the staffs activities during the audit.
LRA AMP B.1.1, Bolt Integrity Summary of Information in the Application. The LRA states that AMP B.1.1, Bolting Integrity, is an existing program with enhancements and an exception that will be consistent with the program elements in GALL Report AMP XI.M18, Bolting Integrity. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The exception and enhancements to the GALL Report AMP will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted a walkdown of the component cooling water (CCW) heat exchanger room B. The staff also conducted an independent search of the applicants operating experience database using keywords: bolt, preload, crack, leak, corrosion, molybdenum, MoS2, and disulfide.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                        Revision/Date
: 1. WF3-EP-14-00007        Aging Management Program Evaluation Results Non-Class 1  Revision 0 Mechanical
: 2. EN-MA-145              Maintenance Standard for Torque Applications            Revision 5
: 3. UNT-006-032            Coating and Corrosion Program                            Revision 0
: 4. EN-DC-150              Condition Monitoring of Maintenance Rule Structures      Revision 7
: 5. CR-WF3-2015-00947      Condition Report                                        02/19/2015
: 6. N/A                    Response to WF3 Action Item #16                          07/08/2014
: 7. N/A                    Response to WF3 Action Item #70                          07/09/2014
: 8. EN-DC-150              Condition Monitoring of Maintenance Rule Structures      Revision 7
: 9. EN-DC-178              System Walkdowns                                        Revision 7
: 10. SEP-RR-WF3-001        ASME Section XI Repair/Replacement Program              Revision 0
: 11. EN-LI-102              Corrective Action Program                                Revision 24
: 12. CEP-PT-001            ASME Section XI Pressure Testing Program                Revision 306
: 13. CEP-NDE-0901          VT-1 Visual Examination (ASME XI)                        Revision 4
: 14. CEP-NDE-0902          VT-2 Visual Examination (ASME XI)                        Revision 7
: 15. CEP-NDE-0903          VT-3 Visual Examination (ASME XI)                        Revision 5
: 16. WF3-EP-14-00003        Operating Experience Review Results - Aging Management  Revision 0 Program Effectiveness
: 17. CR-WF3-2015-01853      Condition Report                                        03/30/2015
: 18. WO-410215              RFRMVAAA105-A Flange Bolts Replacement (2015-1853)      04/07/2015
: 19. WO-368658              RFRMCHL0001-A Inspect/Leak Check Chiller Piping          06/24/2015
: 20. CR-WF3-2015-01852      Condition Report                                        03/30/2015
Document                                    Title                          Revision/Date
: 21. WO-410214              RFRMCHL0001-A Flange Bolting Replacement (2015-1852)    04/07/2015
: 22. CR-WF3-2015-09705      Condition Report                                        12/30/2015
: 23. CR-WF3-2015-09704      Condition Report                                        12/30/2015 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that aspects of the detection of aging effects program element, not associated with the exception, are not consistent with the corresponding program element in the GALL Report AMP. The staffs evaluation of aspects of the program element associated with the exception will be addressed in the SER. In addition, the staff found that for the detection of aging effects program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing a request for additional information (RAI) for the subject discussed below.
* The LRA AMP states an enhancement to the scope of program program element. The enhancement states that the Bolting Integrity Program procedures will be revised to include submerged pressure-retaining bolting. The GALL Report AMP XI.M18 detection of aging effects program element recommends periodic inspections (at least once per refueling cycle) of closure bolting for signs of leakage to ensure the detection of age-related degradation due to loss of material and loss of preload. During its onsite review of the LRA and program basis documents, the staff noted that the applicants program lacked information regarding how inspections of the submerged bolting will be performed to detect the applicable aging effects. The staff notes that a submerged environment limits the ability to perform inspections and detect leakage of submerged bolted connections; therefore, it is not clear how the submerged closure bolting will be inspected such that loss of material and loss of preload can be detected prior to loss of intended function consistent with the GALL Report AMP detection of aging effects program element.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The staff also determined that the operating experience provided by the applicant and identified by the staffs independent database search is not sufficient to allow the staff to verify that the LRA AMP, as implemented by the applicant, is sufficient to detect and manage the effects of aging. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing an RAI for the subject discussed below.
* The GALL Report AMP XI.M18 states that molybdenum disulfide (MoS2) should not be used as a lubricant because of its potential contribution to stress corrosion cracking (SCC), especially for high-strength bolts. The GALL Report AMP XI.M18 states that preventive actions include the proper selection of bolting material and the use of lubricants and sealants consistent with the guidance in Electric Power Research Institute
(EPRI) NP-5769 and NUREG-1339 to prevent or mitigate degradation and failure of safety-related bolting. The GALL Report also states that the applicant is to evaluate applicable operating experience to support the conclusion that the effects of aging are adequately managed. The LRA states that the Bolting Integrity Program includes preventive actions to restrict the use of lubricants containing MoS2. The LRA AMP also states that applicable industry standards and guidance documents, including NUREG-1339, EPRI NP-5769, and EPRI TR-104213, were used to develop the program implementing procedures. During its onsite audit, the staff performed a database search of Waterford 3 operating experience and found no results for the keywords molybdenum, disulfide, and MoS2 associated with the installation of closure bolts.
The staff also reviewed plant procedures and confirmed that the bolting procedures had been revised to prohibit the use of MoS2; however, it is not clear whether MoS2 lubricants were used at Waterford 3 before plant procedures were revised to prohibit their use. The staff needs additional information on whether MoS2 lubricants were used at Waterford 3; and, if so, how the Bolting Integrity Program will manage the age-related degradation of closure bolts lubricated with MoS2. The staff also noted that this is a common issue across B.1.1 Bolting Integrity, and B.1.16 Inservice Inspection - IWF AMPs.
The staff also audited the description of the LRA AMP provided in the final safety analysis report (FSAR) supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M18. The staffs evaluation of aspects of the detection of aging effects program element associated with exceptions will be addressed in the SER. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.2, Boric Acid Corrosion Summary of Information in the Application. The LRA states that AMP B.1.2, Boric Acid Corrosion, is an existing program that is consistent with the program elements in GALL Report AMP XI.M10, Boric Acid Corrosion. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: boric, corr, encrust, and residue.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. WF3-EP-14-00002      Operating Experience Review Results - Aging Effects        Revision 0 Requiring Management
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness, Section 3.1.2 Boric Acid Corrosion
: 3. WF3-EP-14-00007      AMP Evaluation Results - Non-Class 1 Mechanical,            Revision 1 Section 4.2 Boric Acid Corrosion
: 4. EN-DC-319            Boric Acid Corrosion Control Program                        Revision 10
: 5. SEP-BAC-WF3-001      Boric Acid Corrosion Control, Program Section              Revision 1
: 6. CEP-CAC-001          Boric Acid Corrosion Control, Program Plan                  Revision 1
: 7. Program Health Report BACCP - Boric Acid Corrosion Control Program                Q2-2015
: 8. Program Health Report BACCP - Boric Acid Corrosion Control Program                Q4-2015
: 9. CR-WF3-2013-05809    The monthly performance indicator for externally identified N/A Condition Reports (CR) was red for November 2013.
: 10. CR-WF3-2014-02771    Active leak on RC-301A. Repeat from CR-WF3-2013-00166      N/A
: 11. CR-WF3-2014-06493    White Boric Acid Not an Active Leak                        N/A
: 12. CR-WF3-2015-00228    White Boric Acid Not an Active Leak                        N/A
: 13. CR-WF3-2015-00280    Dry White Boric Acid on HPSI Pump Casing                    N/A During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.
The staff also audited the description of the AMP provided in the FSAR supplement in LRA Section A.1.2. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M10. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.3, Buried and Underground Piping and Tanks Inspection Summary of Information in the Application. The LRA states that AMP B.1.3, Buried and Underground Piping and Tanks Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.M41, Buried and Underground Piping and Tanks, as modified by LR-ISG-2011-03, Changes to the GALL Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document, cathodic protection survey results, coating and backfill specifications, qualifications of coating inspectors, inspection reports, and a review of plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: buried, coat, concrete, crack, wrap, wall loss, vault, underground, through wall, piping, min wall, microbiologic, loss of material, holiday, flaw, excavat, and leak.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                        Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results Non-Class 1      Revision 0 Mechanical Systems
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
: 3. WF3-ME-14-00009      Aging Management Review of the Component Cooling and        Revision 1 Auxiliary Component Cooling Water Systems
: 4. NUC2013155.00        Concrete Evaluation Conducted in Excavations #1 and #2      Revision 0, Conducted on 12/05/2013                                      01/16/2014
: 5. LM-0311              Qualification Card for Coating Inspectors Meeting Coating QC 06/29/2016 Inspector Level 3 (Fleet Curriculum)
: 6. EN-QV-111            Training and Certification of Inspection/Verification and    Revision 16 Examination Personnel
: 7. CP 3-2016 8287E      Cathodic Protection System Survey Underground Piping and    March 2016 Cathodic Protection    Grounding Waterford 3 Site CCC Job No. 8287E Survey
: 8. CR-WF3-2013-06121    Cathodic Protection Availability and Rectifier Modification  12/20/2013
: 9. Work Order          CP ECTR14243-TRANSF PERFORM FUNCTIONAL                      02/03/2016 52657334 01            TEST/ME-004-431
: 10. Work Order          CP ECTR14243-TRANSF PERFORM FUNCTIONAL                      04/21/2016 52665515 01            TEST/ME-004-431
: 11. Work Order          CP ECTR14243-TRANSF PERFORM FUNCTIONAL                      07/20/2016 52682189 01            TEST/ME-004-431
Document                                          Title                        Revision/Date
: 12. WF3 Piping            Ebasco Specification Station Piping, Hangers and Supports Revision 8, Specification 1564.100                                                              06/21/1995 During the audit of program elements 1 through 7, the staff could not verify that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the Buried and Underground Piping and Tanks Inspection program will be consistent with the program elements in GALL Report AMP XI.M41 as modified by LR-ISG-2011-03. However, on February 4, 2016, the staff issued the final version of LR-ISG-2015-01, Changes to Buried and Underground Piping and Tank Recommendations, which replaces AMP XI.M41 issued in LR-ISG-2011-03. The staff will consider issuing an RAI to compare the Buried and Underground Piping and Tanks Inspection program to AMP XI.M41 issued in LR-ISG-2015-01.
During the audit, the staff made the following observations:
* The staff reviewed WF3-ME-14-00009 and noted that concrete pipe in contact with soil has embedded steel reinforcement. During a breakout session, the staff noted that reinforced concrete, or cementitious material, has cathodic protection listed as a preventive action in LR-ISG-2015-01 but not in LR-ISG-2011-03.
* The staff reviewed NUC2013155.00 and noted that during an inspection and assessment of the exterior of buried pipe encased in concrete, a feeler gage was used to determine the depth of a crack and that the crack did not penetrate to the surface of the pipe. This is consistent with the recommendations of LR-ISG-2015-01, which states that cracks in controlled low-strength material backfill that could admit groundwater to the surface of the component are not acceptable.
* The staff reviewed LM-0311 and noted that coating inspectors are qualified to Coating QC Inspector Level 3. During a breakout session, the staff asked how this qualification is consistent with the recommendations in LR-ISG-2015-01 regarding the qualifications of individuals evaluating the extent of coating degradation. In response, the applicant provided EN-QV-111, which provided training and certification of inspection/verification and examination personnel. The staff reviewed EN-QV-111 and noted that individuals performing coating inspections are qualified in accordance with ANSI/ASME N.45.2.6-1978 Level III. The staff noted during a breakout session that this standard is not consistent with the recommendations in LR-ISG-2015-01 for individuals evaluating the extent of coating degradation.
* The staff reviewed CP 3-2016 8287E Cathodic Protection Survey and noted that a 100 mV polarization acceptance criteria was used because of the dissimilar metals in the system. During a breakout session, the staff noted that the use of a 100 mV polarization with dissimilar (i.e., mixed-metal) environments is not consistent with the recommendations in LR-ISG-2015-01.
* During its review of plant-specific operating experience, the staff reviewed CR-WF3-2013-06121. The staff noted that during the 5-year period from January 2009 to January 2014, the system had been out of service for 43 of 60 months, which represents a system availability of 28 percent. The staff noted that this is not consistent
with the recommendations of LR-ISG-2015-01, which recommends an availability of 85 percent for an effective cathodic protection system. In addition, the staff noted that breaks in a buried cable that provided DC current from the rectifier to the anode bed were the apparent cause. Furthermore, the staff noted that a modification was completed in June 2014, to move the rectifier closer to the anode bed to reduce the frequency of breaks in the power supply cable.
* The staff reviewed CP ECTR14243-Trans. Performance Functional Test/ME-004-431, which performed a test of the rectifier input current and rectifier voltage output every 3 months during 2016. The staff noted that rectifier input current and rectifier voltage output met acceptance criteria for all three work orders.
* The staff reviewed WF3 Piping Specification 1564.100 and noted that all ferrous buried piping under reinforced concrete slabs and within 50 feet of reinforced concrete slabs or concrete circulating water lines was encased in a cement-sand mortar envelope (i.e., controlled low-strength material). In addition, the staff noted that ferrous piping 50 feet or more away from reinforced concrete slabs or concrete circulating water lines was coated with coal tar enamel.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. The staff will consider issuing an RAI requesting that the applicant compare the Buried and Underground Piping and Tanks Inspection FSAR supplement to the FSAR summary description issued in LR-ISG-2015-01.
Audit Results. Based on this audit, the staff noted that the Buried and Underground Piping and Tanks Inspection program has not been evaluated against the changes to AMP XI.M41 that were issued in LR-ISG-2015-01. Therefore, the staff has identified certain aspects of the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.4, Coating Integrity Summary of Information in the Application. The LRA states that AMP B.1.4, Coating Integrity, is a new program with an exception that will be consistent with the program elements in GALL Report AMP XI.M42, Internal Coatings/Linings for In-scope Piping, Piping Components, Heat Exchangers, and Tanks, as described in LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks. To verify this claim of consistency, the staff audited the LRA
AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and plant-specific operating experience.
Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an exception associated with this AMP. The exception to the GALL Report AMP is evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: blister, block, clog, coat, delamin, flak, foul, holiday, lined, lining, peel, and perforat.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                            Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results Non-Class 1        Revision 0 Mechanical, Coating Integrity
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management        Revision 0 Program Effectiveness, Section 3.2.2, Coating Integrity
: 3. WF3-ME-14-00030      License Renewal Topical Report on Coating Integrity            Revision 0
: 4. 1564-3279            Turbine Cooling Water Surge Tank                              Revision 0
: 5. CR-WF3-2009-          Diesel Fire Pump B - Potential Coating Debris Inside of Heater 11/09/2009 06452                    Causing Flow Blockage The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the new program as modified by the proposed exception.
During the audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the detection of aging effects program element not associated with the exception identified in the LRA are consistent with the corresponding program element in the GALL Report AMP. The staffs evaluation of aspects of this program element associated with the exception will be addressed in the SER. In addition, the staff found that for the scope of program, program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The scope of program program element of the LRA AMP states that coatings that are within the scope of the program are those that are applied to the internal surfaces of in-scope components where loss of coating or lining integrity could impact the components and downstream components current licensing basis (CLB) intended function(s). The GALL Report AMP recommends that coatings are within the scope of the AMP where loss of coating or lining integrity could prevent satisfactory
accomplishment of any of the components or downstream components CLB intended functions identified under 10 CFR 54.4(a)(1), (a)(2), or (a)(3). It is not clear to the staff that these statements are consistent because the term and implies that both the components intended function and a downstream components intended function must be impacted by loss of coating integrity for the coating to be within the scope of the program. AMP XI.M42 recommends that the criteria for inclusion are either of the impacts. This issue also impacts the LRA FSAR description of the Coating Integrity Program.
* During its review of plant-specific operating experience, the staff reviewed CR-WF3-2009-06452. This condition report documents that the internal surfaces of the fire pump diesel jacket water cooling heater might be coated. The LRA Table 2s do not cite this component.
In order to verify that the exception will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.
* The LRA AMP states an exception to the detection of aging effects program element.
The exception states that the program will provide a one-time inspection of the internal coating for the 11-foot diameter carbon steel circulating water piping. The exception does not state that periodic inspections will be subsequently conducted if the one-time inspection results do not meet acceptance criteria.
During the audit, the staff made the following observations:
* The staff reviewed WF3-ME-14-00030 and confirmed that the applicant identified six tanks that are internally lined; however, the tanks have not been included within the scope of the Coating Integrity Program. The staff noted that all of the tanks are within the scope of license renewal because they have an intended function per 10 CFR 54.4(1)(2). The document states that downstream aging effects will not occur because either coating debris would be captured by resin or resin retention elements, or pass through to other nonsafety-related components or the river. The basis for not including these tanks is as follows: (a) with the exception of the supplemental chilled water expansion tank and turbine cooling water surge tank, there are no safety-related components within the vicinity of the tanks that could be impacted should the tank leak; and (b) there are no downstream effects on safety-related equipment.
* WF3-ME-14-00030 states that the essential chilled water expansion tanks are the only safety-related component located in the vicinity of the supplemental chilled water expansion tank. The supplemental chilled water expansion tank is at atmospheric pressure.
* WF3-ME-14-00030 states that the turbine cooling water surge tank is located in the CCW surge tank room with the safety-related CCW surge tank. The turbine cooling water surge tank is at atmospheric pressure. The staff reviewed drawing 1564-3279 and confirmed that the tank is approximately 7 feet tall.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The applicant stated that the Coating Integrity Program is a new program and plant operating experience will be obtained as it is implemented. The staff
noted that AMP XI.M42, the basis for the Coating Integrity Program, was based on industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. With the exception of the issue identified in the scope of program program element, above, the staff verified this description is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2013-01.
Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M42. The staff also verified that for the detection of aging effects program element, the aspects of the LRA AMP program element not associated with the exception are consistent with the corresponding program element in GALL Report AMP XI.M42.
The staffs evaluation of aspects of the program elements associated with exceptions will be addressed in the SER. The staff also identified certain aspects of the scope of program and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.5, Compressed Air Monitoring Summary of Information in the Application. The LRA states that AMP B.1.5, Compressed Air Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M24, Compressed Air Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Reactor auxiliary building, the Cooling Tower Area, and the Turbine Generator Building. The staff also conducted an independent search of the applicants operating experience database using keywords: instrument air, compressed air, GL 88-14, INPO SOER 88-01, air samples, dew point, particulates, corrosion products, contaminants, and leaks.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                            Revision/Date
: 1. WF3 Response to      Waterford 3 SES Docket No. 50-382 License No. NPF-38 Generic 02/21/1989 GL 88-14                Letter [GL] 88-14
: 2. WF3-ME-14-00013      Aging Management Review of the Air System                    Revision 0, 04/10/2015
Document                                      Title                                Revision/Date
: 3. WF3-EP-14-00007    Aging Management Program Evaluation Results Non-Class 1              Revision 0, Mechanical Compressed Air Monitoring                                01/0/2016
: 4. TRM                Waterford 3 Technical Requirements Manual (TRM)                      Amendment 91
: 5. Entergy Operations Compressed Air Systems Design Basis Document                        November 1995 Inc., Waterford SES Unit No. 3
: 6. CE-002-032        Maintaining Instrument Air System                                    Revision 305, 11/03/2014
: 7. MM-006-034        Station and Instrument Air Compressor Maintenance                    Revision 305, 04/11/2012
: 8. CE-001-004        Periodic Analysis and Scheduling Program                            Revision 315, 02/05/2015
: 9. Work Order - IA    Replace Inlet and Discharge Air Filters                              Completed MCMP0001 A                                                                                08/25/2014
: 10. Work Order - IA  Replace Desiccant Absorber                                          Completed MTWR0001 C&D                                                                              09/15/2015
: 11. Work Order - IA  Remove and Clean Separator Y-Strainer                                Completed MCMP0001 A                                                                                02/26/2015
: 12. Work Order - IA  Lube Compressor Bearings, Purge Coupling                            Completed MCMP0001 A                                                                                02/05/2015
: 13. CR-WF3-2014-      A small leak was discovered on the Emergency Diesel Generator        05/11/2014 01061                (EDG) A starting air system tube fitting near the Air Dryer AZ Repressuring Valve.
: 14. CR-WF3-2014-      Packing gland leakage was found at Instrument Air Valve to          04/29/2014 02354                Nitrogen ACC-4 Header; leakage is outside the pressure testing boundary and acceptable per CEP-NDE-0902.
: 15. CR-WF3-2014-      Recommendation 4 in INPO SOER 88-01 Instrument Air System            01/03/2014 00021                Failures (dated June 3, 1988) was revised to require the use of most current instrument air quality standards.
: 16. CR-WF3-2013-      A small air leak was discovered between fittings on the airline      05/13/2013 02375                downstream of IA-5277 (IA Isolation to FW-173B Isol to VLV FW-173B).
: 17. CR-WF3-2013-      Control Room received IA Dryer B Trouble Alarm multiple times        05/07/2013 02290                during the day due to Hi Dew Point. One of the IA Dryer Skid B prefilter drain traps was found half full of water.
: 18. CR-WF3-2012-      SOER 88-01 Evaluation Guideline states to measure any                03/02/2012 01091                particulates absolute > 40 µm. This should be included in procedure CE-002-032 Maintaining Instrument Air System (Revision 302, dated 3/1/2011) so it is clear how the vendor measures and categorizes particulate sizes.
: 19. CR-WF3-2011-      An instrument air leak on the pneumatic air filter was discovered    09/06/2011 026276                inside the shroud of FW MVAAA184-A.
: 20. CR-WF3-2010-      No actions or programs specific to the instrument air or station air 08/11/2010 04899                compressors area to prevent corrosive or hazardous gases from entering into the air systems, as stated in the special consideration section of SOER 88-01 Evaluation that requires the instrument air be free of corrosive and hazardous gases.
Document                                          Title                            Revision/Date
: 21. CR-WF3-2006-          A small air leak was discovered upstream of the manual isolation 03/06/2006 00666                    for the air regulator but downstream of IA-5701 (maintenance air for the A EDG) next to the regulator.
: 22. ISTEP                Integrated System Trending and Evaluation Program                07/13/2016 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit, the staff made the following observations:
* For the preventive actions program element, the staff noted that the GALL Report recommends that moisture and other corrosive contaminants in the systems air are maintained below specified limits to ensure that the system and components maintain their intended functions. In addition, the staff noted that the applicant followed procedure CE-002-032 (Revision 305, 11-03-2014, section 10.1) to analyze air samples for particulates, dew point, and hydrocarbon using acceptance criteria from (ANSI)/ISA-7.0.01-1996, Quality Standard for Instrument Air, a guidance document referenced in the GALL Report.
* For the detection of aging effects program element, the staff noted that the GALL Report recommends that the typical compressed air systems are equipped with in-line dew point instrumentation that either checks continuously using an automatic alarm system or is checked at least daily to ensure that moisture content is within specifications. The staff noted that the applicant documented an incidence in which the Control Room had received high dew point alarms for the Instrument Air (IA) Dryer B (CR-WF3-2013-02290). Water was found in the IA Dryer Skid B prefilter drain traps.
Additionally, the GALL Report recommends periodic visual inspections of critical component internal surfaces (compressor, dryers, aftercoolers, and filters) to ensure no loss of material due to corrosion. The staff also noted that the applicant routinely maintained the air systems. For example, the instrument air inlet and outlet filters are replaced annually (e.g., Work Order - IA MCMP0001 A, 08-25-2014). The instrument air compressors are maintained, inspected, and/or replaced based on performance under procedure MM-006-034 (Revision 305, 04-11-2012).
* For the monitoring and trending program element, the staff noted that the GALL Report recommends air quality analysis results should be reviewed to determine if alert levels or limits have been reached or exceeded. The staff noted that the applicant relied on computerized tools (e.g., Integrated System Trending and Evaluation Program) to monitor and trend plant systems (e.g., instrument air system) performance.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M24. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.6, Containment Inservice Inspection - IWE Summary of Information in the Application. The LRA states that AMP B.1.6, Containment Inservice Inspection - IWE, is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.S1, ASME Section XI, Subsection IWE.
To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an enhancement associated with this AMP. The enhancement to the LRA AMP is evaluated in the SER. The LRA states that the Waterford 3 containment is a free-standing steel containment vessel (SCV) consisting of a vertical upright cylinder with a hemispherical dome and an ellipsoidal bottom encased in concrete and founded on the common concrete foundation with the Shield Building.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, since the plant was in power operation and a walkdown to observe the condition of the steel containment was not possible, the staff reviewed limited available photographs of the Waterford 3 SCV. The staff also conducted an independent search of the applicants operating experience database using keywords:
bellows, bolt, corros, coat, degrad, loss of material, containment, and moisture barrier.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                            Revision/Date
: 1. WF3-EP-14-00008      Aging Management Program Evaluation Report (AMPER)            Revision 1 Civil/Structural: B.1.6 Containment Inservice Inspection - IWE Program Book
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management        Revision 0, Program Effectiveness                                          11/30/2015
: 3. WF3-EP-14-00002      Operating Experience Review Results - Aging Effects Requiring  Revision 0, Management (AERM)                                              9/13/2015
: 3. SEP-CISI-104        Program Section for ASME Section XI, Division 1, WF3          Revision 1, Containment Inservice Inspection Program                      10/22/2012
Document                                      Title                                Revision/Date
: 4. CEP-CII-003      General Visual Examinations of Class MC Components                  Revision 304, 10/04/2012
: 5. CEP-NDE-0903    VT-3 Examination (ASME Section XI)                                  Revision 5, 07/29/2009
: 6. CEP-NDE-0112    Certification of Visual Examination Personnel                        Revision 9, 11/19/2013
: 7. EN-MA-145        Nuclear Management Manual: Maintenance Standard for Torque          Revision 3, Applications                                                        04/25/2014
: 8. EN-LI-102        Nuclear Management Manual: Corrective Action Program                Revision 24, 09/05/2014
: 9. EN-DC-141        Nuclear Management Manual: Design Inputs                            Revision 15, 09/05/2014
: 10. WF3-CS-14-00001 Aging Management Review of the Reactor Building                      Revision 1, 06/30/2014
: 11. W3F1-92-0473    Memo to File: NRC Information Notice 92-20, Inadequate Local        12/22/1992 Leak Rate Testing
: 12. CEP-RR-001      ASME Section XI, Repair/Replacement Program (fleet-wide)            Revision 311, 01/11/2016
: 13. SEP-RR-WF3-001  Waterford 3 ASME Section XI, Repair/Replacement Program              Revision 0, 03/07/2012
: 14. CR-WF3-2000-    Condition Report to evaluate VT-3 examination findings of            10/20/2000 01275              containment vessel interior moisture barrier failure at 22 locations
: 15. CR-WF3-2000-    Condition Report to evaluate VT-3 examination findings of            10/20/2000 01279              containment vessel exterior moisture barrier failure at 20 locations
: 16. CR-WF3-2000-    Condition Report to evaluate visual examination findings of          10/28/2000 01375              containment vessel performed as part of corrective actions [for CR-WF3-2000-01275] revealed corrosion [below annulus moisture barrier] of a greater extent than anticipated
: 17. CR-WF3-2002-    Condition Report to evaluate moisture barrier seal damage in two    03/26/2002 00508              places inside containment
: 18. CR-WF3-2003-    Condition Report on VT-3 examination findings of flaking, peeling,  10/24/2003 03082              blistering, and discoloration of coatings on containment vessel interior
: 19. CR-WF3-2003-    Condition Report on VT-3 examination findings of flaking, peeling,  10/27/2003 03142              blistering, and discoloration of coatings on containment vessel interior
: 20. CR-WF3-2003-    Condition Report to track and trend the findings of the inspection  11/05/2003 03425              of containment vessel surfaces during Refuel 12
: 21. CR-WF3-2008-    Condition Report to evaluate VT-3 inspection findings of            05/01/2008 01858              containment inner moisture barrier damage at six locations
: 22. CR-WF3-2012-    Condition Report to determine extent of condition of SGT NCR        10/19/2012 05353              1082 on conditions related to the annulus moisture barrier
: 23. CR-WF3-2012-    Condition Report to determine extent of condition and repair SGT    12/22/2012 07654              NCR 1175 on conditions related to the annulus moisture barrier
: 24. ISI-VT-12-071  Visual Examination of IWE Surfaces (General) [RF-18-IWE to          05/08/2014 through -99        Procedure CEP-CII-003 Revision 304]
Document                                          Title                          Revision/Date
: 25. ISI-VT-14-027        Visual Examination of Pressure Retaining Bolting (VT-3)      04/19/2014 thru -064                [RF-19-IWE to Procedure CEP-NDE-0903 Revision 005]
: 26. ISI-VT-15-040        Visual Examination of IWE Surfaces (General) [RF-20-IWE to    11/13/2015 through -054              Procedure CEP-CII-003 Revision 305]
: 27. ISI-VT-09-030        Visual Examination of IWE Surfaces (General) [RF-16-IWE to    10/31/2009 Procedure CEP-NDE-0903 Revision 005]
: 28. CR-WF3-2014-          Condition Report to document issuance of NRC IN 2014-07 and  05/27/2014 03076                    to determine the WF3 impact of it
: 29. LOU-156 G-175,        Drawing Reactor Containment Building Piping Penetrations      Revision 18, Sheet 1 of 3                                                                            08/06/1997
: 30. LOU-156 G-175,        Drawing Reactor Containment Building Piping Penetrations      Revision 19, Sheet 1 of 3                                                                            12/20/1995
: 31. LOU-156 G-175,        Drawing Reactor Containment Building Piping Penetrations      Revision 15, Sheet 1 of 3                                                                            02/08/1996
: 32. NDE-2000-298          Thickness Readings Adjacent to Corrosion Pits Above Moisture  11/02/2000 Barrier in the Annulus (5 places)
: 33. NDE-2000-434          Area #15 - Thickness Readings Taken on Annulus Side Liner    11/04/2000 Plate in Knuckle Region
: 34. NDE-2000-484          Inner Moisture Barrier Reinspection of 22 Areas Identified in 11/07/2000 CR-2000-1275 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.
During the audit, the staff verified that the scope of program, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for preventive actions and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The preventive actions program element of GALL Report AMP XI.S1 states, in part:
The program is also augmented to require that the selection of bolting material installation torque or tension and the use of lubricants and sealants are in accordance with the guidelines of EPRI NP-5769, EPRI TR-104213, and the additional recommendations of NUREG-1339 to prevent or mitigate degradation and failure of structural bolting. The corresponding Section 3.2.B.2b of the LRA Aging Management Program Management Evaluation Report (AMPER) document states, in part: The program is a condition monitoring program and does not include guidance for the selection of bolting material, installation torque or tension, and use of lubricants and sealants. The program is supplemented by existing plant procedures to ensure that the selection of bolting material installation torque or tension, and the use of lubricants and sealants is appropriate for the intended purpose. These procedures use the guidance contained in NUREG-1339 and in EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of bolting material, lubricant, and installation torque. It was not
clear to the staff if the above statements are consistent because (1) it appears to be an enhancement to the LRAs existing code-based condition monitoring [only] program, and (2) there is an apparent lack of a procedural link between the AMP implementing procedures (e.g., SEP-CISI-104, SEP-RR-WF3-001) and the existing supplemental procedures being credited. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection - IWE, and B.1.16, Inservice Inspection - IWF.
* The preventive actions program element of GALL Report AMP XI.S1 states, in part: If the structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication Specification for Structural Joints Using ASTM A325 or A490 Bolts, need to be considered. The related enhancement to the LRA AMP preventive actions program element intended to achieve consistency states: Revise plant procedures to include the preventive actions for storage of ASTM A325, ASTM F1852 and A490 bolting from Section 2 of Research Council for Structural Connections (RCSC) publication, Specification for Structural Joints Using ASTM A325 or A490 Bolts. The staff also noted that the applicant excluded the use of preventive actions for lubricants and stress corrosion cracking potential by stating that a review of Section 2 of the RCSC publication concluded that the publication only addresses storage and does not address the preventive actions for lubricants and stress corrosion cracking potential for these bolts.
It was not clear to the staff if the above statements are consistent, and if the above enhancement is adequate to make the LRA AMP consistent, because (1) the enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and (2) the related justification provided in the AMPER document appears to interpret the standard in a manner that is inconsistent with the consideration in the GALL Report AMP. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection -
IWE; B.1.16, Inservice Inspection - IWF; and B.1.38, Structures Monitoring.
* The detection of aging effects program element of the GALL Report AMP X1.S1 recommends that the program be augmented to require surface examination, in addition to visual examination, to detect cracking in stainless steel penetration sleeves, bellows, dissimilar metal welds, and steel components that are subject to cyclic loading but have no CLB fatigue analysis. The GALL Report AMP also states that where feasible, appropriate Appendix J tests may be performed in lieu of surface examination. The corresponding program element in the LRA AMPER document states: Stainless steel penetration sleeves, dissimilar metal welds, bellows, and steel components that are subject to cyclic loading but have no CLB fatigue analysis are monitored for cracking.
Additionally, AMP X1.S4 Containment Leak Rate Program (10 CFR Part 50, Appendix J) tests may be performed in lieu of surface examination. Noting that visual examination may not detect fine cracks that could occur as a result of cyclic loading, and that the LRA AMP did not identify any enhancement to supplement the existing program and implementing procedures with the enhanced examination method capable of detecting cracking, it was not clear to the staff that these statements are consistent because the LRA AMP and implementing procedures do not clearly reflect whether surface examinations will be conducted, in addition to visual examination, to detect cracking, or if Appendix J testing will be performed instead; nor does it identify the specific components to which each detection method will be applied. If Appendix J testing will be performed,
the LRA does not specify the type of testing or explain why the testing is appropriate for timely detection of cracking.
During the audit, the staff made the following observations:
* The staff reviewed Nondestructive Evaluation (NDE) Reports of ultrasonic thickness (UT) and pit measurements of the SCV plate, in the knuckle region with observed corrosion indications, taken above and below the annulus moisture barrier in Area #15 that were evaluated as part of condition reports CR-WF3-2000-01279 and CR-WF3-2000-01375. The staff noted that the thickness readings in the examined areas varied from 2.261 inches to 2.367 inches, all of which were above the design thickness of 2.1875 inches in the knuckle region. The staff also noted that the pit depths varied from 0.031 inch to 0.109 inch, all of which were significantly smaller than 10 percent of the design metal plate thickness. Therefore, following UT measurements and determination that the corrosion mechanism was not active, the surface areas with corrosion noted in 2000 in the annulus moisture barrier area were accepted by examination.
* The staff reviewed CR-WF3-2014-03076, which dispositioned NRC Information Notice (IN) 2014-07 and confirmed that Waterford 3s containment metal shell is not designed with leak-chase channel systems related to the operating experience described in the IN.
* The staff reviewed Section 3.2.A.b of the AMPER document and noted that the technical evaluation of NRC IN 92-20 for applicability concluded that a valid Type B local leakage rate test (LLRT) of the Waterford 3 containment penetration bellows could be performed in accordance with the requirements of 10 CFR Part 50 Appendix J; therefore, the IN recommendation for augmented inspection of the bellows does not apply to the Waterford 3 program. The staff also reviewed memo W3F1-92-0473, which documented the review of IN 92-20, and confirmed that for the multi-ply bellows used on containment piping penetrations, a mesh wire cloth between the plies ensures a gap for adequate performance of a LLRT.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is generally bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion was identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants plant-specific operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The staff reviewed condition report CR-WF3-2000-01375, dated October 28, 2000, which documented corrective actions to address plant-specific operating experience of corrosion, with flaking noted on the SCV to a depth of at least 18 inches below the surface of the outer moisture barrier in the annulus region. This condition appeared to exist around the entire knuckle region of the containment vessel within the annulus and it is not addressed in LRA AMP B.1.6. CR-WF3-2000-01375 noted that this corrosion apparently was from initial construction (from exposure to the weather), was determined to be non-active unless reactivated by moisture, and ultrasonic wall thickness measurements showed that the containment vessel wall thickness exceeded the design
thickness of 2.1875 inches. Chemical analysis of scale samples indicated the presence of chlorides and sulfides. The presence of these chemicals also indicates the potential for an active corrosion mechanism to be initiated if any moisture were introduced.
Therefore, there exists the potential that the existing apparently non-active corrosion, with presence of traces of chlorides and sulfides, of the SCV in the knuckle area below the annulus moisture barrier may be reactivated by moisture and may potentially impact containment vessel intended function before or during the period of extended operation.
The staff also noted that, during refueling outage 18, a construction opening for steam generator replacement was made in the Shield Building by hydrodemolition, which could have resulted in intrusion of water into the annulus moisture barrier areas. The staff requires additional information to determine the need to verify, prior to entering the period of extended operation that the observed corrosion continues to remain non-active and whether the applicants plant-specific operating experience supports the sufficiency of the LRA AMP.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below.
* The information in the FSAR supplement description in LRA Section A.1.6 and the AMPER does not appear to provide an adequate summary description of the AMP because (1) it does not sufficiently summarize what the LRA AMP covers in terms of components, materials, environments, aging effects, and key condition monitoring actions; rather, a significant part of the supplement primarily repeats the structural configuration description of the SCV that is already in FSAR Section 3.8.2, and (2) the description does not provide information consistent with that for program XI.S1 in SRP-LR Table 3.0-1.
Audit Results. Based on this audit, the staff verified that the scope of program, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S1. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the preventive actions, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is generally bounded by the operating experience for which the GALL Report program was evaluated; however, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.7, Containment Leak Rate Summary of Information in the Application. The LRA states that AMP B.1.7, Containment Leak Rate, is an existing program that is consistent with the program elements in GALL Report
AMP XI.S4, 10 CFR Part 50, Appendix J. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: penetration, LLRT, Appendix J, and air lock.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                            Revision/Date
: 1. WF3-EP-14-00008      Aging Management Program Evaluation Results-Civil/Structural. Revision 1, Part: Containment Leak Rate Program                              12/03/2015
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management            Revision 0, Program Effectiveness                                            11/30/2015
: 3. EN-DC-334            Primary Containment Leakage Rate Testing (Appendix J)            Revision 3, 11/21/2013
: 4. EN-LI-102            Corrective Action Program                                        Revision 24, 09/05/2014
: 5. WF3-QA              Quality Assurance Program Manual                                  Revision 29, 12/01/2014
: 6. CEP-APJ-001          (Fleet) Primary Containment Leakage Rate Testing                  Revision 2, (10 CFR Part 50 Appendix J) Program Plan                          09/25/2013
: 7. SEP-APJ-005          (Plant Specific) Waterford 3: Primary Containment Leakage Rate    Revision 5, Testing (Appendix J) Program                                      05/30/2011
: 8. SEP-CISI-104        Program Section for ASME Section XI, Division 1                  Revision 1, WF3 Containment Inservice Inspection Program (including          10/22/2012 drawings IWE - 11, Reactor Containment Vessel Inspection Layout Inside Surface, and IWE - 12, Reactor Containment Vessel Inspection Layout Outside Surface)
: 9. WF3-CS-14-00001      WF3 License Renewal Project: Aging Management Review of          Revision 1, the Reactor Building                                              12/03/2015
: 10. CEP-CII-003        Visual Examination of Class MC Components                        Revision 305, 09/16/2015
: 11. CEP-NDE-0112        Certification of Visual Examination Personnel                    Revision 9, 11/19/2013
: 12. CEP-NDE-0100        Administration and Controls of NDE                                Revision 9, 07/29/2015
: 13. WF31-2015-0047      Request To Permanently Extend the ILRT to 15 years                06/18/2015 (10 CFR 50.90). Entergy Letter to NRC with Attachments 1, 2, and 3.
: 14. CR-WF3-2000-        Rework Moisture Barriers for Containment and Annulus (one of      11/06/2000 1275 (MAI 421737)      affected interior locations is immediately below penetration #21)
: 15. DWG-LOU-1564-      Piping Penetrations - Reactor Containment Building                Revision 3, G-175, Sheet 2/3                                                                          12/12/1995
: 16. ECR 0000018568      Penetration 102 - Appendix J Leakage Limits                      05/04/2011
Document                                        Title                              Revision/Date
: 17. CR 2011-02988        Penetration 102 - Exceeded LLRT Operational Limit                05/04/2011
: 18. DWG-LOU-1564        Electrical Penetrations - Penetration Locations, Louisiana Power Revision 0 B-316, Sheet 2A          and Light Co., Waterford S.E.S. Unit No. 3
: 20. WO-52465            WF3 2005 ILRT Summary                                            05/21/2005
: 21. CR-WF3-2012-        Hydrogen Analyzer Systems A&B - Missing LLRT                    12/27/2012 07775
: 22. CR-WF3-2014-        Penetration 132 - Identified cause of electrical LLRT failure,  04/27/2014 02275                    locknuts inside containment needed tightening
: 23. CR-WF3-2014-        Main Steam Line #1 - LLRT failure                                04/17/2014 01821 During the audit of program elements 1 through 6, the staff verified that the preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP B.1.7, Containment Leak Rate are consistent with the corresponding program elements of the GALL Report AMP XI.S4, 10 CFR Part 50, Appendix J. For the scope of program program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether the scope of program program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
* During the onsite review of Waterford 3 implementing procedure for the 10 CFR Part 50 Appendix J leakage rate testing, SEP-APJ-005, Primary Containment Leakage Rate Testing (Appendix J) Program, contained in the AMP Basis Document, the staff noted a certain number of containment pressure-retaining components (e.g., valves, penetrations) are not subjected to LLRT as required by the 10 CFR Part 50 Appendix J rule and the scope of program program element of GALL Report AMP XI.S4. The scope of program program element of AMP XI.S4 states, [t]he scope of the containment LRT program includes all containment boundary pressure-retaining components. It is not clear how the applicants Containment Leak Rate program is consistent with that of the GALL Report AMP XI.S4, for which consistency is claimed.
To resolve and clarify this inconsistency with the GALL Report AMP XI.S4 and the requirements of 10 CFR 54.21(a), the staff is considering issuing the noted RAI.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements of the GALL Report AMP XI.S4. The staff also identified certain aspects of the scope of program program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.8, Diesel Fuel Monitoring Summary of Information in the Application. The LRA states that AMP B.1.8, Diesel Fuel Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M30, Fuel Oil Chemistry. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fuel oil storage 7-day tanks, fuel oil feed tanks, fire water diesel tank, and the fuel oil auxiliary tank.
The staff also conducted an independent search of the applicants operating experience database using keywords: fuel oil, sample, tank(s), and diesel.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. G164-Sheet 3          Auxiliary Flow Diagram (Drawing)                            07/10/1978
: 2. C-9300193            Water Treatment Building and Fire Pump House (Drawing)      05/03/1991
: 3. G164 Sheet 1          Emergency Generator Diesel Oil System (Drawing)            12/10/1991
: 4. 15642527 R2          Diesel Oil Tank Bottom and Anchor Ring Layout (Drawing)    09/30/1996
: 5. 15642528 R1          Diesel Oil Tank Roof Details (Drawing)                      January 1979
: 6. 15642525 R4          Diesel Oil Storage Tank General Plan (Drawing)              06/01/2016
: 7. Unlabeled            Trending Data on EDG Fuel Oil Storage Tank (FOST)          07/12/2016
: 8. CE-002-030            Safety-Related Procedures (Maintaining Diesel Fuel Oil)    Revision 026
: 9. CE-001-004            Periodic Analysis Scheduling Program                        Revision 315
: 10. Work Order 23148    Drain and Clean Fuel Oil Storage Tank B                    02/28/2005
: 11. Work Order          Clean Diesel Fuel Oil Storage Tank B                        06/02/2016 00401851
: 12. Work Order          Clean Diesel Fuel Oil Storage Tank A                        03/08/2005 500010005
: 13. Work Order          Clean Diesel Fuel Oil Storage Tank B                        06/08/2016 00400699
: 14. Work Order          Clean Diesel Fuel Oil Day Tank A                            09/27/2010 00246844
: 15. Work Order          Clean Diesel Fuel Oil Day Tank B                            02/25/2013 00293713
Document                                          Title                      Revision/Date
: 16. Work Order          Auxiliary Boiler Fuel Oil Inspection                      02/27/2014 00362389
: 17. CR-WF3-2015-        Sample Results Show High Lubricity                        08/04/2015 05090
: 18. CR-WF3-2013-        EDFOST Elevated Particulate Results                      12/10/2013 05945
: 19. CR-WF3-2011-        FOST A/B Particulate Trending Upwards                    11/15/2011 07629
: 20. CR-WF3-2011-        EDFOST B Particulate 9.96mg/liter                        07/24/2011 05236
: 21. CR-WF3-2009-        API Gravity Sample from Fuel Truck                        10/14/2009 05410
: 22. CR-WF3-2006-        Gravity Results Received High                            05/09/2006 01410
: 23. CR-WF3-2006-        Gravity Results Are Above .865                            05/11/2006 01446
: 24. CR-WF3-2006-        Corrosion Identified to EDG Oil Storage Tank Valve        04/26/2006 01248
: 25. CR-WF3-2006-        Gravity for Diesel Fuel Oil Was Greater than .865        04/25/2006 01241
: 26. CR-WF3-2007-        Gravity from Fuel Truck Sample                            06/27/2007 02366
: 27. CR-WF3-2010-        Fuel Oil Particulate Results High at (Leake) Oil          08/18/2010 05048
: 28. WF3-EP          Aging Management Program Evaluation Results              Revision 0 00007                    Non-Class 1 Mechanical
: 29. WF3-EP          Operating Experience Review Results - Aging Management    Revision 0 00003                    Program Effectiveness The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit, the staff made the following observation:
* Section 4.4 of WF3-EP-14-00007 Non-Class 1 AMP Evaluation Report did not list one of two diesel fire pump tanks that was identified during the walkdown of the diesel tanks.
This gap was brought to the applicants attention and it was verified that tank DFOMTNK0001-B was in scope for license renewal. The applicant created condition report CR-WF3-2016-04497 to add this tank to the program basis document, which will ensure that the tank is subject to the recommendations of GALL Report AMP XI.M30, Fuel Oil Chemistry.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M30.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.9, Environmental Qualification (EQ) of Electric Components Summary of Information in the Application. The LRA states that AMP B.1.9, Environmental Qualification (EQ) of Electric Components Program, is an existing program that is consistent with the program elements in GALL Report AMP X.E1, Environmental Qualification (EQ) of Electric Components. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the electrical penetration area and the auxiliary building. The staff also conducted an independent search of the applicants operating experience database using the keywords: cable, jacket ,
arcing, thermal, connection, contamination, discoloration, swelling, insulation, and moisture.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. WF3-EP-14-00009          Aging Management Program Evaluation Results - Electrical Revision 1, 2/1/2016
: 2. WF3-EP-14-00003          Operating Experience Review Results - Aging Management  Revision 0, Program Effectiveness                                    11/30/2015
: 3. EN-DC-164                Environmental Qualification (EQ) Program                Revision 4, 11/21/2013
: 4. WF3-EP-14-00004          TLAA and Exemption Evaluation Results                    Revision 0, 2/5/2016
: 5. 7320-10003              Instrumentation and Control Electrical Penetration for  9/1/1988 Waterford Unit 3
: 6. Excel Spreadsheet - No  Cornerstone Rollup - Equipment Qualification 1Q10        04/14/2010 document identifier
Document                                      Title                        Revision/Date
: 7. Q1-2011                  Equipment Qualification Program Health Report          03/31/2011 (1/1/2011-3/31/2011)
: 8. Q1-2012                  Equipment Qualification Program Health Report          03/31/2012 (1/1/2012-3/31/2012)
: 9. Q1-2013                  Equipment Qualification Program Health Report          03/31/2013 (1/1/2013-3/31/2013)
: 10. Excel Spreadsheet - No  Cornerstone Rollup - Equipment Qualification 2Q10      07/14/2010 document identifier
: 11. Q2-2011                Equipment Qualification Program Health Report          06/01/2011 (4/1/2011-6/30/2011)
: 12. Q2-2012                Equipment Qualification Program Health Report          06/30/2012 (4/1/2012-6/30/2012)
: 13. Q2-2013                Equipment Qualification Program Health Report          06/30/2013 (4/1/2013-6/30/2013)
: 14. Q3-2010                Equipment Qualification Program Health Report          09/30/2010 (7/1/2010-9/30/2010)
: 15. Excel Spreadsheet - No  Cornerstone Rollup - Equipment Qualification 3Q10      10/13/2010 document identifier
: 16. Q3-2011                Equipment Qualification Program Health Report          09/20/2011 (7/1/2011-9/30/2011)
: 17. Q3-2012                Equipment Qualification Program Health Report          09/30/2012 (7/1/2012-9/30/2012)
: 18. Q4-2010                Equipment Qualification Program Health Report          12/31/2010 (10/1/2010-12/31/2010)
: 19. Q4-2011                Equipment Qualification Program Health Report          12/31/2011 (10/1/2011-12/31/2011)
: 20. Q4-2012                Equipment Qualification Program Health Report          12/31/2012 (10/1/2012-12/31/2012)
: 21. EN-LI-104              EQ Focused Self-Assessment LO-WLO-2011-0015            Revision 8 Attachment 9.10 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program element of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X.E1.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the
staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.10, External Surfaces Monitoring Summary of Information in the Application. The LRA states that AMP B1.10, External Surfaces Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M36, External Surfaces Monitoring of Mechanical Components, as modified by LR-ISG-2011-03, Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2, Aging Management Program XI.M41, Buried and Underground Piping and Tanks, and LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Dry Cooling Tower, aluminum flame arrestors, vent lines to fuel oil storage day tanks A and B, the Essential Chilled Water System room, as well as portions of the MSIV B and MSIV A rooms.
The staff also conducted an independent search of the applicants operating experience database using keywords: corrosion, leak, leakage, under insulation, external, surface, tank, and pinhole.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. EN-DC-178            System Walkdowns                                            Revision 7, 11/21/2013
: 2. UNT-006-032          Coating and Corrosion Program                              Revision 000, 03/31/2016
: 3. WF3-EP-14-00003      WF3 License Renewal Project: Operating Experience Review    Revision 0 Results - Aging Management Program Effectiveness
: 4. WF3-EP-14-00007      WF3 License Renewal Project: Aging Management Program      Revision 0 Evaluation Results: Non-Class 1 Mechanical
: 5. EN-TQ-104            Engineering Support Personnel Training Program              Revision 20 03/25/2016
: 6. WF3-ME-14-00029      WF3 License Renewal Project: License Renewal Topical Report Revision 0 on Mechanical Components Susceptible to Corrosion Under    12/03/2015 Insulation
: 7. PE-004-021          CCW Heat Exchanger Performance Test                        Revision 003 02/27/2014
: 8. PE-004-033          Wet Cooling Tower A(B) Thermal Performance Test            Revision 305 02/27/2014
: 9. PE-004-024          ACCW & CCW System Flow Balance                              Revision 304 02/27/2014
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects and the acceptance criteria program elements, sufficient information was not available to determine whether they are consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The LRA AMP includes an enhancement to the detection of aging effects program element. The enhancement states that the accessible portion of in-scope piping components with tightly adhering insulation will be inspected. The GALL Report AMP recommends that the entire population of in-scope piping components with tightly adhering insulation be inspected. It is not clear to the staff that these statements are consistent because the applicants use of the word accessible suggests that some in-scope piping components with tightly adhering insulation will not be inspected.
* The LRA AMP includes an enhancement to the acceptance criteria program element.
The enhancement states that flexible polymeric materials should have no unanticipated dimensional change. The GALL Report AMP states that flexible polymeric materials should have no dimensional change. It is not clear to the staff that these statements are consistent because the applicants use of the word unanticipated suggests that some in-scope flexible polymeric components may experience anticipated dimensional changes.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.
* Operating experience has revealed external corrosion to be a significant issue at Waterford 3. Licensee Event Report 2014-004-03 states that through-wall corrosion was identified on the EDG Feed Tank vent lines where the vent lines pass through the roof.
An NRC inspector identified the corrosion, and it was not known how long the through-wall corrosion had existed. Waterford 3 has implemented a fleet procedure to resolve the adverse condition. Given the EDG vent line corrosion event, the staff is concerned that for components exposed to outdoor air, either: (a) not everything was examined during walkdowns; or (b) the interval between inspections is too long. Based on discussions during the AMP audit and review of corrective actions associated with the corrosion event, it appeared that the former and not the latter was the case. This is reinforced by the staffs observation of the condition of components exposed to outdoor air during the AMP audit. It is unclear how the fleet procedure, recent operating experience, and activities to resolve the issue are incorporated into the LRA AMP(s).
* The applicant is using visual inspection per the External Surfaces Monitoring AMP to inspect Dry Cooling Tower Aluminum Heat Exchanger Fins for cracking and loss of
material in order to assure that the intended function of heat transfer is maintained. It is unclear to the staff how the visual inspections will satisfactorily detect loss of intended function.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M36. The staff also identified certain aspects of the detection of aging effects and acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.11, Fatigue Monitoring Summary of Information in the Application. The LRA states that AMP B.1.11, Fatigue Monitoring Program, is an existing program with enhancements that is consistent with the program elements in GALL Report AMP X.M1, Fatigue Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: fatigue and cracking.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                              Revision/Date
: 1. WF3-EP-14-00006      Fatigue Monitoring Program - Program Book                      Revision 0
: 2. PE-002-003            Safety Related Procedure - Fatigue Monitoring Program          Revision 3, 12/14/05
: 3. CR-WF3-2015-          Condition Report - Fatigue Monitoring Program                  1/6/2015 00044
: 4. WF3-ME-15-00002      Plant Transient Analysis for Waterford - Plant Startup Through Revision 0, 4/15/14-1400394.32 - (License Renewal)                        6/2/2015
: 5. 1400394.301          Waterford 3 Plant Fatigue Transient Review                    Revision 0, 4/9/2015
Document                                      Title                            Revision/Date
: 6. WF3-EP-14-00005      Engineer Report: TLAA - Mechanical Fatigue                Revision 0, 2/2/2016
: 7. NRC-RIS-2011      NRC-RIS-2011 Metal Fatigue Analysis Performed by      4/11/12 A2-WF3-0001              Computer Software The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program and parameters monitored or inspected program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The parameters monitored or inspected program element of the LRA AMP states that the number of occurrences of plant design transients that cause significant fatigue usage will be monitored, which is consistent with the recommendations in the GALL Report.
However, the staff noted that the cycle limit of the Loss of Charging transient is less than the cycle limit listed in FSAR Table 3.9-3. The staff is concerned that the applicant may not be monitoring the most limiting cycle limit of the transient.
* The parameters monitored or inspected program element of the LRA AMP states that the number of occurrences of plant design transients that cause significant fatigue usage will be monitored, which is consistent with the recommendations in the GALL Report.
However, the LRA does not include which transients are used as inputs to the fatigue analyses associated with the Leak-Before-Break analyses and Postulation of High-Energy Line Break analyses.
In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, staff will consider issuing an RAI for the subject discussed below.
* The LRA AMP states an enhancement to the scope of program program element. The enhancement states that it will develop a set of fatigue usage calculations that consider the effects of the reactor water environment for additional plant-specific locations.
However, the LRA does not include any information on the methodology the applicant will use to identify and evaluate plant-specific locations that may be more limiting for environmentally assisted fatigue than those listed in NUREG/CR-6260.
During the audit, the staff made the following observation:
* The staff reviewed operating experience action: NRC-RIS [Regulatory Issue Summary] -2011-14 and noted that the applicant reviewed RIS 2011-14 and determined that the staffs concerns in the RIS are not applicable at Waterford. The staff noted that the applicant determined that its procedures do not allow the use of the user-defined options or manual editing features.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.
* The staff issued RIS 2008-30 to address a specific methodology to demonstrate cyclic load capabilities. However, the LRA did not provide enough information to justify how it has addressed the staffs concerns in RIS 2008-30.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X.M1.
The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the scope of program and parameters monitored or inspected program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.12, Fire Protection Summary of Information in the Application. The LRA states that AMP B.1.12, Fire Protection, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M26, Fire Protection. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Cable Spreading Room in the reactor auxiliary building, and the Wing Area of the Reactor Building. The staff also conducted an independent search of the applicants operating experience database using keywords: 3M fire wrapping, fire wraps, fire doors, fire barriers, floors, ceilings, fire barrier, intumescent coating, penetration seals, openings, holes, cracks, cable trays, cerablanket, Hemyc, Thermo-lag, and pyrocrete.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                          Revision/Date
: 1. WF3-EP-14-00007        Aging Management Program Evaluation Results Non-Class 1    01/20/2016 Mechanical Fire Protection
Document                                    Title                                  Revision/Date
: 2. ME-003-006    Fire Barrier Penetration Seals                                        Revision 306 3/30/2015
: 3. ME-003-007    Fire Wrap Barriers                                                    Revision 015 9/17/2012
: 4. ME-003-009    Fire Rated Walls, Floors, and Ceilings                                Revision 305 4/18/2016
: 5. PS-015-111    Fire Door Surveillance                                                Revision 01 2/16/2012
: 6. UNT-005-013  Fire Protection Program                                              Revision 13 4/1/2015
: 7. CR-WF3-2015-  A void (approximately 6 inches x 6 inches x 6 inches) was            03/12/2015 01464            discovered in a 3-hour fire barrier while performing a core bore cutting on the -30 elevation outside of charging pump room A.
: 8. CR-WF3-2015-  Holes found in the EDG Feed Tank Vent Lines 7EG1-29 and              01/21/2015 00405            7EG1-30 should have been evaluated as part of the Fire Protection Program.
: 9. CR-WF3-2015-  Fire door (door 246) to Emergency Feedwater Pump-A Room              01/08/2015 00102            on -35 RAB was found not self-latching.
: 10. CR-WF3-2014- Fire door (door 35) handle at +21 Q-deck to RCA was broken.          03/02/2014 00936
: 11. CR-WF3-2014- The bottom bolt of Fire Door (#D179) to the RAB +35 Electrical        01/18/2014 00260            Penetration Area A latching mechanism cover was missing. The top bolt was loose.
: 12. CR-WF3-2013- Calculation EC-F111-001 (Fire Barrier Design Basis Review) was        01/15/2013 00261            not completed for a barrier segment (segment 150A) in the Turbine Generator Building.
: 13. CR-WF3-2011- Documentation of approved UL-listed fire dampers installed at 66      03/28/2011 01696            penetrations demonstrating that their fire ratings were commensurate with the fire barrier ratings could not be located.
: 14. CR-WF3-2010- Contrary to Section 14-2.6 of NFPA 80 Fire Doors and Windows        07/22/2010 04471            (1997), which states that combustible material shall be kept well away from openings, a 200-gallon used lube oil tank was found within 3 feet of fire door D61. D61 is an entry point into electrical switchgear room containing electrical offsite power switchgear equipment.
: 15. CR-WF3-2009- Seal lists in ME-003-006 Revision 303 are not updated for            03/05/2009 01062            inaccessible seals identified in the 2005, 2007, and 2008 inspections.
: 16. CR-WF3-2008- Fire wrap (3M Interam E-54A) for conduit 30604D-SA in Fire Area      04/24/2008 01465            RAB 17 Component Cooling Water Heat Exchanger B Room was not installed per design (ER-W3-1999-0172-000) as documented in the Engineering Request Change Notice.
: 17. CR-WF3-2008- The fire rating of Cable Vault/Relay Room RAB7 was in question        02/20/2008 00654            because of the presence of a 4-inch conduit (Conduit 35210-NB) partially installed in the room.
: 18. CR-WF3-2007- Fire wrap was not installed in accordance with Fire Wrap            01/31/2007 00381            Installation and Rework Procedure - PMC-003-001.
: 19. CR-WF3-2004- Cracks were found in Pyrocrete Barrier above Door 217 in              04/22/2004 01220            Room #225, Fire Zone 22.
Document                                      Title                            Revision/Date
: 20. Technical            Waterford 3 Technical Requirements Manual (TRM)              Amendment 91 Requirements Manual The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit, the staff made the following observations:
* For the parameters monitored or inspected, the staff noted that the GALL Report recommends that the fire protection program manage the effects of aging (e.g., loss of material, cracking) for fire barrier materials (e.g., fire wrapping.) The staff noted that the applicants Fire Wrap Barriers (ME-003-007, Revision 015, dated September 17, 2012, step 9) procedure directs plant personnel to inspect fire wrap barriers of different configurations (e.g., single tray, double tray) and materials (e.g., Hemyc, 3M fire wrap) for degradation at least once every 18 months.
* For the parameters monitored or inspected, the staff noted that the GALL Report recommends that visual inspection of not less than 10 percent of each type of penetration seal be performed for any sign of degradation. If any sign of degradation is detected within the first sample, the scope of the inspection is then expanded to include additional seals (under detection of aging effects). The staff noted that the applicants Fire Barrier Penetration Seals (ME-003-006, Revision 306, dated March 30, 2015) procedure directs plant personnel to inspect at least 10 percent of each type of penetration seal every 18 months (every refueling outage, page 3, step 1.2) for change in appearance and abnormal degradation. Consistent with the Waterford 3 TRM (4.4.11.c, amendment 91), step 1.2.1 of the same procedure instructs plant personnel to inspect an additional 10 percent of each type of sealed penetration if abnormal degradation of penetration seals in the first sample of 10 percent is detected. The locations of penetration seals to be inspected are specified in the attachments to the procedure.
* Under the same program elements of parameters monitored or inspected and detection of aging effects, the GALL Report recommends that fire-rated doors are (1) inspected for any degradation of door surfaces, and (2) functionally tested to ensure intended function. The staff noted that the applicants Fire Door Surveillance (PS-015-111, Revision 301, dated 3-16-2012) procedure directs plant personnel to perform various inspections and testing of fire doors (steps 5.2, 5.3 and 5.4).
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M26. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B1.13, Fire Water System Summary of Information in the Application. The LRA states that AMP B.1.13, Fire Water System, is an existing program with enhancements and exceptions that will be consistent with the program elements in GALL Report AMP XI.M27, Fire Water System, as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the exceptions and enhancements associated with this AMP. The exceptions to the GALL Report AMP and the enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fire water storage tanks (FWSTs), reactor auxiliary building (RAB), 21-foot elevation preaction control station, and the electric and diesel-driven fire pumps. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, biological, blister, block, clog, coat, delamin, flak, foul, holiday, lined, lining, MIC, microbiologic, min wall, peel, and perforat, pit, recur, sprinkler, and through wall.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                              Revision/Date
: 1. WF3-EP-14-00007        Aging Management Program Evaluation Results Non-Class 1        Revision 0 Mechanical Fire Water System
: 2. MM-003-021            Sprinkler System Inspection (Safety Area)                      Revision 10
: 3. MM-004-422            Sprinkler System Inspection (Nonsafety Areas)                  Revision 8
: 4. MM-004-424            Building Fire Hose Station Inspection and Hose Replacement      Revision 304
: 5. OP-903-055            Fire Main Flush and Hydrant Inspection                          Revision 11
: 6. OP-903-057            Fire Protection System Flow Test                                Revision 018
: 7. N/A                    Technical Requirements Manual                                  Amendment 72, Amendment 91
: 8. WF3-ME-14-00028        License Renewal Topical Report on Recurring Internal Corrosion  Revision 0
Document                                    Title                            Revision/Date
: 9. Work Order (WO) Fire Water Storage Tank B - [area of corrosion on southwest    06/15/2016 436421-02          corner of the tank]
: 10. WO 436421-01  Fire Water Storage Tank A - [area of corrosion on northwest    03/24/2016 corner of the tank
: 11. WO-WF3-        Perform Flow Test of Fire Protection System per OP-903-057 -    03/30/2013 52283342          Results
: 12. WO-WF3-        Perform Flow Test of Fire Protection System per OP-903-057 -    07/20/2009 51545900          Results
: 13. WO-WF3-        Inspect Safety Related Sprinkler Systems MM-03-021 - Results    05/28/2014 52462938                                                                            10/22/2015
: 14. WO-WF3-        Non-Safety Fire Protection Sprinkler Inspection - Results        01/16/2015 52509629                                                                            01/14/2016
: 15. OP-903-059    Sprinkler System Functional Test                                Revision 12
: 16. OP-903-058    Fire Hose Station Valve Cycling Check                            Revision 14
: 17. WO-51668265    Hose Station Flow Test                                          02/22/2016
: 18. WO 52297378    Perform Functional Test of RAB/RCA FP sprinkler systems per      02/15/2011 OP-903-059 - results
: 19. OP-904-014    Turbine Building/Outside Sprinkler System Manual Test            Revision 302
: 20. WO 52375029    Verify Flow Through Deluge Nozzles - Results
: 21. PMQR 1527-01  Work Instruction for Verifying Flow Through Deluge Nozzles      04/13/13
[Start-up Transformer A] - Results
: 22. PMRQ 6727-02  Work Instruction for Verifying Flow Through Deluge Nozzles      10/22/2013
[Start-up Transformer B] - Results
: 23. PMQR 1528-01  Work Instruction for Verifying Flow Through Deluge Nozzles      05/21/2014
[Main Transformer A] - Results
: 24. PMQR 6672-01  Work Instruction for Verifying Flow Through Deluge Nozzles      05/02/2014
[Main Transformer B] - Results
: 25. WO 00257162    HVRMFLT0008 - Spray Nozzle Air Flow Test RAB Exhaust Filter      03/29/2012 Train Inlet for E-22 Fan Units - Results
: 26. WO 52463131    SBVMFLT0001 A - Air Flow Test Through Spray Nozzles [SBV        07/01/2014 Filter Train A Primary HEPA Filter] - Results
: 27. WO 52489432    FP MTNK0001 B [fire water storage tank B] - Inspect Tank        07/10/2014 Internals IAW NFPA-25 [Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems,] -
Results
: 28. WO 00232209    FP MTNK0001 A [fire water storage tank A] - Inspect Tank        11/05/2010 Internals IAW NFPA Results
: 29. WO 00232586    FP MTNK0001 B [fire water storage tank B] - Inspect Tank        11/18/2010 Internals IAW NFPA Results
: 30. WO 52487901    FP MTNK0001 A [fire water storage tank A] - Inspect Tank        08/25/2015 Internals IAW NFPA Results
: 31. CR-WF3-2015-  FWST A Internal Corrosion                                        08/25/2015 05569
: 32. CR-WF3-2007-  The fifth North/South sprinkler header from the West side of the 02/22/2007 00648              7B Warehouse has at least two water leaks.
Document                                          Title                              Revision/Date
: 33. CR-WF3-2008-        Emerge minor maintenance work order 147762 onto schedule to      04/15/2008 01464                  replace a section of Fire Protection sprinkler pipe in 7B Warehouse that has a pinhole leak.
: 34. CR-WF3-2009-        Unit Auxiliary Transformer A Failed Main Drain Test              11/04/2009 06241
: 35. CR-WF3-2009-        Diesel Fire Pump B - Debris Inside of Heater Causing Flow        11/09/2009 06452                  Blockage
: 36. CR-WF3-2011-        Minor Through-wall Leak from FWST A Drain Pipe - From            08/31/2011 06149                  External Corrosion
: 37. CR-WF3-2014-        Leak (30 drops per minute(dpm)) in Sprinkler Header Piping in    02/21/2014 00830                  Turbine Building
: 38. CR-WF3-2012-        Leak in Sprinkler Piping in Warehouse                            08/17/2012 04049
: 39. CR-WF3-2012-        Leak (1 gallon per minute) in 4-inch Fire Sprinkler Header in    08/13/2012 03939                  Reactor Auxiliary Building
: 40. CR-WF3-2012-        Leak (20 dpm) in the Fire Protection Line in the Turbine Building 03/26/2012 01487
: 41. CR-WF3-2010-        Roll-up Condition Report To Address Clogged Nozzles During        01/23/2010 00484                  Testing of Startup Transformer B Deluge System
: 42. CR-WF3-2010-        Two Clogged Nozzles During Testing of Startup Transformer B      01/22/2010 00478                  Deluge System
: 43. CR-WF3-2008-        Underground Flow Tests Degraded Slightly from Previous Tests      08/27/2008 04117
: 44. CR-WF3-2007-        Leaks (10 dpm) in Warehouse Fire Water Header                    02/22/2007 00648
: 45. CR-WF3-2015-        Leak (12 dpm) in Startup Transformer A Header Piping              11/19/2015 08573
: 46. CR-WF3-2013-        Clogged Nozzle in Startup Transformer A Deluge System            04/13/2013 01846
: 47. N/A                System Description, Fire Protection System, Table 5, Areas      Revision 8 Protected by Automatic Suppression Systems
: 48. 58174323            Sprinkler System [piping installation details] Fire Protection -  Revision 15 M3A, M4, M11A, M12B, M13 The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the existing program as modified by the proposed exceptions and enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending, program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects, acceptance criteria, and corrective actions program elements associated with enhancements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below.
* The LRA AMP states enhancements to the detection of aging effects program element, Enhancement Nos. 2, 7, 14, 16, 19, and 20. The staffs concerns are as follows:
o  Enhancement No. 2 states that a wet pipe sprinkler system will be inspected every 5 years by opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch line. The staffs concern is that the enhancement does not state that the wet pipe systems in each building will be inspected every 5 years. NFPA 25 Sections 14.2.2 and A.14.2.2 require that each buildings wet pipe system be inspected. During the audit, the staff verified that there is only one wet pipe sprinkler system in each building protected by a wet pipe system.
o  Enhancement No. 7 states that strainers will be removed every 5 years to clean and inspect for damage and corroded parts. The staffs concern is that AMP XI.M27, as modified by LR-ISG-2012-02, recommends that strainers be inspected on a refueling outage interval and after each system actuation.
o  Enhancement No. 16 states that vacuum box testing will be performed on the bottom of the FWST to identify leaks and that in the event the bottom of the fire water tank is uneven, the station will perform a suitable NDE technique rather than vacuum box testing to identify leaks. The staffs concern is that it cannot evaluate the suitability of an unspecified technique to detect leaks in tank bottoms.
o  Enhancement No. 19 states that augmented flow tests or flushing and wall thickness measurements will be conducted for fire water piping experiencing recurring internal corrosion. The staffs concerns are that the enhancement did not address whether wall thickness measurements will be conducted in addition to flow tests and flushes or in addition to only flushes; and it did not state: (a) the minimum number of inspections that will occur in each 5-year interval; (b) the criteria to be used to determine that additional inspections are warranted (e.g., extent of degradation at individual corrosion sites, rate of degradation change, trend of through-wall leaks); (c) how inspections of components that are not easily accessed will be conducted; (d) how leaks in buried or underground piping will be detected; and (e) how many additional inspections will be conducted within an inspection interval when through-wall leakage is detected or inspection results reveal that pipe wall thickness is below minimum wall. In addition, Enhancement No. 19, which states that activities will be completed every 5 years, is not consistent with LRA Section 3.3.2.2.8 which states, will conduct augmented flow tests or flushing, and wall thickness measurements for fire water piping experiencing recurring internal corrosion prior to the period of extended operation and at least once every refueling cycle during the period of extended operation.
o  Enhancement No. 20 states the alternative actions that will be taken prior to returning a FWST to service without repair or replacement of degraded coatings.
The staff concerns are that: (a) the alternative could be used even though the size and frequency of blisters could be increasing; and (b) the enhancement allows a coating inspector rather than a coating specialist to evaluate the conditions for use of the alternative.
* The LRA AMP states an enhancement, Enhancement No. 22, to the acceptance criteria program element. The enhancement states that adhesion results can be
quantified by conducting visual inspections, wet sponge testing, or dry film testing. The staffs concern is that these methods are not capable of quantifying adhesion results.
* The LRA AMP states an enhancement, Enhancement No. 25, to the corrective actions program element. The enhancement states that obstruction evaluations will be conducted if there is evidence of excessive discharge of material during routine flow tests. AMP XI.M27, as modified by LR-ISG-2012-02 recommends the use of the criteria in NFPA 25 Section 14.3, Obstruction Investigation and Prevention, which uses the term obstructive rather than excessive. The staffs concern is that the term excessive is not defined.
In order to verify that the exceptions, Exception Nos. 5 and 6, will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below. The LRA AMP states exceptions to the detection of aging effects program element. The staffs concerns are as follows:
* Exception No. 5 states that cross-hatch testing, as described in ASTM D 3359, Standard Test Methods for Measuring Adhesion by Tape Test (recommended by AMP XI.M27, as modified by LR-ISG-0212-02 by citing NFPA 25 Section 9.2.7.1), is not conducted when signs of pitting, corrosion, or failure of the coating is detected. The basis for the exception in part includes crediting spot wet sponge tests and dry film testing as a means to detect coating adhesion deficiencies. The staff has concluded that these methods do not effectively detect coating adhesion deficiencies, but rather holidays and coating thickness, respectively.
* Exception No. 6 and Enhancement No. 3 address trip testing preaction valves with the control valves cracked open in lieu of testing with control valves in the full open position and internal inspections of dry sprinkler piping downstream of preaction systems, respectively. The staffs concern with Exception No. 6 is that a cracked open control valve might not provide adequate flow to detect potential flow blockage. The staffs concern with Enhancement No. 3 is that it does not state: (a) the frequency of inspections; (b) how access to the piping will be obtained (e.g., removal of a sprinkler and opening a flushing connection); and (c) the location of the removed sprinkler (i.e., most remote). The exception and enhancement address inspections or tests that are used to detect potential flow blockage of dry sprinkler piping downstream of preaction systems.
During the audit, the staff made the following observations:
* The staff reviewed TRM Table 3.7-2, Spray and/or Sprinkler Systems, and confirmed that there are 21 credited spray or sprinkler systems.
* The staff reviewed TRM Table 3.7-4, Fire Hose Stations, and confirmed that there are 76 credited fire hose stations.
* The staff reviewed the License Renewal Topical Report on Recurring Internal Corrosion.
Attachment 1, Recurring Internal Corrosion Subject to Aging Management Review, identified five CRs associated with leaks in the fire protection system. The CRs included: CR-WF3-2004-02297 (July 28, 2004); CR-WF3-2008-02468 (May 20, 2008);
CR-WF3-2008-04793 (October 15, 2008); CR-WF3-2008-01390 (April 9, 2008); and CR-WF3-2012-00758 (February 12, 2012).
* The staff reviewed procedure OP-903-058 and confirmed that the acceptance criteria for the fire hose station flow confirmation (conducted every 3 years) is, no flow blockage exists when each fire hose station valve is partially opened. Specifically, the test states,
[n]o flow blockage is indicated by visible water flowing out of the hose station. There are 76 hose stations in this portion of the test. The hose stations are located in the reactor auxiliary building, fuel handling building, Dry Cooling Tower, turbine building, reactor building, and support buildings. In addition, the test includes remote hose stations, defined as, the farthest fire hoses from the Fire Pumps. The acceptance criteria for the remote hose stations (conducted every 5 years) is, [f]or each hose station being tested in Attachment 10.3 [remote hose stations], if Hose Station residual pressure is <65 PSI or flow rate is <100 GPM, then data must be submitted to the Fire Protection Engineer for evaluation of acceptance. There are two remote hose stations, one in the fuel handling building and one in the turbine building.
* The staff reviewed procedure OP-903-059 and work orders WO 52297378 and confirmed that there are 37 main drain tests conducted, including 9 in the turbine building, 1 in the fuel handling building, 2 in the reactor building, 16 in the reactor auxiliary building, 7 in the yard areas, and 2 in the diesel engine fuel oil storage tank area. The staff noted that although the title of WO 52297378 refers to the RAB/RCA FP sprinkler systems, the work order documents testing of all the above cited main drain locations.
* The staff reviewed procedures OP-903-059 and OP-904-014 and confirmed that the applicant tests the piping downstream of the deluge valves by confirming that the water pressure is approximately 125 psig prior to opening the deluge valve, pressure drops to approximately 0 psig when opened, and returns to approximately 125 psig when the deluge valve is closed. The staff also noted that PMQR 1527-01, within work order WO 52375029, directs personnel to [o]bserve flow at each Fire Protection Spray nozzleand document and spray pattern abnormalities. The staff reviewed other deluge valve testing work orders and confirmed that each included a similar PMQR (i.e., 6727-02, 1528-01, 6672-02) specific to the transformers deluge system being tested.
* The staff reviewed work orders WO 00257162 and WO 52463131 and confirmed that the procedure uses air to test deluge piping for filter units. The procedure requires the individual to check sprinkler nozzles for obstructions.
* The staff reviewed procedure OP-903-055 and confirmed that the acceptance criteria for the test is [c]lear water is being discharged from the designated fire hydrant, and flushing has been in progress for at least 2 minutes.
* The staff reviewed work orders WO 52489432, WO 00232209, WO 00232586, and WO 52487901 and confirmed that, with the exception of the August 25, 2015, inspection of fire water storage tank A, no corrosion or coating degradation was noted on the internals of the FWSTs. During the August 25, 2015, inspection of FWST A, minor corrosion was noted on the inside surface of the northeast manway, and some corrosion was noted on the drain line. The staff noted that CR-WF3-2015-05569 was initiated by the applicant to document the corrosion. The staff reviewed the photographs provided with the condition report and noted that corrosion inside the tank appears to be minor and that the corrosion on the inside surfaces of the drain piping are typical with that observed in carbon steel piping exposed to raw water.
* The staff reviewed CR-WF3-2010-00484 and noted that there have been six clogged nozzles spanning, two in 2005, one in 2006, one in 2008, and two in 2010.
* The staff reviewed the fire water system piping and instrument diagrams, system description, and installation drawing with the applicant and confirmed that in each building protected by a wet pipe system, there is only one wet pipe sprinkler system in contrast to dry piping preaction systems where there are multiple systems in each building.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing RAIs for the subjects discussed below.
* The staff noted that certain aspects of the recommended FSAR supplement content were not included. Specifically, the following are missing from the FSAR supplement:
(a) the program manages the aging effects through the use of flow testing and visual inspections performed in accordance with the 2011 Edition of NFPA 25; and (b) the water-based fire protection system is normally maintained at required operating pressure and is monitored such that loss of system pressure is immediately detected and corrective actions initiated.
Audit Results. Based on this audit, the staff verified that scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M27 as modified by LR-ISG-2012-02. The staffs evaluation of aspects of the detection of aging effects program element associated with exceptions will be addressed in the SER.
The staff also identified certain aspects of the detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.14, Flow-Accelerated Corrosion Summary of Information in the Application. The LRA states that AMP B.1.14, Flow-Accelerated Corrosion, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M17, Flow-Accelerated Corrosion, as modified by LR-ISG-2012-01, Wall Thinning Due to Erosion Mechanisms. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed enhancements associated with this AMP and will document their evaluation in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of
the applicants operating experience database using keywords: cavit, erosion, FAC, flow accel, and wall thin.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                              Revision/Date
: 1. WF3-EP-14-00002      Operating Experience Review Results Aging Effects Requiring      Revision 0 Management
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management            Revision 0 Program Effectiveness, Section 3.1.12 Flow-Accelerated Corrosion
: 3. WF3-EP-14-00007      AMP Evaluation Results - Non-Class 1 Mechanical, Section 4.8      Revision 1 Flow-Accelerated Corrosion
: 4. EN-DC-315            Flow-Accelerated Corrosion                                        Revision 12
: 5. W3P89-3081          NRC GL 89-08, Erosion/Corrosion Induced Pipe Wall Thinning      7/21/1989
: 6. W3P89-1592          Supplemental Information in Response to NRC GL 89-08,            11/17/1989 Erosion and Corrosion Induced Pipe Wall Thinning
: 7. CR-WF3-1997-        Due to Flow-Accelerated Corrosion, unexpected gross thinning. N/A 01205                  Replaced with stainless steel
: 8. CR-WF3-2007-        WF3 Flow-Accelerated Corrosion program - several components      N/A 03899                  that are susceptible to flow-accelerated corrosion, but not included in the CHECWORKS software model do not have available documentation of previous inspections.
: 9. CR-WF3-2008-        WF3 Flow-Accelerated Corrosion Program software models            N/A 02852                  (CHECWORKS) contain errors in the feedwater heaters by the fact that the nozzles are the original A106B (carbon steel) material.
: 10. CR-WF3-2009-        A review of the Flow-Accelerated Corrosion CHECWORKS 00183                  predictive model (as a result of recent increase in Blowdown System flow) indicates that there are two areas where the model has not reflected actual plant conditions.
: 11. CR-WF3-2009-        Cavitation in ACCW spool piece in valve body ACC-126A.            N/A 00614
: 12. CR-WF3-2009-        Extent of condition for CR-WF32-2009-00183 identified three      N/A 01980                  additional discrepancies.
: 13. CR-WF3-2009-        EPRI identified a bug in CHECWORKS software that is used to    N/A 07244                  predict flow-accelerated corrosion downstream of a piping section that has been replaced, under certain specific conditions.
: 14. CR-WF3-2011-        MSR A shell wear (due to erosion and/or flow-accelerated          N/A 02509                  corrosion) wall thickness less than minimum allowed of 1.2.3.2 per TD-W120.1825. Similar wear noted in past (CR-WF3-2006-4202).
: 15. CR-WF3-2011-        BD-109A replaced due to body leak (CR-WF3-2010-1873).            N/A 03022                  BD-109A internal shows severe wastages on body and pipe joint.
Document                                        Title                              Revision/Date
: 16. CR-WF3-2012-        BD-109A (S/G 1 Blowdown flow control valve) stated similar      N/A 01648                    conditions expected for BD-109B and recommended inspection during RF17.
: 17. CR-WF3-2012-        Flow-accelerated corrosion scope expansion inspection identified N/A 05734                    additional wall thinning.
The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP, as modified by LR-ISG-2012-01.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.
The staff also audited the description of the LRA AMP provided in the FSAR supplement in LRA Section A.1.14. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M17, as modified by LR-ISG-2012-01. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.15, Inservice Inspection Summary of Information in the Application. The LRA states that AMP B.1.15, Inservice Inspection, is an existing program that is consistent with the program elements in GALL Report AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: cracking, leak, wear, loss of material, failure, degradation, flaw, repair, and weld.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                              Revision/Date
: 1. WF3-EP-14-00006        Program Basis Document, Aging Management Program                Revision 1, Evaluation Results - Class 1 Mechanical                        05/01/2013
: 2. CR-WF3-2011-          Missed Examination of ASME Code Items                          05/10/2011 01748 3.CR-WF3-2005-            Boric Acid Discovered in the Annulus of Pressurizer Heater      07/01/2005 01449                    Sleeves C4 and D2
: 4. WF3-EP-14-00003        Operating Experience Review Results - Aging Management          Revision 0, Program Effectiveness                                          11/30/2015
: 5. CR-WF3-2012-          Reactor Vessel Flange Leakoff Line                              10/13/2012 05113
: 6. NRC Integrated        NRC Integrated Inspection Report - Failure to perform ASME      Revision 0 Inspection                Code Section XI Required Examination Report 05000382/
2012005
: 7. CR-WF3-2007-          Reactor Vessel Head Flange O-Ring Leak                          10/31/2007 03385
: 8. CR-WF3-2007-          Reactor Vessel Head Flange O-Ring Leak                          09/04/2007 03129
: 9. WF3-EP-14-00006        Program Basis Document, Aging Management Program                Revision 1, Evaluation Results - Class 1 Mechanical, Inservice Inspection 05/01/2013
: 10. LER-382-2000-011      RCS Pressure Boundary Leak due to PWSCC and Leaking            11/16/2000 MNSA Clamps
: 11. LER-382-1999-002      Leaking Reactor Coolant System Pressure Boundary Nozzles        11/16/2000
: 12. LER-382-2003-003      RCS Pressure Boundary Leak due to PWSCC                        12/18/2003 13.CR-WF3-2000-          Boric Acid Discovered in the Annulus of Pressurizer Heater      03/06/2000 00199                    Sleeves C4 and D2.
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program.
During the audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to verify that the program elements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below.
* The LRA AMP states consistency to the scope of program program element. In the operating experience section, it indicates that it had missed a Code-required examination in 2010. The staffs concerns are as follows:
The staff performed a plant-operating experience review and noted that, in addition to missing an item in 2010, the applicant had also missed another Code
required testing in 2012. The staff has concerns that applicant may not be clear on its program scope and may miss Code required examinations during the period of extended operation.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M1. The staffs evaluation of aspects of the scope of program program element will be addressed in the SER. The staff also identified certain aspects of the scope of program, program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in SRP-LR.
LRA AMP B.1.16 Inservice Inspection - IWF Summary of Information in the Application. The LRA states that AMP B.1.16, Inservice Inspection - IWF, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S3, ASME Section XI, Subsection IWF. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted a walkdown of the Essential Chilled Water system. The staff also conducted an independent search of the applicants operating experience database using keywords: IWF, support, pipe hanger, and corrosion.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                              Revision/Date
: 1. WF3-CS-14-00002      Aging Management Review of the Nuclear Plant Island Structure Revision 1
: 2. WF3-ME-14-00009      Aging Management Review of the Component Cooling and          Revision 1 Auxiliary Component Cooling Water Systems
: 3. WF3-CS-14-00004      Aging Management Review of Bulk Commodities                  Revision 1
Document                                      Title                                Revision/Date
: 4. WF3-EP-14-00008      Aging Management Program Evaluation Report Civil/Structural      Revision 1
: 5. CR-WF3-2014-01840    Condition Report                                                04/18/2014
: 6. ISI-VT-14-072        Visual Examination of Pipe Hanger, Support, or Restraint        04/24/2014
: 7. ISI-VT-15-019        Visual Examination of Pipe Hanger, Support or Restraint, Related 11/19/2015 WF3-2015-07635          CR
: 8. CR-WF3-2014-        Condition Report                                                04/24/2014 02135
: 9. CR-WF3-2012-        Condition Report                                                12/21/2012 07616
: 10. LO-WLO-2015-        RF20 WF3 Inservice Inspection Pre-NRC Inspection Snapshot        08/13/2005 00054 CA-00004          Assessment
: 11. W/O 00109393        Work Order Associated with Condition Report                      08/29/2007
: 12. ISI-VT-08-021      ISI-VT-08-021 RF-15-3-ISI Inservice Inspection Report            05/01/2008 RF-15-3-ISI
: 13. ISI-VT-12-051      Evaluation of Spring Hanger                                      10/29/2012 CR-WF3-2012-05774 EC 40842
: 14. CEP-NDE-0903        VT-3 Examination - Entergy Nuclear Engineering Programs          Revision 5
: 15. EN-DC-141          Design Inputs                                                    Revision 15
: 16. EN-LI-102          Corrective Action Program                                        Revision 24
: 17. EN-MA-145          Maintenance Standard for Torque Applications                    Revision 3
: 18. SEP-ISI-104        Program Section for ASME Section XI, Division 1 Inservice        Revision 2 Inspection Program
: 19. EN-MA-145          Maintenance Standard for Torque Applications                      Revision 5
: 20. UNT-006-032        Coating and Corrosion Program                                    Revision 0
: 21. EN-DC-178          System Walkdowns                                                  Revision 7
: 22. SEP-RR-WF3-001    ASME Section XI Repair/Replacement Program                        Revision 0
: 23. WF3-EP-14-00003    Operating Experience Review Results - Aging Management          Revision 0 Program Effectiveness
: 24. CEP-NDE-0901        VT-1 Visual Examination (ASME XI)                                Revision 4
: 25. CEP-NDE-0902        VT-2 Visual Examination (ASME XI)                                Revision 7
: 26. CEP-NDE-0903        VT-3 Visual Examination (ASME XI)                                Revision 5 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding
program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP state that high-strength structural bolting is not considered susceptible to SCC because plant procedures prohibit the use of MoS2 as a thread lubricant for bolting. The GALL Report AMP XI.S3 recommends that for high-strength structural bolts in sizes greater than 1-inch nominal diameter with measured yield strength greater than or equal to 150 ksi (1,034 MPa), in addition to the VT-3 examinations, volumetric examination be performed to detect cracking.
Alternatively, the GALL Report states that such examination can be waived with adequate plant-specific justification. It is not clear whether plant-specific justification in the LRA to waive the volumetric examination is limited just to the absence of the use of MoS2 lubricants. It is not also clear that the LRA statement is consistent with the GALL Report AMP XI.S3, because the GALL Report does not limit MoS2 thread lubricant as the only contributor to the aging mechanism for SCC in the above-mentioned high-strength bolts.
* The LRA states that the preventive actions program element will be consistent with the GALL Report. The GALL Report AMP XI.S3 recommends that the program specify the use of bolting material that has an actual measured yield strength less than 150 ksi.
However, the preventive actions program element of LRA AMP B.1.16 and its basis documents do not appear to include preventive actions to limit the selection of bolting material to those that have an actual measured yield strength of less than 150 ksi, which is recommended by the GALL Report to preclude SCC of high-strength bolts. Therefore, the staff was unable to verify consistency of the preventive actions program element of LRA AMP B.1.16 with that of the GALL Report AMP XI.S3.
* The preventive actions program element of GALL Report AMP XI.S3 states, in part:
[s]election of bolting material and the use of lubricants and sealants [are] in accordance with the guidelines of EPRI NP-5769, EPRI TR-104213, and the additional recommendations of NUREG-1339 to prevent or mitigate degradation and failure of safety-related bolting. GALL Report AMP XI.S3 also states that [s]tructural bolting replacement and maintenance activities include appropriate preload and proper tightening (torque or tension) The preventive actions program of the LRA AMP basis document states, in part:
o  The program is a condition monitoring program and does not include guidance for the selection of bolting material, installation torque or tension, and use of lubricants and sealants. The program is supplemented by existing plant procedures to ensure that the selection of bolting material installation torque or tension, and the use of lubricants and sealants is appropriate for the intended purpose. These implementing procedures use the guidance contained in NUREG-1339 and in EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of bolting material, lubricant, and installation torque.
It is not clear if the above statements are consistent with the GALL Report AMP XI.S3 because although aspects of the above statement appear to be an enhancement to the existing code-based condition monitoring (only) program, there is an apparent lack of a procedural link between the AMP implementing procedures and the existing plant procedures being credited to supplement the
AMP. The staff also noted that this is a common issue across B.1.16 Inservice Inspection - IWF AMPs and B.1.6 Containment Inservice Inspection - IWE.
* The preventive actions program element of GALL Report AMP XI.S3 states, in part:
o  If the structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication Specification for Structural Joints Using ASTM A325 or A490 Bolts, need to be considered.
The related enhancement to the LRA AMP preventive actions program element, which is intended to achieve consistency with the GALL Report, states: Revise plant procedures to include the preventive actions for storage of ASTM A325, ASTM F1852 and A490 bolting from Section 2 of Research Council for Structural Connections publication, Specification for Structural Joints Using ASTM A325 or A490 Bolts. This enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and the related justification provided in the AMP basis document. Not including provisions consistent with the recommendations for lubricants and stress corrosion cracking potential appears to interpret the standard in a manner that is inconsistent with the intent of the GALL Report AMP. It is not clear whether the applicants enhancement is adequate to make the LRA AMP consistent with the GALL Report AMP XI.S3. The staff also noted that this is a common issue across B.1.6, Containment Inservice Inspection - IWE; B.1.16, Inservice Inspection - IWF; and B.1.38, Structures Monitoring AMPs.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion was identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.
* GALL Report AMP XI.S3 states that MoS2 should not be used as a lubricant due to its potential contribution to SCC, especially for high-strength bolts. The GALL Report also states that the applicant should evaluate applicable operating experience to support the conclusion that the effects of aging are adequately managed. LRA Section B.1.16 and supporting procedures, consistent with the GALL Report AMP XI.S3, state that [p]lant procedures prohibit the use of lubricants containing MoS2 and specify to follow the recommendations in NUREG-1339, EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of lubricants for bolting. During its onsite audit, the staff confirmed that although the referenced bolting procedures were revised to prohibit the use of MoS2, it is not clear whether MoS2 lubricants have ever been used at Waterford 3. If so, additional information is necessary to resolve potential aging effects associated with the use of MoS2 in structural bolting. The staff also noted that this issue is common across B.1.1, Bolting Integrity, and B.1.16, Inservice Inspection - IWF AMPs.
* ASME Section XI, Subsection IWF states that to the extent practical, the same supports selected for examination during the first inspection interval shall be examined during each successive inspection interval. During the audit, the staff reviewed operating experience and found the following:
o  For component supports and/or related hardware examined during IWF sampling inspections, degraded conditions were found that although acceptable-as-is, the components were re-worked/repaired to as-new condition. Since it was determined that the as-found condition did not affect the supports capability to perform its design function or exceed the threshold of ASME Section IWF-3400, Acceptance Criteria, the applicant determined the actions associated with ASME Sections IWF-2420, Successive Inspections, and IWF-2430, Additional Examinations, criteria were not required and thus did not apply those Code provisions.
o  Component supports and/or related hardware were identified where degraded conditions were identified and re-worked/repaired as the result of walkdowns or other activities and not directly tied to an ISI-IWF inspection. However, the staff did not find evidence of an evaluation to determine whether the supports repaired were supports that were part of the sample periodically inspected by the ISI-IWF program. Conferencing with the applicant during the onsite audit indicated that such a process to identify whether repaired component supports are in the IWF inspection sample may not exist.
Given that the program will manage aging of the entire ASME Code component support population through inspections of a representative population, any ISI-IWF sampled support that is re-worked to as-new condition would no longer be representative of other supports in the IWF component support population. Subsequent ISI-IWF inspections of the same sample may not represent the age-related degradation of the remaining population. The applicants LRA and associated basis documents do not provide a discussion of how this issue is addressed in the AMP, or if the current processes consider expansion or change of the ASME-based IWF sample if a component support and/or related hardware within the IWF sample were re-worked. In addition, it is not clear whether a re-worked component support that is part of the ISI-IWF sample but not identified through the ASME ISI-IWF inspection, (but rather via a walkdown, other program, or some other means), would continue to be included in the ISI-IWF AMP program sample. As a result, it is not clear how the program will ensure that the component support inspection sample reflects the age-related degradation of the remaining population of IWF supports that are not inspected.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S3. The staff also identified certain aspects of the preventive actions, parameters monitored or inspected, and detection of aging effects, program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Summary of Information in the Application. The LRA states that AMP B.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling)
Handling Systems. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of selected cranes, including the fuel handling building bridge crane, auxiliary monorail cranes, the turbine building gantry crane, and the steam generator feed water pumps (Kranco) crane. The staff also conducted an independent search of the applicants operating experience database with focus on cranes, using the keywords: corrosion, bolt, and wear.
The table below lists documents and drawings that were reviewed by the staff and were found relevant to the audit. These documents and drawings were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                      Revision/Date
: 1. WF3-CS-14-00001        Aging Management Review of the Reactor Building          Revision 1, 12/03/2015
: 2. WF3-CS-14-00002        Aging Management Review of the Nuclear Island Structure  Revision 1, 12/03/2015
: 3. WF3-CS-14-00003        Aging Management Review of the Turbine Building and Other Revision 1, Structure                                                12/03/2015
: 4. WF3-EP-14-00008        Aging Management Program Evaluation                      Revision 1, Results-Civil/Structural.                                12/03/2015
: 5. ME-004-401            Fuel Handling Building Crane PM                          Revision 007, 10/20/2011
: 6. MM-004-201            Containment Building Polar Crane PM                      Revision 303, 12/18/2008
: 7. MM-004-870            Kranco Overhead Cranes PM                                Revision 301, 02/20/2008
: 8. MM-004-877            Containment Building Auxiliary Pedestal Crane PM          Revision 302, 09/20/2012
: 9. CR-WF3-2014-01628      Polar Crane, Rail Clamp Hold Down Bolt Broken            04/14/2014
: 10. CR-WF3-2009-02108      Rust, Dirt, Foreign Material on Trolley and Bridge, Fuel 05/05/2009 Handling Building
Document                                        Title                              Revision/Date
: 11. EN-LI-102              Corrective Action Program                                      Revision 24, 09/05/2014
: 12. WF3-QA                  Entergy, Quality Assurance Program Manual                      Revision 29, 12/01/2014
: 13. MM-007-002              Crane and Hoist Inspection and Testing                        Revision 009, 04/18/2013
: 14. EBASCO Project ID      EBASCO Specification 503-70, Fuel Handling Building Bridge    09/27/1983 LOU-1564.721                Crane, Seismic Category I
: 15. CR-WF3-2007-03574      Missing Bolt, Polar Crane                                      10/10/2007
: 16. CR-WF3-2011-00215      Rust Forming on Trolley Rail Supports, Turbine Building Gantry 01/13/2011 Crane
: 17. EBASCO Project ID      EBASCO Specification 503-70, Reactor Circular Bridge Crane,    Revision 9, LOU-1564.720                Seismic Class I                                                03/13/1990
: 18. DWG-U-76742            (Turbine Building Crane) Gantry Leg Details - Whiting        Revision 2, Corporation                                                  03/30/1977
: 19. DWG-U-70861            (Turbine Building Crane) Genl Arrgt of one 4-Motor Gantry  Revision 4, Bridge Front Elevation-Whiting Corporation                    04/25/1977
: 20. WF3-EP-14-00003        Operating Experience Review Results - Aging Management        Revision 0, Program Effectiveness                                          11/30/2015
: 21. LO-WLO-2004-00033      Snapshot Assessment on Large Crane System Health              06/07/2004
: 22. EBASCO Project ID      EBASCO Specification 503-70, Turbine Building Gantry Crane,    Revision 3, LOU-1564.722                Seismic Category II                                            11/15/1978
: 23. EBASCO Project ID      EBASCO Specification 503-70, Miscellaneous Bridge Cranes,      Revision 4, LOU-1564.729A              Seismic Category I and II                                      04/01/1983
: 24. License Renewal        Waterford Steam Electric Station, Unit 3, Facility Operating  March 2016 Application                License NPF-38 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below:
* Table 3.0-1, FSAR Supplement for Aging Management of Applicable Systems, of the SRP-LR outlines the FSAR description for an AMP to be consistent with GALL Report
AMP XI.M23 FSAR. The SRP-LR states, [t]he number and magnitude of lifts made by the hoist or crane are also reviewed. The staff noted that the FSAR of LRA AMP B.1.17, LRA Section A.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Program, does not address the number of lifts made for the scoped-in hoists or cranes. It is not clear how the applicant intends to meet the FSAR acceptance criteria for the GALL Report AMP XI.M23 as outlined in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements of the GALL Report AMP XI.M23. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.18, Internal Surfaces in Miscellaneous Piping and Ducting Components Summary of Information in the Application. The LRA states that AMP B.1.18, Internal Surfaces in Miscellaneous Piping and Ducting Components, is a new program that will be consistent with the program elements in GALL Report AMP XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP.
At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: biofoul, crack, wall loss, through wall, piping, foul, leak, and loss of material.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results Non-Class 1    Revision 0 Mechanical Systems
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit, the staff made the following observation on a relevant AMR item:
* LRA Table 3.3.2-15-29, Radiation Monitoring System, Nonsafety-Related Components Affecting Safety-Related Systems, states that aluminum filter housings exposed to waste water will be managed for loss of material using the Internal Surfaces In Miscellaneous Piping and Ducting Components program. The staff noted during a breakout session with the applicant that (1) cracking due to SCC is known to occur in high- and moderate-strength aluminum alloys; (2) halide concentrations should generally be considered high enough to facilitate cracking due to SCC of aluminum alloys in waste water unless demonstrated otherwise; and (3) depending on the specific aluminum alloy used for the filter housings, the aging effect of cracking due to SCC may be applicable.
The staff will consider issuing an RAI to request the basis for why cracking due to SCC is not an applicable aging effect for aluminum filter housings exposed to waste water.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2012-02.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M38, as modified by LR-ISG-2012-02.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2012-02.
LRA AMP B.1.19, Masonry Wall Summary of Information in the Application. The LRA states that AMP B.1.19, Masonry Walls, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S5, Masonry Walls. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP.
The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the nuclear reactor auxiliary building, fuel handling building, and turbine building. The staff also conducted an independent search of the applicants operating experience database using keywords: masonry, block, crack, and concrete.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00008      Aging Management Program Evaluation Report Civil/Structural Revision 1
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
: 3. EN-DC-150            Condition Monitoring of Maintenance Structures              Revision 6, 11/21/2013
: 4. W-CS-2003-001-00      Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 10/09/2003
: 5. WF3-CS-11-00001      Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 01/12/2011
: 6. WF3-CS-16-00006      Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 05/11/2016 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing programs modified by the proposed enhancements.
During the audit, the staff verified that the preventive actions and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the scope of program, parameters monitored or inspected, detection of aging effects, and acceptance criteria program elements not associated with the enhancement identified in the LRA or by the staff during the audit are consistent with the corresponding program elements in the GALL Report AMP. The staffs evaluation of aspects of these program elements associated with the enhancements will be addressed in the SER.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the preventive actions and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S5. The staff also verified that for the scope of program, parameters monitored or inspected, detection of aging effects, and acceptance criteria program elements, the aspects of the LRA AMP program elements not associated with the enhancements are consistent with the corresponding program elements in GALL Report AMP XI.S5. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.20, Metal Enclosed Bus Inspection Summary of Information in the Application. The LRA states that AMP B.1.20, Metal Enclosed Bus Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.E4, Metal Enclosed Bus Program. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document as well as the relevant operating experience.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the 4 kV and 6.9 kV switchgear, 230 kV transmission switchyard, transformer yard, 230 kV switching station, fire pump house, water treatment building, auxiliary building, and electrical penetration area. The staff also conducted an independent search of the applicants operating experience database using the keywords: MEB, cable bus, electrical bus, enclosed bus, connections, and metal enclosed bus.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                                Revision/Date
: 1. WF3-EE14-00001        Electrical Screening and Aging Management Review                    Revision 1, 02/01/2016
: 2. WF3-EP-14-00002      Operating Experience Review Results - AERM                          Revision 0, 09/13/2015
: 3. WF3-EP-14-00003      Operating Experience Review Results - Aging Management              Revision 0, Program Effectiveness                                              11/30/2015
: 4. WF3-EP-14-00009      Aging Management Program Evaluation Results - Electrical            Revision 1, 02/01/2016
: 5. CR-WF3-2014-01170    Condition Report (while performing quarterly thermography, hot      Revision 0, spots were located on the insulator of generator output breaker    04/14/2014 cable connections)
: 6. CR-WF3-2008-02028    Condition Report (Isophase bus duct lead box housing contains      Revision 0, a 9-inch long crack in the metal sidewall near the ceiling support) 05/12/2008
: 7. EN-DC-349            Metal Enclosed Bus Inspection Procedure                            Revision 3 11/21/2013
: 8. EN-DC-310            Predictive Maintenance Program (Thermography)                      Revision 7, 06/11/2015
: 9. EN-FAP-LR-026        License Renewal Non-EQ Electrical Cable Connection AMP              Revision 4, 10/30/2014 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the
applicant has opted to include MEB enclosure assembly external surfaces inspection in this AMP instead of the structures monitoring program.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The review of a sample of work orders did not find any significant or unusual operating experience and no previously unknown or recurring aging effects were identified by the applicant or staff.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E4.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.21, Neutron-Absorbing Material Monitoring Summary of Information in the Application. The LRA states that AMP B.1.21, Neutron-Absorbing Material Monitoring, is an existing program with enhancement that will be consistent with the program elements in GALL Report AMP XI.M40, Monitoring of Neutron-Absorbing Materials Other than Boraflex. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancement associated with this AMP. The enhancement is evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: loss of attenuation, degradation of neutron-absorbing capacity, blisters, pits, and bulges.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. CR-WF3-2014-        Boral Coupon Scheduling Issue                                11/09/2014 05222
: 2. CR-WF3-2016-        Change to Periodicity for Testing to Meet XI.M40              06/15/2016 03932
: 3. HPP-60994-9          Physical Properties Measurement Procedures Boral Surveillance Revision 1, Coupons for Waterford 3 Spent Fuel Racks, Holtec Project      05/04/1998 Procedure
Document                                        Title                          Revision/Date
: 4. HPP-60994-9A        Boral Surveillance Program for Waterford Unit 3 Spent Fuel  Revision 2 Racks
: 5. NE-001-106          SFSR Boral Surveillance Program                              Revision 4
: 6. NET-191-01          Inspection and Testing of Boraflex and Boral Surveillance    11/27/2001 Coupons from Arkansas Nuclear One, Grand Gulf, and Waterford Stations
: 7. NET-28040-01        Inspection and Testing of Boraflex and Boral Surveillance    10/05/2010 Coupons from Arkansas Nuclear One, Grand Gulf, and Waterford Stations
: 8. SEP-191-02, NETCO    Procedures for Measuring and Recording Boral Surveillance    10/14/1994 Coupon Physical Attributes The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.
During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M40.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.22, Nickel Alloy Inspection Summary of Information in the Application. The LRA states that AMP B.1.22, Nickel Alloy Inspection, is an existing program that is consistent with the program elements in GALL Report AMP XI.M11B, Cracking of Nickel-Alloy Components and Loss of Material Due to Boric Acid-Induced Corrosion in Reactor Coolant Pressure Boundary Components (PWRs only). To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: CRDM, reactor vessel, vessel head, nozzle, penetration, weld, stress corrosion, thermal sleeve, and PWSCC.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document and Number                                  Title                              Revision/Date
: 1. LRA, Appendix B,    Nickel Alloy Inspection                                        Revision 0, Section B.1.22                                                                        3/23/2016
: 2. LRA, Appendix A,    Nickel Alloy Inspection (FSAR Supplement)                      Revision 0, Section B.1.22                                                                        3/23/2016
: 3. WF3-EP-14-00003      WF3 License Renewal Project - Operating Experience Review      Revision 0 Results - Aging Management Program Effectiveness (pages 70-75)
: 4. NOECP-107            Boric Acid Corrosion Control Program                          Revision 003, 7/13/2009
: 5. SEP-A600-001        Entergy Nuclear South, Alloy 600 Management Program            Revision 0, 7/25/2006
: 6. SEP-ISI-104          Program Section for ASME Section XI, Division 1, Inservice    Revision 002, Inspection Program                                            3/12/2014
: 7. Program Plan        Waterford 3 Steam Electric Station, Inconel Alloy 600 Program  Revision 1, Plan                                                          6/6/2001
: 8. WF3-ME-14-00003      WF3 License Renewal Project - Aging Management Review of      Revision 1, the Reactor Coolant System and Pressurizer                    9/13/2015
: 9. WF3-EP-14-00006      Waterford 3 License Renewal Project - Aging Management        Revision 0 Program Evaluation Results - Class 1 Mechanical, Section 4.1, Nickel Alloy Inspection Program
: 10. Program Owner Book  Waterford 3 Nuclear Plant, B.1.22 Nickel Alloy Inspection      Revision 0 Program Book
: 11. CR-WF3-2008-02001  Condition Report - Alloy 600 Project - Loop 1 Shutdown        5/5/2008 Cooling Nozzle Leakage
: 12. CR-WF3-2009-05822  Condition Report - NRC Concern with Boric Acid Leakage in      10/27/2009 the No. 2B Reactor Coolant Pump
: 13. CR-WF3-2005-01449  Condition Report - Pressurizer Heater Sleeve Leakage          4/19/2005
: 14. CR-WF3-2004-00839  Condition Report - Issuance of NRC Non-Cited Violation for    3/18/2004 Failure To Implement Effective Corrective Actions in Recurring Reactor Coolant Pressure Boundary Leakage in Nickel Alloy 600 Reactor Coolant System Nozzles
: 15. CR-WF3-2012-00927  Condition Report - Update of Current Licensing Basis to        2/22/2012 Implement ASME Code Case N-729-1 for Nickel Alloy Penetration Nozzles in the Upper Reactor Vessel Head in Replacement of Previous Requirements for These Components in NRC Order EA-03-009
: 16. CR-WF3-2012-07261  Condition Report - Implementation of ASME Code                12/6/2016 Case N-770-1 for Dissimilar Metal Welds in the RCS Cold Leg
                        - Including Submittal of NRC Relief Request for Limiting Ultrasonic Testing Coverage for These Components
: 17. ASME Code          Alternative Examination Requirements for PWR Reactor          3/28/2006 Case N-729-1            Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration Welds, Section XI, Division 1
Document and Number                                      Title                              Revision/Date
: 18. ASME Code              Additional Examinations for PWR Pressure Retaining Welds in      1/26/2009 Case N-722-1              Class 1 Components Fabricated with Alloy 600/82/182 Materials, Section XI, Division 1
: 19. ASME Code              Alternative Examination Requirements and Acceptance              12/25/2009 Case N-770-1              Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material with or without Application of Listed Mitigation Activities, Section XI, Division 1 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program.
During the audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that, for the scope of program, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff conducted its review during the audit as follows:
* During the audit of the scope of program, parameters monitored or inspected, and detection of aging effects program elements, the staff noted that the scope of the program is limited only to nickel alloy components in the reactor coolant pressure boundary (RCPB) made of Alloy 600 base metal material or Alloy 600 type weld filler materials (i.e., Alloy 82, 182 and 82/182 weld materials). The staff also observed that the scope of the AMP does not include any components in the RCPB made from Alloy 690 base metal material or Alloy 690 type weld materials (i.e., Alloy 52, 152, and 52/152 weld materials including Alloy 600 components or Alloy 82/182 weld components mitigated with Alloy 690 half-nozzle repairs or Alloy 52/152 weld overlays). The staff further noted that this limits the scope of the program only to non-repaired or non-mitigated nickel alloy components in the reactor coolant system (RCS) cold legs.
The program does not include the nickel alloy penetration nozzles in the replaced upper reactor vessel closure head (RVCH), or the nickel alloy components (including weld components) RCS hot leg loops, pressurizer or steam generators that were repaired with either half nozzle or weld overlay repair designs (which use Alloy 690 base metal or Alloy 52, 152, or 52/152 weld materials).
In addition, the staff observed that, if the applicants AMP is evaluated by itself, the Nickel Alloy Inspection AMP would identify exceptions to scope of program, parameters monitored or inspected, and detection of aging effects elements of GALL Report AMP XI.M11B because the program would not implement the following augmented inspections: (a) augmented inspections of the nickel alloy penetration nozzles in the replaced upper reactor vessel head (made of Alloy 690 type materials), as subjected to the requirements in 10 CFR 50.55a(g)(6)(ii)(D) and ASME Code Case N-729-1, and (b) augmented inspections of nickel alloy components in the RCS cold leg loops, steam generators, and pressurizer that have been repaired or mitigated with either weld-overlay or half nozzle repairs, as subject to the requirements in 10 CFR 50.55a(g)(6)(ii)(F) and ASME Code Case N-770-1.
However, the staff also observed that the applicant implements the appropriate inspections of these components in accordance with the program element criteria for LRA AMP XI.M1, Inservice Inspection Program, which includes programmatic activities to implement the augmented inspection requirements in the following ASME Code Cases, as required by 10 CFR 50.55a: (a) ASME Code Case N-729-1 for inspections of the nickel alloy penetration nozzles in the upper RVCH, (b) ASME Code Case N-722-1 for performing bare metal visual examinations for boric acid leakage around RCPB base metal components made from Alloy 600 or weld components made from Alloy 82 or 182 weld filler metal materials, and (c) ASME Code Case N-770-1 for performing ultrasonic tests on piping components in the RCPB made from Alloy 600 base metal material or Alloy 82 or 182 weld material, including those that have been repaired or mitigated with Alloy 52 or 152 weld overlays, onlays, or inlays.
During the audit, the applicant informed the staff that the implementation of LRA AMP B.1.2, Boric Acid Corrosion Program, performs boric acid leakage inspections of nickel alloy components in the RCPB, including those component locations that had been repaired, replaced, or mitigated with Alloy 690 base metal material or Alloy 52, 152, or 52/152 weld filler materials.
During the audit, the staff determined that, when the program elements of the Nickel Alloy Inspection Program (LRA AMP B.1.22) are taken into account with the program elements of the Inservice Inspection Program (LRA AMP B.1.15) and Boric Acid Corrosion Program (LRA AMP B.1.2), the scope of program, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the Nickel Alloy Inspection Program are consistent with those in GALL Report AMP XI.M11B. Therefore, this issue is resolved.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The staff reviewed a number of condition reports associated with this AMP indicating that the applicant has experienced a number of reactor coolant leaks in nickel alloy RCPB components (e.g., penetration nozzles welded to the upper RVCH, nickel alloy instrumentation nozzles in the RCS hot leg loops and pressurizer, and pressurizer heater sleeves). In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff assessed the following operating experience topics discussed below.
* The staff observed that, in general, the applicant has been appropriately implementing its inspections of nickel alloy component locations in the RCPB in accordance with the augmented inspection requirements and applicable ASME Code Case criteria in accordance with 10 CFR 50.55a. The staff also observed that the applicant has been using its condition report and corrective action program process to repair, replace, or mitigate the RCPB components that experienced leakage. The staff verified that any delays in implementing corrective actions to repair leaking components have been appropriately addressed by the NRCs regional inspection staff that are responsible for reactor oversight of Waterford Unit 3 and corrected by the applicant. The staff also verified that the applicants corrective actions process includes appropriate measures to address and resolve issues identified by the applicant and the NRC Regional Office with respect to this AMP.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that, when implementation of LRA AMP B.1.22, Nickel Alloy Inspection Program, is taken into account with implementation of the program elements of LRA AMP B.1.15, Inservice Inspection Program, and AMP B.1.2, Boric Acid Corrosion Program, the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of LRA AMP B.1.22, Nickel Alloy Inspection, are consistent with the corresponding program elements in GALL Report AMP XI.M11B. Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.23, Non-EQ Electrical Cable Connections Summary of Information in the Application. The LRA states that AMP B.1.23, Non-EQ Electrical Connections, is a new program that will be consistent with the program elements in GALL Report AMP XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirement. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the 4 kV and 6.9 kV switchgear, 230 kV transmission switchyard, transformer yard, 230 kV switching station, fire pump house, water treatment building, auxiliary building, and electrical penetration area. The staff also conducted an independent search of the applicants operating experience database using the keywords: connections, thermography, loose connection, and electrical bus.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                              Revision/Date
: 1. WF3-EP-14-00009      Aging Management Program Evaluation Results - Electrical        Revision 1, 02/01/2016
: 2. CR-WF3-2014-01170    Condition Report (while performing quarterly thermography, hot  Revision 0, spots were located on the insulator of generator output breaker 04/14/2014 cable connections)
: 3. EN-DC-310            Predictive Maintenance Program (Thermography)                  Revision 7, 06/11/2015
: 4. ME-004-809            Low/Medium Voltage Power and Control Cable/Conductor            Revision 306, Terminations and Splices                                        11/06/2015
: 5. WF3-EP-14-00003      Operating Experience Review Results - Aging Management          Revision 0, Program Effectiveness                                          11/30/2015
Document                                        Title                        Revision/Date
: 6. WF3-EE14-00001      Electrical Screening and Aging Management Review          Revision 1, 02/01/2016
: 7. EN-FAP-LR-026        License Renewal Non-EQ Electrical Cable Connection AMP    Revision 4, 10/30/2014
: 8. WF3-EP-14-00002      Operating Experience Review Results - AERM                Revision 0, 09/13/2015 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the applicant has opted to exclude visual inspection as an alternative method of monitoring electrical connections per the detection of aging effects element as described in the GALL Report.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The review of a sample of work orders did not find any significant or unusual operating experience and no previously unknown or recurring aging effects were identified by the applicant or staff.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E6.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.24, Non-EQ Inaccessible Power Cables (> 400 V)
Summary of Information in the Application. The LRA states that AMP B.1.24, Non-EQ Inaccessible Power Cables ( 400 V) program, is a new program with exception that will be consistent with the program elements in GALL Report AMP XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the exception associated with this AMP. The exception to the GALL Report AMP is evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fire pump house, water treatment building, turbine building, and locations for manholes M308-NA, M328-NAB, and M329-NAB; and hand holes H331-NA and H330-NAB. The staff also conducted an independent search of the applicants operating experience database using keywords: cable, jacket, arcing, thermal, connection, contamination, discoloration, swelling, insulation, vault, manhole, submerged, and moisture.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. 3/CA/31322A          Summary - CA Cable 31322A As-Built                          N/A
: 2. 3/CA/31323D          Summary - CA Cable 31323D As-Built                          N/A
: 3. 3/CA/31322H          Summary - CA Cable 31322H As-Built                          N/A
: 4. WF3-EP-14-00009      Aging Management Program Evaluation Results - Electrical    Revision 1, 2/1/2016
: 5. WF3-EP-14-00003      Operating Experience Results - Aging Management Program    Revision 0, Effectiveness                                              11/30/2015
: 6. WF3-EE-14-00001      Electrical Screening and Aging Management Review            Revision 1, 2/16/2016
: 7. C349                Yard Duct Runs and Outdoor Lighting                        Revision 20, 3/19/2015
: 8. WF3-EP-14-00002      Operating Review Results AERM                              Revision 0, 9/13/2015
: 9. W3F1-2007-0065      Response to NRC RAI on GL 2007-01, Inaccessible or        12/18/2007 Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
: 10. W3F1-2007-0017      Response to GL 2007-01                                      5/3/2007
: 11. EN-DC-346          Cable Reliability Program                                  Revision 7 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the new program as modified by the proposed exception.
During the audit, the staff verified that the scope of program, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the preventive actions program element not associated with the exception identified in the LRA are consistent with the corresponding program elements in the GALL Report AMP. The staffs evaluation of aspects of this program element associated with the exception will be addressed in the SER.
In order to verify that with the exception, the LRA AMP will remain adequate to manage the applicable aging effects, staff will consider issuing an RAI for the subject discussed below.
* The applicant stated that periodic manhole inspections will be performed to assess that cable and cable support structures are intact, but the inspection frequency will not be increased if water is found in the manholes during the inspections. The applicant further stated that because of the elevation of the plant site and manholes, water cannot be prevented from entering the manholes. The applicant concluded that manhole inspections will assess cable and support damage because of exposure to significant moisture, and periodic testing will provide reasonable assurance that each cable will continue to perform its intended function through the period of extended operation. The in-scope inaccessible cables identified by the applicant are the 480V electric motor-driven fire pump and the electric motor-driven jockey fire pump.
The GALL Report AMP XI.E3 program element preventive actions recommends that periodic actions are taken to prevent inaccessible cables from being exposed to significant moisture, such as identifying and inspecting in-scope accessible cable conduit ends and cable manholes for water collection, and draining the water, as needed. In addition, GALL Report AMP XI.E3 also recommends that the inspection frequency for water collection is established and performed based on plant-specific operating experience with cable wetting or submergence in manholes (i.e., the inspection is performed periodically based on water accumulation over time and event-driven occurrences, such as heavy rain or flooding). GALL Report AMP XI.E3 further recommends that If water is found during inspection (i.e., cable exposed to significant moisture), corrective actions are taken to keep the cable dry and to assess cable degradation.
It is not clear to the staff that the inaccessible power cables supplying the electric motor-driven fire pump and electric motor-driven jockey fire pump, when subjected to significant moisture for extended periods, will continue to perform their intended function during the period of extended operation.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description, not associated with the exception, is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E3. The staff also verified that for the preventive actions program element, the aspects of the LRA AMP program element not associated with the exception are consistent with the corresponding program element in GALL Report AMP XI.E3.
The staffs evaluation of aspects of the program element associated with the exception will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement, not associated with the exception, is consistent with the description provided in the SRP-LR.
LRA AMP B.1.25, Non-EQ Sensitive Instrumentation Circuits Test Review Summary of Information in the Application. The LRA states that AMP B.1.25, Non-EQ Sensitive Instrumentation Circuits Test Review, is a new program that will be consistent with the program elements in GALL Report AMP XI.E2, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the AMP program elements described in the applicants basis document, referenced supporting documentation, and relevant plant-specific operating experience.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns that included viewing an area radiation monitor in the control room annulus. The staff also conducted an independent search of the applicants operating experience database using the keywords: excore, high range rad, containment rad, containment area monitor, ENIINFD000, neutron flux, neutron flux detector, PRMIRE7050, ARMIRD, radiation monitor, and shield wall.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                            Revision/Date
: 1. WF3-EE-14-00003      Operating Experience Review Results - Aging Management        Revision 0, Program Effectiveness                                          11/30/2015
: 2. WF3-EE-14-00001      Electrical Screening and Aging Management Review              Revision 1, 02/01/2016
: 3. WF3-EP-14-00002      Operating Experience Review Results - Aging Effects Requiring  Revision 0, Management (AERM)                                              09/13/2015
: 3. WF3-EE-14-00009      Aging Management Program Evaluation Results - Electrical      Revision 1, 02/01/2016
: 4. MI-003-101          NI Linear Power Channel Calibration Safety Channel A, B, C, or Revision 014, D                                                              08/28/2014
: 5. EN-FAP-LR-027        License Renewal Sensitive Instrumentation Circuits Review AMP  Revision 1, 11/21/2013
: 6. MI-005-919          Containment Post LOCA Area Radiation Monitor Safety Channel    Revision 303, A or B Calibration ARMIR5028, 5029, 5030, 5031                08/07/2014
: 7. MI-003-102          NI Log Power Channel Calibration Safety Channel A, B, C, and D Revision 311, 11/15/2014
Document                                        Title                              Revision/Date
: 8. MI-003-352          Purge Isolation Area Radiation Monitor Safety Channel            Revision 302, Calibration ARMIR5024, ARMIR5025, ARMIR5026, or                  06/26/2014 ARMIR5027
: 9. MI-003-365          Fuel Handling Building Ventilation Monitor Safety Channel A or B Revision 6, Calibration ARMIR0300.1, ARMIR0300.2, ARMIR0300.3, or            09/26/2006 ARMIR0300.4
: 10. MI-003-371          Fuel Handling Building Ventilation System Emergency Exhaust      Revision 308, High Range Noble Gas Radiation Monitor Channel Calibration      04/15/2014 PRMIR3032
: 11. MI-003-374          Control Room Outside Air Intake Isolation Radiation Monitor      09/17/2013 Channel Calibration ARMIR0200 1, 2, 5, and 6
: 12. MI-003-391          Component Cooling Water System A or Liquid Radiation Monitor    Revision 307, Channel Calibration PRMIR7050 A or B                            03/25/2014 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E2, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.26, Non-EQ Insulated Cables and Connections Summary of Information in the Application. The LRA states that AMP B.1.26, Non-EQ Insulated Cables and Connections Program, is a new program that will be consistent with the program elements in GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant, including corrective actions, work orders, procedures, and surveillance documentation. In addition, the staff conducted walkdowns of the water treatment building, turbine building, fire pump house, transformer yard, switchgear, and electrical penetrations. The staff also conducted an independent search of the applicants operating experience database using the keywords: cable, jacket, arching, thermal, connection, contamination, discoloration, swelling, insulation, and moisture.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00009      Aging Management Program Evaluation Results - Electrical    Revision 1, 02/01/2016
: 2. EN-DC-348            Non-EQ Insulated Cables and Connection Inspection          Revision 5
: 3. WF3-EP-14-00003      Operating Experience Results - Aging Management Program    Revision 0, Effectiveness                                              11/30/2016
: 4. Work Order          Replace RCP 2B Motor Cables                                11/9/2009 00135468
: 5. EN-WM-105            Work Order 135468-01 Equipment RC EMTR1B-8A -              02/03/2007 Maintenance Support
: 6. WF3-EE-14-00001      Electrical Screening and Aging Management Review            Revision 1, 02/16/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the parameters monitored or inspected program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
* WF3-EP-14-00009, Aging Program Evaluation Results, Electrical, Section 3.5.B.3.b, Comparison to WF3 Parameters Monitored or Inspected states that a representative sample of accessible insulated cables and connections within the scope of license renewal will be visually inspected for cable and connection jacket and connection insulation surface anomalies indicating signs of reduced insulation resistance. This sample of accessible cables will represent, with reasonable assurance, all cables and connections in an adverse localized environment.
The use of a representative sample of accessible insulated cable and connections as described in WF3-EP-14-00009 does not agree with the applicants LRA AMP or GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements. Instead, the applicants LRA AMP recommends visual inspection of all accessible insulated cables and connections and
GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements, recommends visual inspection of accessible insulated cables and connections as an acceptable component sampling approach.
It is not clear to the staff that the applicants Non-EQ Insulated Cables and Connections Program will be consistent with the GALL Report because the applicants aging management program evaluation for the parameters monitored or inspected program element describes the applicants program as inspecting a sample of accessible insulated cables and connections rather than inspecting all accessible cables and connections, as recommended in the GALL Report.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. No previously unknown or recurring aging effects were identified by the applicant or staff.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X1.E1, Non-EQ Insulated Cables and Connections Program. The staff also identified certain aspects of the parameters monitored or inspected program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.27, Oil Analysis Summary of Information in the Application. The LRA states that AMP B.1.27, Oil Analysis Program, is an existing program that is consistent with the program elements in GALL Report AMP XI.M39, Lubricating Oil Analysis. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: lubricating, oil, and samples.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                          Revision/Date
: 1. WF3-EP-14-00007        Aging Management Program Evaluation Results - Non-Class 1    Revision 0 Mechanical
: 2. WF3-EP-14-00003        Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
: 3. EN-CY-103              Diesel Fuel, Lubricating Oil, and Grease Analytical Services Revision 0
: 4. EN-DC-310              Predictive Maintenance Program                              Revision 6
: 5. EN-LI-102              Corrective Action Program                                    Revision 24
: 6. EN-LI-121              Trending and Performance Review Process                      Revision 17
: 7. UNT-005-007            Safety Related Procedures                                    Revision 304
: 8. CR-WF3-2013-05537      Oil Analysis of ACCEMTR3b 6, Auxiliary Component Cooling    11/13/2013 Water Pump A Motor
: 9. CR-WF3-2006-02278      Oil Analysis Results                                        08/08/2006
: 10. CR-WF3-2012-02394      Oil Analysis Results                                        05/11/2012
: 11. Lube Comparison        Trending Results for Cooling Water Pump Oil                  07/13/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M39.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.28, One-Time Inspection Summary of Information in the Application. The LRA states that AMP B.1.28, One-Time Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.M32, One-Time Inspection. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements as described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: biological, buried, crack, and fouling.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results, Non-Class 1    Revision 0 Mechanical, One-Time Inspection
: 2. WF3-ME-14-00010      WF3 License Renewal Project: Aging Management Review of    Revision 1 the Fire Protection: Water System
: 3. Pure Technologies    Engineering Report: Condition Assessment of PCCP, Waterford 3/12/2013 US, Inc. Report          Unit 3 - 132-inch Cooling Water Discharge Line, D-2 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the acceptance criteria program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing RAIs for the subject discussed below.
* The acceptance criteria program element of the LRA AMP states that the program will verify that unacceptable loss of material or cracking is not occurring or is, so insignificant that a plant-specific aging management program is not warranted. The GALL Report AMP recommends any indication or relevant conditions of degradation detected are evaluated. It is not clear to the staff that these statements are consistent because the GALL Report recommends evaluating any indication while the AMP evaluates significant indications. It is unclear to the staff how the applicant will determine if an indication is significant.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.
* LRA Section B.1.28, One-Time Inspection, notes that the program will be used to verify that change in material properties, loss of material and cracking are not occurring for reinforced concrete portions of the circulating water intake piping exposed to raw water.
The GALL Report includes AMR items for concrete piping exposed to raw water and recommends XI.M20, Open-Cycle Cooling Water System, for managing the effects of aging of this material/environment combination. During the audit, the staff reviewed a report prepared by Pure Technologies US, Inc. summarizing a previous inspection
conducted on similar concrete piping in a 132-inch cooling water discharge line. The summary report noted that a majority of the pipe joints exhibited separation and/or spalling and recommended all pipeline joints be cleaned and mortared to prevent corrosion of the joint steel and potential leaks. The report also recommended a re-inspection of the pipeline in approximately 5 years. Based on the operating experience and the GALL Report recommendations, it is unclear to the staff why it is appropriate to manage the effects of aging on concrete portions of the circulating water intake piping exposed to raw water through the one-time inspection program.
The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI related to acceptance criteria as discussed above. If the response to the RAI leads to an update in the acceptance criteria, the FSAR supplement may need to be updated accordingly.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M32. The staff identified certain aspects of the acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined. In addition, the staff identified a corresponding need for additional information regarding the adequacy of the program description in the FSAR supplement.
Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP.
LRA AMP B.1.29, One-Time Inspection - Small-Bore Piping Summary of Information in the Application. The LRA states that AMP B.1.29, One-Time Inspection - Small-Bore Piping, is a new program that will be consistent with the program elements in GALL Report AMP XI.M35, One-Time Inspection of ASME Code Class 1 Small-Bore Piping. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: weld, cracking, crack, failure, socket, sockolet, weldolet, butt weld, thermal, fatigue, and leakage.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                        Revision/Date
: 1. WF3-EP-14-00006            Program Basis Document, Aging Management Program      Revision 1, Evaluation Results - Class 1 Mechanical One-Time    05/01/2013 Inspection - Small-Bore Piping
Document                                      Title                            Revision/Date
: 2. WF3-EP-14-00003              Operating Experience Review Results - Aging              Revision 0, Management Program Effectiveness                          11/30/2015
: 3. N/A                          Providing Class 1 Small Bore Piping Weld Population      07/28/2016
: 4. LER-382-2000-003            Shutdown Per TS LCO 3.0.3 due to Cracked Weld            04/05/2000
: 5. LER-382-2012-003            Cracked Instrumentation Line Affects Fire Protection Safe 11/16/2000 Shutdown Analysis
: 6. LER-382-2003-003            RCS Pressure Boundary Leak due to PWSCC                  12/18/2003 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
For the detection of aging effects program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
GALL Report AMP XI.M35 states under the detection of aging effects program element that [t]his inspection should be performed at a sufficient number of locations to ensure an adequate sample. This number, or sample size, is based on susceptibility, inspectability, dose considerations, operating experience, and limiting locations of the total population of ASME Code Class 1 small-bore piping locations. LRA Sections B.1.29 and A.1.29 do not provide the total number of in-scope small-bore piping welds. It is not clear to the staff how the inspection sample will be selected and thus whether a sufficient number of locations will be inspected to ensure that cracking will be adequately managed.
LRA Section B.1.29 states that volumetric examinations of butt welds (full penetration welds) using demonstrated techniques will be performed. There was insufficient information available during the audit for the staff to determine what constitutes a demonstrated technique for volumetric examinations of butt welds. The staff noted that, for butt weld inspections, there are well-established, qualified UT techniques and procedures with flaw-sizing capabilities available. The staff also noted that the applicant has previously performed UT examinations of butt welds using qualified techniques as part of its inservice inspection program. The staff will request clarification related to the examination of butt welds.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M35. The staff also identified certain aspects of the detection of aging effects program element of the LRA AMP for which additional information and evaluation are required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.30, Periodic Surveillance and Preventive Maintenance Summary of Information in the Application. The LRA states that AMP B.1.30, Periodic Surveillance and Preventive Maintenance, is a plant-specific program with enhancements that will be used to manage the aging of components that do not fall within the scope of other aging management programs. The staff reviewed the Periodic Surveillance and Preventive Maintenance program against the elements of an AMP for license renewal as described in SRP-LR, Revision 2, Section A.1.2.3. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, crack, wall loss, through wall, piping, foul, loss of material, leak, and wear.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results Non-Class 1    Revision 0 Mechanical Systems
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
: 3. WF3-ME-14-00007      Aging Management Review of the Plant Drains                Revision 0
: 4. WF3-ME-14-00019      Aging Management Review of the Control Room HVAC System    Revision 1
: 5. WF3-ME-14-00009      Aging Management Review of the Component Cooling Water and  Revision 1 Auxiliary Component Cooling Water Systems
: 6. WF3-ME-14-00008      Aging Management Review of the Emergency Generator System  Revision 1
: 7. ESSE-WM-309          Dry Cooling Tower A Portable Sump Pump                    Revision 0, 01/11/2000
: 8. OP-003-024          Sump Pump Operation                                        Revision 309 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements described in SRP-LR, Revision 2, Section A.1.2.3. In addition, the staff found that for the scope of program, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3, the staff will consider issuing RAIs for the subjects discussed below.
* The following impacts the scope of program program element. The program description table states that accumulators, filter housings, piping, pump casings, and valve bodies in the blowdown system will be managed for loss of material. However, LRA Table 3.4.2-5-1, Blowdown System, Nonsafety-Related Components Affecting Safety-Related Systems, also lists tanks. It is unclear to the staff if tanks in the blowdown system are included within the scope of the program.
* The following impacts the parameters monitored or inspected and detection of aging effects program elements. It is unclear to the staff if physical manipulation will be used to augment visual inspection of the elastomeric portable smoke-ejector duct in the control room HVAC system. The parameters monitored or inspected program element states that polymeric components are inspected for hardening as evidenced by loss of suppleness (i.e., physical manipulation). However, the program description table states that the inspection will consist of a visual inspection and the detection of aging effects program element states that established techniques such as visual inspections are used, indicating that physical manipulation will not be used to augment visual inspections. The proposed RAI would request clarification on this issue.
* The following impacts the detection of aging effects program element. LRA Table 3.3.2-7, Emergency Diesel Generator System, states that stainless steel expansion joints exposed to exhaust gas will be managed for cracking using the Periodic Surveillance and Preventive Maintenance program. The program description table in LRA Section B.1.30 states that the program inspection activity for the emergency generator system will be to monitor the surface condition of the expansion joint to verify the absence of cracking. It is unclear to the staff what inspection activities are included in monitoring the surface condition of the stainless steel expansion joints in order to verify the absence of cracking.
* The following impacts the detection of aging effects program element. LRA Table 3.3.2-7, Emergency Diesel Generator System, states that stainless steel heat exchanger tubes externally exposed to lubricating oil, fuel oil, and treated water will be managed for loss of material due to wear using the Periodic Surveillance and Preventive Maintenance program. The program description table in LRA Section B.1.30 states that a visual inspection of the surface condition of a representative sample of stainless steel heat exchanger tubes will be performed to manage loss of material due to wear.
Because access to the external surfaces of heat exchanger tubes is typically very limited because of tube spacing, tube supports, etc., it is unclear to the staff whether a visual inspection of the tubes external surfaces can be reasonably expected to detect loss of material due to wear.
* The following impacts the detection of aging effects program element. LRA Table 3.3.2-3, Component Cooling and Auxiliary Component Cooling Water System, states that aluminum heat exchanger fins and carbon steel heat exchanger tubes exposed to condensation will be managed for reduction of heat transfer using the Periodic Surveillance and Preventive Maintenance program and loss of material using the External Surfaces Monitoring program. However, the program description table states loss of material and reduction of heat transfer will be managed using the Periodic Surveillance and Preventive Maintenance program. It is unclear to the staff if loss of material will be managed using the External Surfaces Monitoring or Periodic Surveillance and Preventive Maintenance program. If loss of material for the fins and tubes will be managed by the Periodic Inspection and Preventive Maintenance program, then it is unclear to the staff how a visual inspection can detect loss of material of carbon steel heat exchanger tubes.
During the audit, the staff made the following observation:
* LRA Table 3.3.2-14, Plant Drains, states that the external surfaces of gray cast iron pump casings are exposed to air-outdoor and that the internal surfaces of gray cast iron pump casings are exposed to waste water. However, Engineering Report WF3-ME-14-00007, Aging Management Review of Plant Drains, states that Dry Cooling Tower Portable Sump Pump casings and foot valves made of gray cast iron are immersed in waste water. Aging effects for the external surfaces of these components are the same as those for the internal surfaces of the same material, exposed to the same environment. During a breakout session, the staff noted that it was unclear whether the external surfaces of the gray cast iron pump casings are exposed to air-outdoor or waste water. In response, the applicant provided drawing ESSE-WM-309, showing that the portable sump pump is located on the floor above the drain sump which is below the floor elevation. In addition, procedure OP-003-024, Section 11.9, provided images showing that the portable sump pumps were above the drain sump exposed to air.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3. The staff also identified certain aspects of the scope of program, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant provides objective evidence to support the conclusion that the effects of aging will be managed adequately so that the structure and component intended functions will be maintained during the period of extended operation as described in SRP-LR, Revision 2, Section A.1.2.3.10. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.31, Protective Coating Monitoring and Maintenance Summary of Information in the Application. The LRA states that AMP XI.S8, Protective Coating Monitoring and Maintenance Program, is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.S8, Protective Coating Monitoring and Maintenance Program. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an enhancement associated with this AMP. The enhancement is evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: degradation, loss of material, blister, flaking, and peeling.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                              Revision/Date
: 1. Commitment A8350        Evaluation of Containment Coatings                              02/27/1985
: 2. Commitment P26867      Response to GL 2004-02, Potential Impact of Debris Blockage of 09/16/2005 Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (Waterford 3)
: 3. CR-WF3-2005-            Coating Inspections of Service Level I Coatings in 2005        05/05/2005 02046
: 4. CR-WF3-2011-            Coating Inspections of Service Level I Coatings During RFO 17  04/25/2011 02987
: 5. CR-WF3-2015-            Coating Inspections of Service Level I Coatings During RFO 20  11/18/2015 08489
: 6. EN-DC-220              Safety-Related Coatings Program                                Revision 2
: 7. NOECP-451              Conducting Engineering Inspection of Reactor Containment        Revision 1 Building Protective Coatings
: 8. W3P86-2369              Implementation of Containment Coating Visual Inspections During 09/09/1986 Refueling Outages
: 9. W3P86-2720              Containment Coating Visual Inspections During Refueling        10/13/1986 Outages The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.
During the audit, the staff verified that the scope of program, preventive action, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects and acceptance criteria program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding
program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The scope of program program element of the LRA AMP states that the Protective Coating Monitoring and Maintenance Program manages the effects of aging on Service Level I coatings applied to external surfaces of carbon steel and concrete inside containment. The GALL Report AMP requires that the minimum scope of the program is Service Level I coatings applied to steel and concrete surfaces inside containment to minimize degradation of coatings that can lead to clogging of Emergency Core Cooling Systems (ECCS) suction strainers. This ensures operability of post-accident safety systems that rely on water recycled through the containment sump/drain system. It is not clear to the staff that these statements are consistent because the applicants inspection program documents do not specify the surfaces to be inspected. In addition, in response to GL 2004-02 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650616), the applicant described indeterminate coatings, which are considered failed coatings that transport completely to the sump.
Therefore, it is not clear to the staff how these indeterminate coatings are addressed in the applicants inspection program to effectively manage such coatings inside containment.
* The acceptance criteria program element of the LRA AMP states that the Protective Coating Monitoring and Maintenance Program meets the technical basis of ASTM D 5163-08 and provides an effective method to assess coating condition through visual inspections. The GALL Report AMP recommends additional ASTM and other recognized test methods, in addition to visual inspections, for use in characterizing the severity of observed defects and deficiencies. It is not clear to the staff that these statements are consistent since it appears that the applicant has not performed additional tests (e.g., adhesion tests) to properly bound degradation of Service Level I coatings that are present in the Containment Building.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.
* During the audit, the applicant provided information to the staff regarding coating degradation found in containment. The failed coating system was Carboline Carbo Zinc 11 (CZ11) primer top coated with Carboline Phenoline 305. The applicant concluded that the failure mechanism was splitting of CZ11 primer where the primer split, leaving CZ11 on the substrate. The staff noted that the reason for the splitting of the CZ11 primer is unknown. It is not clear to the staff that the operating experience for the applicants Service Level I coatings is consistent with industry operating experience since a root cause evaluation was not performed to determine the reason for the splitting of the CZ11 primer.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and
trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S8. The staff also identified certain aspects of the acceptance criteria program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.32, Reactor Head Closure Studs Summary of Information in the Application. The LRA states that AMP B.1.32, Reactor Head Closure Studs is an existing program with enhancements that is consistent with the program elements in GALL Report AMP XI.M3, Reactor Head Closure Stud Bolting. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: bolt, bolting, closure stud, stress corrosion cracking, wear, and cracking.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00006      Program Basis Document, Aging Management Program              Revision 1, Evaluation Results - Class 1 Mechanical                      05/01/2013
: 2. WF3-EP-14-00006      Program Basis Document, Aging Management Program              Revision 1, Evaluation Results - Class 1 Mechanical, Reactor Head        05/01/2013 Closure Studs.
: 3. CR-WF3-2003-        Reactor Vessel Head Stud Leakoff Line Pressure High as        11/28/2003 03780                  Indicated by Annunciator
: 4. CR-WF3-2003-        Vessel Head East Guide Stud was Bound                        09/08/2003 03620
: 5. CR-WF3-2009-        Wastage Noticed at Outside Seating Surface Between Stud      05/11/2009 06667                  No. 8 and No. 9
: 6. WF3-EP-14-00003      Operating Experience Review Results - Aging Management        Revision 0, Program Effectiveness                                        11/30/2015
: 7. CR-WF3-2012-        Reactor Vessel Flange Leakoff Line                            10/13/2012 05113
: 8. CR-WF3-2008-        Boron Trail Detected Due to Flange Leak Near Stud Hole No. 26 05/05/2008 01931
: 9. CR-WF3-2007-        Reactor Vessel Head Flange O-Ring Leak                        10/31/2007 03385
: 10. CR-WF3-2007-        Reactor Vessel Head Flange O-Ring Leak                        09/04/2007 03129
: 11. Certificate of Test The Timeken Company, Canyon, OH 44706                        03/05/1973 M-1028-1-74170          Certificate of Test for Closure Studs for Heat Number 80751
Document                                        Title                        Revision/Date
: 12. Contract 74170      List of Piece, Code, and Heat Numbers                      03/05/1973
: 13. UNT-006-032          Coating and Corrosion Program                              Revision 0, 03/31/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M3. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in SRP-LR.
LRA AMP B.1.33, Reactor Vessel Internals Summary of Information in the Application. The LRA states that the Reactor Vessel Internals Program is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.M16A, PWR Vessel Internals. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancement associated with this AMP. The enhancement will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: cracking, fracture, loss of material, stress corrosion cracking, PWSCC, cast, preload, and SCC.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                        Revision/Date
: 1. WF3-EP-14-00006      Aging Management Program Evaluation Results - Class 1      Revision 0 Mechanical
Document                                              Title                                  Revision/Date
: 2. WF3-EP-14-00003            Operating Experience Review Results - Aging Management                Revision 0 Program Effectiveness
: 3. WF3-ME-14-00002            Aging Management Review of the Reactor Vessel Internals              Revision 1
: 4. CEP-RR-001                ASME Section XI Repair/Replacement Program                            Revision 310
: 5. LTR-CI-03-63              3716 MWt Power Uprate Waterford Unit 3 Reactor Vessel                Revision 1, Internals Materials (Proprietary)                                    11/16/2004
: 6. LTR-RIAM-15-22            Summary of Waterford Unit 3 Expert Elicitation Panel Meeting          Revision 0, Minutes for Reactor Internals Components and Materials                04/08/2015 (Proprietary)
: 7. CR-WF3-2008-02131          Condition Report for Reactor Vessel Core Barrel Removal and          05/09/2008 FME Inspection
: 8. CR-WF3-2014-02414          Condition Report for the Identification of Crack (Gap) on the        05/07/2014 Corner of the Core Shroud (Barrel)
: 9. DCP-3398                  Incore Instrument Thimble Replacement                                05/11/1995
: 10. No document ID            Waterford 3 7th Refuel Outage Summary Report                          11/09/1995 Number Available
: 11. License Renewal          Thermal Aging Embrittlement of Cast Austenitic Stainless Steel        05/19/2000 Issue No. 98-0030 1          Components
: 12. Topical Report            Reactor Internals Acceptance Criteria Methodology and Data            Revision 2, No. WCAP-17096-NP1            Requirements                                                          05/19/2010
: 13. NRC Safety                Proprietary Safety Evaluation of Topical Report                      05/03/2016 Evaluation                    WCAP-17096-NP, Revision 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements1
: 14. Topical Report            Statistical Assessment of PWR RV Internals CASS Materials            Revision 0, No. PWROG-15032-NP            (A Westinghouse Non-Proprietary Class 3 Report)                      11/30/2015
: 15. NRC Staff                Staff Assessment of PWROG-15032                                      09/06/2016 Assessment Notes: 1.Although WCAP-17096-NP was submitted as a nonproprietary report, the NRC safety evaluation for the report includes some proprietary RAI discussions. The referenced safety evaluation is designated as a proprietary safety evaluation that is not available for public review. The publically available, nonproprietary version of this safety evaluation (dated May 3, 2016) is available in NRC ADAMS (Accession No. ML16061A243).
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.
During the audit, the staff verified that the preventive actions and parameters monitored/inspected program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program, detection of aging effects, monitoring and trending, and acceptance criteria program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements in GALL Report AMP XI.M16A, PWR Vessel Internals. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs as needed for the subjects discussed below.
* Scope of Program and Response to Applicant/Licensee Action Item (A/LAI) #2 on the Methodology for Implementing MRP-227-A. In its response to A/LAI #2 on the MRP-227-A report, the applicant identified that the following components were not
evaluated in TR No. MRP-191 but are within the scope of the LRA and are subject to an AMR: (a) flow restrictor plugs, (b) core stabilizing shims, (c) core stabilizing dowel pins, and (d) incore instrumentation (ICI) couplings. The applicant stated that these components were evaluated and classified as components not requiring additional aging management beyond that specified for the components in the MRP-227-A report. The applicant also stated that the core stabilizing bolts were evaluated and classified as components that will be inspected in accordance with the Existing Program requirements of the Waterford 3 ASME Section XI In-Service Inspection Program.
During the audit, the staff reviewed documents that described the expert panel decision process for assessing these components in accordance with MRP-227-A, and the basis for dispositioning the components in accordance with one of four inspection categories for PWR reactor vessel internal (RVI) components in the MRP-227-A report. After reviewing the documents, the staff determined that the applicants methodology and basis for categorizing these components as either No Additional Measures components or Existing Program components for the AMP was sufficiently conservative and acceptable. The staffs issue on this matter is resolved.
* Detection of Aging Effects Element. In the basis document for the AMP, the applicant stated that the Reactor Vessel Internals Program implements the inspection criteria in the following tables in MRP-227-A: (a) Table 4-3 for primary components, (b) Table 4-6 for expansion components, and (c) Table 4-9 for existing program components. The staff noted that GALL Report AMP XI.M16A indicates that the inspection guidance in Chapter 4 of MRP-227-A should be used to inspect the RVI components at a given PWR facility; MRP-227-A identifies that the following inspection tables in Chapter 4 of the MRP-227-A should be used or referenced for inspections of RVI components that are included in Combustion Engineering (CE)-designed nuclear plants: (a) Table 4-2 for primary components, (b) Table 4-5 for expansion components, and (c) Table 4-8 for existing program components. The staff also observed that the basis document for the Reactor Vessel Internals AMP referenced the inspection tables in MRP-227-A that apply to Westinghouse-designed RVI components, and not the inspection tables in the report for the RVI components at plants designed by CE (including Waterford 3). It is not clear to the staff that these statements are consistent with the detection of aging effects program element in GALL Report AMP XI.M16A because the AMP should be referencing the applicable inspection tables in MRP-227-A that apply to CE-designed RVI components, and not those for Westinghouse-designed RVI components.
* Detection of Aging Effects Element. In the basis document for the AMP, the applicant states that VT-3 visual methods are applied for the detection of cracking. The program element criteria in GALL Report AMP XI.M16A identify that VT-3 visual methods are acceptable for detecting cracking in redundant components, such as redundant bolts or pins. The GALL Report AMP also states that VT-3 visual methods can be applied to non-redundant components only when the flaw tolerance for a particular component is known and the component has been shown to be tolerant of easily detected large flaws.
It is not clear to the staff that these statements are consistent with the detection of aging effects element in AMP XI.M16A because the applicant did not initially specify whether the VT-3 visual methods are being applied to redundant or non-redundant components in the RVI design. During the audit, the applicant provided documents demonstrating that the applicant will be using VT-3 methods only for visual inspections of redundant RVI components in the plant design. Consistent with MRP-227-A, EVT-1 visual methods will be used for detection of cracking in non-redundant RVI components
(e.g., non-redundant welds or non-redundant structural or support components). The staffs issue on this matter is resolved.
* Detection of Aging Effects and Response to A/LAI #2 on the Methodology for Implementing MRP-227-A. In A/LAI #2, the staff stated that PWR license renewal applicants are responsible for identifying all RVI components that are within the scope of the LRA for its facility and any differences from the assumptions and augmented inspection criteria defined in the MRP-227-A report. The staff also asked the applicant to identify any necessary modifications of the programmatic condition monitoring criteria that are defined for CE-designed RVI components in the MRP-227-A report.
In the MRP-227-A and MRP-191 reports, the ERPI identifies that loss of material due to wear is an applicable aging effect for the thimble tubes in CE-designed PWRs. In the documentation reviewed during the audit, the staff noted that the applicant stated that ABB Combustion Engineering has designed a new wear resistant thimble that has replaced the zircaloy in the wear zone with a chrome plated stainless steel section of greater wall thickness. Therefore, the staff verified that the applicant would not need to identify loss of material due to wear as an applicable aging effect requiring management (AERM) for the ICI thimble tubes. The staffs issue on this matter is resolved.
In MRP-191, EPRI identifies that CE-designed thimble tubes are made from zircaloy materials, and not from stainless steel. The staff verified that the applicant appropriately addressed the difference in material in its LRA evaluation basis for resolving the request in A/LAI #2. Based on its assessment, the applicant identified that a different aging effect and mechanism (i.e., changes in component dimensions induced by irradiation growth) is applicable to the design of the stainless steel ICI thimble tubes at Waterford 3 and proposed a plant-specific basis to manage this aging effect. Specifically, the applicant identified that the Reactor Vessel Internals Program will be adjusted to include physical measurements of the ICI thimble tubes in order to monitor for potential changes in dimensions in the components. The staff noted that this type of plant-specific management basis is consistent with other MRP-defined or PWROG-defined physical measurement bases for managing changes in dimension in RVI components. However, the staff noted that the applicant will need to better define the type of physical measurements that will be performed on the ICI thimble tubes during the period of extended operation. The staff also noted that it is necessary for the applicant to address how the physical measurements will be completed and to define the acceptance criteria that will be applied to the assessment of the physical measurement results.
* Detection of Aging Effects Element. In relation to the detection of aging effects element for AMP B.1.33, the MRP-227-A report identifies that the following RVI components in CE-designed plants should be inspected for cyclic load-induced cracking using visual EVT-1 methods if the fatigue life of the components cannot be demonstrated by time-limited aging analysis (TLAA): (a) lower flange weld in the core support barrel assembly, (b) core support plate in the lower support structure, and (c) for CE-plants whose core shrouds were designed and assembled with full-height shroud plates, in the fuel alignment plate for the upper internals assembly. The condition monitoring criteria in MRP-227-A for CE-designed fuel alignment plates do not apply to the design at Waterford 3 because the core shroud was not designed and assembled using full height shroud plates (i.e., the shroud is designed with a gap area).
During the audit, the staff identified that LRA Section 4.3.1.2 provides the applicants metal fatigue TLAA for the RVI components at Waterford 3. However, the staff noted that LRA Section 4.3.1.2 did not specify which of the RVI components at Waterford 3 were evaluated with metal fatigue TLAAs or fatigue waiver TLAAs. Therefore, the staff could not establish whether the lower flange weld in the core support barrel assembly or the core support plate in the lower support structure will be inspected in accordance with the EVT-1 condition monitoring criteria specified for these components in Table 4-2 of the MRP-227-A report. The applicant will need to provide additional clarifications on whether these components will be inspected in accordance with the criteria in the MRP-227-A report during the period of extended operation.
* Monitoring and Trending Element. The staff observed that the monitoring and trending program element discussion in the LRA AMP did not address the monitoring and trending criteria in the last two paragraphs of the corresponding program element in GALL Report AMP XI.M16A, which include criteria for performing flaw evaluations of both non-redundant and redundant RVI components. During the audit, the applicant stated that consistency with the last two paragraphs in the monitoring and trending program element of GALL Report AMP XI.M16A is addressed by a statement in the basis document that inspections and flaw evaluations of the RVI components are performed in accordance with MRP-227-A, as supplemented by guidelines and criteria in Technical Report No. WCAP-17096-NP, Revision 2. The staff reviewed WCAP-17096-NP, Revision 2, as well as the associated safety evaluation for the report and determined that the monitoring and trending criteria for performing potential flaw evaluations are appropriately addressed in the MRP-227-A and WCAP-17096-NP, Revision 2, reports and the applicants commitments for implementing the Reactor Vessel Internals Program. The staffs issue on this matter is resolved.
* Monitoring and Trending Element and Response to A/LAI #7 on the Methodology for Implementing MRP-227-A. In A/LAI #7, the staff requested that the applicants/licensees of CE-designed reactors develop plant-specific analyses of any lower support columns made from cast austenitic stainless steel (CASS) materials to demonstrate that the components will maintain their functionality during the period of extended operation. The staff also applied these recommendations for additional RVI components that may be fabricated from CASS, martensitic stainless steel, or precipitation hardened stainless steel materials. In the LRA, AMR items for the control element assembly (CEA) shroud extension shaft guide and the CEA shroud assembly tubes, the applicant identified that the components are fabricated from CASS materials. The applicant identifies that these components are evaluated in the EPRI MRP-191 report, but under the assumption that the components are made from wrought stainless steel materials.
During the audit, the applicant provided the staff with an industry-issued technical report (PWROG-15032-NP) that evaluated any CASS RVI components for susceptibility to loss of fracture toughness induced by thermal aging embrittlement. The report indicates that all of the RVI components are made from CASS CF8 materials with sufficiently low levels of ferrite and molybdenum. The staff verified that the report demonstrates that CF8 materials used for fabricating these CASS components are not susceptible to thermal aging embrittlement because the ferrite and molybdenum contents of the materials are lower than those cited in NRC License Renewal Issue Document No. 98-0030 for rending a CASS component as being potentially susceptible to a thermal embrittlement aging mechanism. The staff also verified that Technical Report No. PWROG-15032-NP was endorsed in a safety assessment issued by the staff.
Therefore, the staff confirmed that the applicant has provided sufficient demonstration that any CASS components included in the RVI design are not susceptible to thermal aging embrittlement. The staffs issue on this matter is resolved.
The action in A/LAI #7 also requests that the applicant evaluate any RVI components that are potentially fabricated from either martensitic or precipitation-hardened stainless steel materials. During the audit, the staff confirmed that the applicant did not have any components fabricated from martensitic or precipitation-hardened stainless steel.
The staffs issue on this matter is resolved.
* Acceptance Criteria Element. The acceptance criteria program element of the LRA AMP states that the acceptance criteria are consistent with Section 5 and Table 5-1 of MRP-227-A. The GALL Report AMP states that Section 5 of MRP-227-A includes Table 5-1 for B&W-designed RVIs, Table 5-2 for CE-designed RVIs, and Table 5-3 for Westinghouse-designed RVIs. It is not clear to the staff that these statements are consistent because the applicant references the applicable table for B&W components (Table 5-1) instead of that for CE components (Table 5-2).
* Acceptance Criteria Element. In its response to A/LAI #5 on the MRP-227-A report, the applicant identified the acceptance criteria for the gap between the interfacing plates of the core shroud upper and lower subassemblies. However the applicant did not provide the source used to determine the acceptance criteria. During the audit, the staff confirmed that the source used to establish the acceptance criteria for the gap area in the core shroud is appropriately addressed in Technical Report No. WCAP-17096-NP, Revision 2. The staffs issue on this matter is resolved.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience, including operating experience reported in the MRP-227-A report or in industry alert letters for PWR RVI components.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, and parameters monitored or inspected program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M16A. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined. In addition, the applicants responses to A/LAI #2 in the LRA require additional information.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.34, Reactor Vessel Surveillance Summary of Information in the Application. The LRA states that AMP B.1.34, Reactor Vessel Surveillance, is an existing program that is consistent with the program elements in GALL Report AMP XI.M31, Reactor Vessel Surveillance. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: capsule, vessel surveillance, vessel material, withdrawal schedule, removal schedule, and Appendix H.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                              Revision/Date
: 1. WF3-EP-14-00006      Waterford 3 License Renewal Project Aging Management          Revision 0 Program Evaluation Results - Class 1 Mechanical, Section 4.6, Reactor Vessel Surveillance Program
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management        Revision 0 Program Effectiveness, Section 3.1.24, Reactor Vessel Surveillance
: 3. CEP-FTP-W3          Reactor Vessel Fracture Toughness and Surveillance Material    Revision 0, Testing at Waterford 3                                        07/17/2007
: 4. WCAP-18002-NP        Waterford Unit 3 Time-Limited Aging Analysis on Reactor Vessel Revision 0, Integrity                                                      June 2015
: 5. WCAP-17969-NP        Analysis of Capsule 83 from the Entergy Operations, Inc.      Revision 0, Waterford Unit 3 Reactor Vessel Radiation Surveillance Program April 2015
: 6. WCAP-16002          Analysis of Capsule 263 from the Entergy Operations Waterford  Revision 0, Unit 3 Reactor Vessel Radiation Surveillance Program          March 2003
: 7. WCAP-16088-NP        Waterford Unit 3 Reactor Vessel Heatup and Cooldown Limit      Revision 1, Curves for Normal Operation                                    September 2003
: 8. CR-WF3-2015-        Required Reporting of Reactor Vessel Material Surveillance    07/22/2015 04833                  Program (FSAR 5.3.1.6) Related to WCAP-17969-NP for Capsule 83
: 9. CR-WF3-2015-        Update FSAR 5.3-10 To Include the Actual Removal EFPY and      08/24/2015 01196, CA 145          Fluence for Capsule 83 and the Target Removal EFPY and Fluence for Capsule 277 as Provided by the TLAA Report WCAP-18002-NP, Revision 0
: 10. LR-LAR-2016-        Update FSAR 5.3-10 To Include the Actual Removal EFPY and      03/21/2016 00015, CA 19            Fluence for Capsule 83
: 11. LR-LAR-2016-        Update the Target Removal EFPY and Fluence for Capsule 277    03/21/2016 00015, CA 20            as Provided by the TLAA Report WCAP-18002-NP, Revision 0 (NRC approval is required)
: 12. CR-WF3-2013-        RF-001-016, Reactor Surveillance Capsule Assemblies,          04/22/2013 01996                  Referenced the Incorrect Capsule Location to Be Removed at 26 EFPY
Document                                        Title                          Revision/Date
: 13. CR-WF3-2004-        Need to Officially Request NRC Approval To Implement the    03/10/2004 00734                    Revised Vessel Specimen Withdrawal Schedule (Withdrawal of the third capsule at 26 EFPY)
: 14. W3F192-0094          GL 92-01, Revision 1, Response                              07/06/1992
: 15. C-PENG-ER-004        Revision 0, Reactor Vessel Group Record Evaluation Program  Revision 0, Phase II Final Report for the Waterford 3 Reactor Pressure  October 1995 Vessel Plates, Forging, Welds and Cladding, Page 124 During the audit of program elements 1 through 6, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the scope of program and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The detection of aging effects program element of the GALL Report AMP recommends withdrawal and testing of one capsule at an outage in which the capsule receives a neutron fluence of between one and two times the 60-year peak reactor vessel fluence.
The GALL Report also states that, in accordance with 10 CFR Part 50, Appendix H, an applicant submits its proposed withdrawal schedule for approval before implementation.
During the audit, the staff noted that the applicant identified a need to withdraw and test Capsule 277 at 48 effective full-power year (EFPY) to represent the fluence exposure for the period of extended operation. In contrast, the applicant did not submit a withdrawal schedule for this capsule for NRC approval. Additional information is necessary because the absence of a staff-approved withdrawal schedule for this capsule is not consistent with the GALL Report AMP.
* The scope of program program element of the GALL Report AMP states that the program includes all reactor vessel beltline materials as defined by 10 CFR Part 50, Appendix G, Section II.F. LRA Section 4.2.1 and Table 4.2-1 identify the reactor vessel beltline materials that are exposed to 60-year (55-EFPY) fluence greater than 1x1017 n/cm2 (E > 1 MeV). Specifically, LRA Table 4.2-1 indicates that 55-EFPY fluence for the upper shell plates and welds at the clad/metal interface is 5.82x1017 n/cm2 (E > 1 MeV).
The 40-year (32-EFPY) fluence for these upper shell materials is approximately estimated as 3.37x1017 n/cm2 (E > 1 MeV) by linear interpolation, which suggests these materials are also identified as beltline materials for 32 EFPY. In contrast, these upper shell materials are not identified as beltline materials in the evaluation for the 32-EFPY pressure-temperature (P-T) limits described in WCAP-16088-NP, Revision 1, including Table 2-2. Clarification is needed to reconcile this potential inconsistency in identifying these upper shell plates and welds as beltline materials between the 32-EFPY evaluation and 55-EFPY evaluation.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below.
* Table 3.0-1 of SRP-LR, Revision 2, includes an example FSAR supplement for the summary description of an aging management program consistent with GALL Report AMP XI.M31, Reactor Vessel Surveillance. In contrast with the FSAR supplement in SRP-LR, Revision 2, the staff noted that the LRA Section A.1.34 does not include the following important attributes of the program: (a) any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the staff before the implementation, and (b) untested capsules placed in storage must be maintained for future insertion. Additional information is necessary to resolve this concern.
Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M31. The staff also identified certain aspects of the scope of program and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.35, Selective Leaching Summary of Information in the Application. The LRA states that AMP B.1.35, Selective Leaching, is a new program that will be consistent with the program elements in GALL Report AMP XI.M33, Selective Leaching, as modified by LR-ISG-2011-03, Changes to the Generic Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and a search of plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: dealloy, degraph, dezinc, leach, and zinc.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00007      Aging Management Program Evaluation Results Non-Class 1    Revision 0 Mechanical, Selective Leaching
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness, Section 3.2.11, Selective Leaching During the audit of program elements 1 through 7, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the corrective actions program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
* The program description of the LRA AMP states [f]ollow-up for unacceptable inspection findings includes an evaluation using the corrective action program and possible expansion of the inspection sample size and location. The corrective actions program element of the GALL Report AMP recommends that, [u]nacceptable inspection findings result in additional inspection(s) being performed, which may be on a periodic basis, or in component repair or replacement. It is not clear to the staff that these statements are consistent because GALL Report AMP XI.M33 recommends that additional inspections be conducted when inspections result in unacceptable results; whereas, the LRA AMP states there might be additional inspections. This issue also impacts the LRA FSAR description of the Selective Leaching program.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. With the exception of the issue identified in the corrective actions program element, above, the staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M33, as modified by LR-ISG-2011-03. The staff also identified certain aspects of the corrective actions program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.
LRA AMP B.1.36, Service Water Integrity Summary of Information in the Application. The LRA states that AMP B.1.36, Service Water Integrity, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M20, Open-Cycle Cooling Water. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP and their evaluation will be documented in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff walked-down portions of Wet Cooling Towers, Dry Cooling Towers, and other portions of the CCW and auxiliary component cooling water (ACCW) systems. The staff also conducted an independent search of the applicants operating experience database using keywords: corr, erosion, cavit, foul, mic, service water, and leak.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                            Revision/Date
: 1. WF3-EP-14-00002      Operating Experience Review Results - Aging Effects Requiring Revision 0 Management
: 2. WF3-EP-14-00003      Operating Experience Review Results - Aging Management        Revision 0 Program Effectiveness, Section 3.1.25 Service Water Integrity
: 3. WF3-EP-14-00007      AMP Evaluation Results - Non-Class 1 Mechanical, Section 4.12 Revision 1 Service Water Integrity
: 4. WF3-ME-14-00009      Aging Management Review of the Component Cooling and          Revision 1 Auxiliary Component Cooling Water Systems
: 5. EN-DC-184            NRC GL 89-13 Service Water Program                            Revision 3
: 6. EN-DC-340            Microbiologically Influenced Corrosion                        Revision 3
: 7. SEP-HX-WF3-001        GL 89-13 Heat Exchanger Test Basis                            Revision 0
: 8. W3F1-93-01            GL 89-13 Implementation Confirmation Letter                  1/29/1993
: 9. W3P90-0207            GL 89-13 Response                                            1/29/1990
: 10. PE-004-021          CCW Heat Exchanger Performance Test                          Revision 4
: 11. PE-004-033          Wet Cooling Tower Thermal Performance Test Report            2/27/2014
: 12. W3-DBD-4            Component Cooling Water Auxiliary Component Cooling Water,    Revision 303 Design Basis Document
: 13. PMID 00005814-01    Inspect Cooling Towers                                        N/A
: 14. WO 52506463 01      ACCMTWR0001 A Inspect Basin and Submerged Components,        11/18/2015 PMID 00005814-04
: 15. PMRQ 34924-01        Create New PM To Open/Close Valves CW MVAAA402,              N/A CW MVAAA403A&B Once Every Refuel
: 16. Isometric            Blowdown Heat Exchanger Line No. 7CW16-31                    0 No. 22000
Document                                        Title                            Revision/Date
: 17. Flow Diagram        Miscellaneous Reactor Auxiliary System                          Revision 15 G164 Sheet 5
: 18. CR-WF3-2007-        WF3 may not be in compliance with PE-004-015, GL 89-13 Heat    N/A 02364                  Exchanger Test Basis for EDGs.
: 19. CR-WF3-2007-        PMRQ561-02 & 5562-02 (remove spool piece between ACC127B        N/A 01084                  and ACC126B and inspect piping for erosion)
: 20. CR-WF3-2008-        Algae seen exhausting from Wet Cooling Tower B fans when      N/A 04388                  fans started.
: 21. CR-WF3-2009-        CCW HxB thermal performance analysis indicates a degrading      N/A 00599                  trend (12/9/2008 vs 12/11/2001).
: 22. CR-WF3-2009-        Cavitation erosion, incipient cavitation damage in valve body  N/A 00614                  ACC-126A. Same as CR-WF3-2009-00852 for valve 126.
: 23. CR-WF3-2009-        Blockage due to sediment when opening drain line ACC-120B.      N/A 00843
: 24. CR-WF3-2009-        Severe piping corrosion on pipe directly above ACC water basin. N/A 01622
: 25. CR-WF3-2009-        External corrosion of CMU supply piping to Wet Cooling Tower A. N/A 01717
: 26. CR-WF3-2011-        Dried dark green filmy material in small pieces were observed  N/A 06856                  collecting on the ground at the +21 elevation outside the WCT B.
: 27. CR-WF3-2012-        While performing fill and vent of ACCW B train, valve          N/A 06401                  ACCMVAAA122B was clogged and could not be used for venting.
: 28. CR-WF3-2013-        Damage to WCT fill. WCT A fill had experienced damage          N/A 01106                  previously as documented in CR-WF3-2003-0090 and CR-WF3-2005-0182.
: 29. CR-WF3-2014-        Identified a leak from one of the tubes in Dry Cooling Tower B. N/A 004930                  The cause of this leak was determined to be external corrosion.
: 30. CR-WF3-2014-        Apparent Cause Evaluation Dry Cooling Tower B Bundle #1 Tube    0 004930                  Leak
: 31. CR-WF3-2015-        On 1/24/15, several Dry Cooling Tower tube bundles were        N/A 00463                  inspected as part of Extent of Condition.
: 32. CR-WF3-2015-        Drain valves ACC-120/1201B and ACC-118B are clogged.            N/A 00756
: 33. CR-WF3-2015-        Aug-3-2015 black paper-like substance floating down into the    N/A 05067                  WCT A basin.
: 34. CR-WF3-2015-        Piping downstream of ACC-137A inside ACC A basin has          N/A 08543                  corroded to the point that welding cannot be performed as planned.
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the monitoring and trending and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. However, the staff found that for the scope of program, preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these
program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
The ACCW system includes distribution nozzles in the Wet Cooling Tower that are being managed for loss of material. However, the piping upstream of the flow nozzles is periodically wetted and dried during various operational modes that can promote more aggressive internal corrosion and can lead to flow blockage due to fouling. It is unclear to the staff whether flow blockage of the Wet Cooling Tower flow distribution nozzles needs to be managed by the Service Water Integrity program.
The nonsafety-related chemical addition and filtration system takes a suction from the Wet Cooling Tower basin but it has several siphon breaker holes to eliminate the potential for inadvertently removing water from the Wet Cooling Tower basin. This system is not within the scope of license renewal. It is unclear to the staff whether failure of the siphon breaker holes (i.e., flow blockage due to fouling) could prevent satisfactory accomplishment of an ACCW system intended function, requiring inclusion of a portion of the system to be within the scope of license renewal.
The Service Water Integrity program manages aging effects as described in Waterfords response to NRC GL 89-13. Waterfords response for Action III states that components from the ACCW system will be added to its Erosion/Corrosion program. The system susceptibility evaluation for Flow-Accelerated Corrosion program (previously called the Erosion/Corrosion program) shows that the ACCW system is excluded from that programs scope. It is unclear to the staff if and how the prior GL 89-13 commitment was changed and how the activities for Action III of GL 89-13 will be accomplished during the period of extended operation.
There are discrepancies between the program basis documents and the information in the LRA. Onsite program documentation for the ACCW system (WF3-ME-14-00009) states that the One-Time Inspection program will manage loss of material in the carbon steel circulating water intake piping. However, LRA Table 3.3.2-3, which addresses components for that system, does not show carbon steel piping as being managed by the One-Time Inspection program. In addition, LRA Table 3.3.2-3 shows that carbon steel piping with internal coatings will be managed for loss of material and coating integrity by the Coating Integrity program. However, WF3-ME-14-00009 does not include the Coating Integrity program as managing components in the ACCW system.
In addition, in order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.
The Service Water Integrity program manages aging effects as described in Waterfords response to GL 89-13 and includes an enhancement to monitor the ACCW basins for biological fouling by visual inspections and analysis of water for biological activity.
However, Waterfords response to GL 89-13 Action I states that it already monitors the ACCW basin for biological fouling by visual inspection and analysis of water for biological activity. It is unclear to the staff if and how the prior GL 89-13 commitment was changed, such that a new commitment to monitor the ACCW basins for biological fouling is needed for the period of extended operation.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by
known industry operating experience. However, the staff could not determine whether the applicant had adequately evaluated and incorporated the operating experience related to this program. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.
Condition report CR-WF3-2009-00843 documents blockage due to sediment for a drain line in the ACCW system. Although makeup water to the ACCW system is demineralized water and chemical corrosion inhibitors maintain a low corrosion rate, sufficient fouling appears to be present in some portions of the system to cause blockage. It was unclear to the staff whether prior changes were made to the Service Water Integrity program as a result of this operating experience in light of the need to enhance the program procedures for the period of extended operation to flush stagnant lines to ensure there is no blockage.
The staff also audited the description of the LRA AMP provided in the FSAR supplement in LRA Section A.1.36. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M20. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the scope of program, preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. However, additional information is required to determine whether the applicant had adequately evaluated and incorporated the operating experience related to this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.37, Steam Generator Integrity Summary of Information in the Application. The LRA states that AMP B.1.37, Steam Generator Integrity, is an existing program that is consistent with the program elements in GALL Report AMP XI.M19, Steam Generators. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: steam generator, tubesheet weld, channel head, divider plate, and loose part.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                      Title                              Revision/Date
: 1. 5817-13787          Flange/Port Drawing                                            Revision 0
: 2. 5817-13807          Recirculation Nozzle Drawing                                    Revision 0
: 3. CEP-SG-001          Steam Generator Primary Side Examinations and Maintenance      Revision 1
: 4. CEP-SG-002          Steam Generator Secondary Side Examinations and                Revision 0 Maintenance
: 5. CEP-SG-003          Steam Generator Integrity Assessment                            Revision 1
: 6. ECR 0000016360      Waterford 3 - Steam Generator Strategic Plan                    06/17/2014
: 7. ECR 0000017215      Generate a Degradation Assessment for RF19 First ISI Inspection 06/30/2014 of W3 Replacement SG per NEI 97-06 and EN-DC-317
: 8. EN-DC-317            Steam Generator Program                                        Revision 8
: 9. SEP-SG-WF3-001      WF3 Steam Generator Program                                    Revision 0
: 10. TM 1440-C396,      Steam Generator Technical Manual                                Revision 1 Volume 2
: 11. WF3-EP-14-00003    Operation Experience Review Results - Aging Management          Revision 0 Program Effectiveness During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M19.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.38, Structures Monitoring Summary of Information in the Application. The LRA states that AMP B.1.38, Structures Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S6, Structures Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements to the LRA AMP will be evaluated in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the reactor auxiliary building, fuel handling building, dry and Wet Cooling Towers, shield building (exterior), and turbine building. The staff also conducted an independent search of the applicants operating experience database using keywords: concrete, steel, crack, corrosion, leak, SCC, ASR, settlement, rust, and leach.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                          Title                        Revision/Date
: 1. WF3-EP-14-00008        Aging Management Program Evaluation Report Civil/Structural Revision 1
: 2. WF3-EP-14-00003        Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness
: 3. EN-DC-150              Condition Monitoring of Maintenance Structures              Revision 6, 11/21/2013
: 4. EN-MA-15              Maintenance Standard for Torque Applications                Revision 3, 04/25/2014
: 5. EN-DC-178              System Walkdowns                                            Revision 7, 11/21/2013
: 6. LOU 1564.723          [Specification] Structural Steel Seismic I & II            Revision 16
: 7. W-CS-2003-001-00      Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 10/09/2003
: 8. WF3-CS-11-00001        Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 01/12/2011
: 9. WF3-CS-16-00006        Maintenance Rule Walkdown for Evaluation of Structures      Revision 0, 05/11/2016
: 10. CR-WF3-2016-4480      Degraded Gap Seal on the Q-Deck                            07/12/2016
: 11. CR-WF3-2016-4481      Corroded Bolt/Nut on the Column Near WCT B Basin Window    07/12/2016
: 12. CR-WF3-2016-4482      Exposed Rebar on the Concrete Wall Near the Passage From    07/12/2016 WCT B to DCT B
: 13. CR-WF3-2016-4484      Abandoned Pipe Penetrating the Shield Building Not Grouted  07/12/2016 and Exposed
: 14. CR-WF3-2015-00947    Ongoing Issue with the Identification, Evaluation, and      02/19/2015 Resolution of External Corrosion
: 15. CR-WF3-2006-00755    External Corrosion in Structural Steel, Equipment, and      2006 Component
: 16. UNT-006-032          Coating and Corrosion Program                              Revision 0
: 17. LOU-1564, G-780      Drawing: Turbine Area Column Schedules                      Revision 7, 07/03/1991
: 18. LOU-1564, G-793      Drawing: Turbine Building Sections & Details                Revision 8 03/24/1983
: 19. LOU-1564, G-599      Drawing: Turbine Generator Pedestal Mat-Masonry            Revision 5 06/19/1979
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.
During the audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
* The parameters monitored or inspected, and detection of aging effects program elements of the GALL Report AMP X1.S6 recommend that high-strength (actual measured yield strength  150 ksi or 1,034 MPa) structural bolts greater than 1 inch (25 mm) in diameter be monitored for SCC, and that visual inspections be supplemented with volumetric or surface examinations to detect cracking. During the AMP audit, the staff noted that the applicant excluded managing the aging effects of SCC in high-strength structural bolts and stated, in part, that since molybdenum disulfide thread lubricants are not used at WF3, for structural bolting applications, SCC of high-strength structural bolting is not an aging effect requiring management at WF3. It is not clear to the staff that this statement is consistent because the GALL Report does not credit the molybdenum disulfide thread lubricant as the only contributor to the aging mechanism of SCC in high-strength bolts. Also the staff is not clear whether high-strength structural bolts greater than 1 inch in diameter are used in structural applications, or how supplemental examinations are performed for these bolts because the plants structural specifications and drawings do not preclude the use of high-strength structural bolts with diameter greater than 1 inch when specified or noted as such in the drawing details.
In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.
* The LRA AMP states an enhancement to the preventive actions program element. The enhancement states that the plant procedure will be revised to include preventive actions for storage of ASTM A325, ASTM F1852, and ASTM A490 bolting from Section 2 of Research Council on Structural Connections publication. The GALL Report AMP XI.S6 recommends that if structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication need to be used. During the AMP audit the staff noted that the applicant excluded the use of preventive actions for lubricants, and stress corrosion cracking potential and stated that a review of Section 2 of the RCSC publication concluded that only storage is address[ed] and the RCSC publication does not address the preventive actions for lubricants and stress corrosion cracking potential for these bolts (WF3-EP-14-00008, Revision 1.) It was not clear to the staff that these statements are consistent, and if the above enhancement is adequate to make the LRA AMP consistent, because (1) the enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and (2) the related justification provided in the AMPER document appears to interpret the standard in a manner that is inconsistent with the consideration
in the GALL Report AMP. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection - IWE; B.1.16, Inservice Inspection -
IWF; and B.1.38, Structures Monitoring.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is generally bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion of steel structures and components has been identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.
* The staff reviewed condition reports CR-WF3-2006-00755, CR-WF3-2009-06945, and CR-WF3-2010-05582, which documented corrective actions to address several plant-specific operating experiences associated with corrosion on structural steel, supports, and components. The staff also reviewed CR-WF3-2015-00947, which summarizes the history (since January 2010) of several condition reports associated with the keyword corrosion. The corrective actions associated with this condition report resulted in further inspections of areas susceptible to external corrosion and the development of an external corrosion and coating inspection procedure (UNT-006-032) for safety-related systems and components. During the walkdowns, the staff also observed corroded bolts/nuts from a steel column, exposed concrete rebar, and structural steel with different levels of corrosion in several structures located outdoors (e.g., CR-WF3-2016-4481, CR-WF3-2016-4482.) Based on the staff review of this plant-specific operating experience and staff observed conditions during the audit walkdowns, it is not clear to the staff (1) how the structures monitoring program captures the operating experience (e.g., the existing corrosion concerns from recent inspections) and whether the conditions and operating experience at the plant is bounded by the conditions and operating experience for which the GALL Report program was evaluated in Section XI.S6, and (2) whether and how the structures monitoring program specified inspection frequency of 5 years remains adequate, considering the recent operating experience, to ensure no loss of intended functions during the period of extended operation for those structures with ongoing exterior corrosion concerns.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S6. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.
The staff also identified certain aspects of the preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.
Based on this audit, the staff also verified that the operating experience at the plant is generally bounded by the operating experience for which the GALL Report program was evaluated; however, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the
LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.39, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS)
Summary of Information in the Application. The LRA states that AMP B.1.39, Thermal Embrittlement of Cast Austenitic Stainless Steel (CASS), is a new program that will be consistent with the program elements in GALL Report AMP XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS). To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: CASS, cast, embrittlement, ferrite, thermal aging, and CF8.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                              Revision/Date
: 1. WF3-ME-14-00002      Aging Management Review of the Reactor Vessel Internals        Revision 1, 1/12/2016
: 2. WF3-ME-14-00003      Aging Management Review of the Reactor Coolant System and      Revision 1, Pressurizer                                                    9/13/2015
: 3. WF3-EP-14-00006      Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Revision 0 (CASS) Program Book
: 4. CE NPSD-1214          Generic Aging Management Review Report - Reactor Coolant      Revision 0 System During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit, the staff made the following observations:
* The staff reviewed the applicants Generic Aging Management Report for the RCS and noted CASS components and piping with a ferrite content above the 20 percent criteria for susceptibility to thermal aging embrittlement. The staff further noted that there is one component with a ferrite content above 25 percent.
* The staff reviewed the applicants Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program Book and confirmed that the applicant will evaluate flaws in accordance with ASME Section XI, Section IWB-3500 or IWC-3500 for CASS components with up to 25 percent ferrite content and will evaluate flaws for CASS
components with a greater than 25 percent ferrite content on a case-by-case basis using fracture toughness data.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M12.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
LRA AMP B.1.40, Water Chemistry Control - Closed Treated Water Systems Summary of Information in the Application. The LRA states that AMP B.1.40, Water Chemistry Control - Closed Treated Water Systems, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M21A, Closed Treated Water Systems as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP and will document their evaluation in the SER.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of portions of the component cooling system, including heat exchangers, pumps, and the Dry Cooling Towers. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, corr, eros, and treated.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                            Revision/Date
: 1. WF3-EP-14-00002          Operating Experience Review Results - Aging Effects        Revision 0 Requiring Management
: 2. WF3-EP-14-00003          Operating Experience Review Results - Aging Management      Revision 0 Program Effectiveness, Section 3.1.28 Water Chemistry Control - Closed Treated Water Systems
: 3. WF3-EP-14-00007          AMP Evaluation Results - Non-Class 1 Mechanical,            Revision 1 Section 4.13 Water Chemistry Control - Closed Treated Water Systems
Document                                          Title                              Revision/Date
: 4. CE-001-004            Periodic Analysis Scheduling Program                            Revision 315
: 5. CE-002-007            Maintaining CCW Chemistry                                        Revision 305
: 6. CE-002-013            Maintaining Essential Services Chill Water Chemistry            Revision 303
: 7. CE-002-014            Maintaining Supplementary Chill Water                            Revision 302
: 8. CE-002-019            Maintaining Diesel Generator Jacket Water Cooling Water          Revision 301 Chemistry
: 9. CR-WF3-2006-02537      The Component Cooling Water flow rate to Containment Fan        N/A Cooler D has degraded from approximately 975 gpm on 8/30/06 to approximately 640 gpm on 9/4/06.
: 10. CR-WF3-2007-02867    This condition report was written to document a very slight rise N/A in CCW Surge Tank Level.
: 11. CR-WF3-2007-03455    While performing cleaning activities on WO00116217, a pin        N/A hole leak developed on pipe 7CC4-199.
: 12. CR-WF3-2014-00448    Leak identified in Dry Cooling Tower B Bundle 1B.                N/A
: 13. CR-WF3-2014-004930    Identified a leak from one of the Dry Cooling Tower B. The      N/A cause of this leak was determined to be external corrosion.
: 14. CR-WF3-2014-004930    Apparent Cause Evaluation Dry Cooling Tower B Bundle #1          Revision 0 Tube Leak
: 15. CR-WF3-2015-00463    On 1/24/15, several Dry Cooling Tower tube bundles were          N/A inspected as part of Extent of Condition.
The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.
The staff also audited the description of the AMP provided in the FSAR supplement in LRA Section A.1.40. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M21A, as modified by LR-ISG-2012-02. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
                                                  - 100 -
LRA AMP B.1.41, Water Chemistry Control - Primary and Secondary Summary of Information in the Application. The LRA states that AMP B.1.41, Water Chemistry Control - Primary and Secondary, is an existing program that is consistent with the program elements in GALL Report AMP XI.M2, Water Chemistry. To verify this claim of consistency, the staff audited the LRA AMP.
Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: pH, fluoride, chloride, water chemistry, sampling, and dissolved oxygen.
The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
Relevant Documents Reviewed Document                                        Title                          Revision/Date
: 1. WF3-EP-14-00007    Aging Management Program Evaluation Results - Non-Class 1    Revision 0 Mechanical
: 2. WF3-EP-14-00003    Operating Experience Review Results - Aging Management        Revision 0 Program Effectiveness
: 3. CE-001-004          Periodic Analysis Scheduling Program                          Revision 315
: 4. CE-002-001          Maintaining Steam Generator Chemistry                        Revision 308
: 5. CE-002-002          Maintaining Condensate and Feedwater Chemistry                Revision 305
: 6. CE-002-005          Maintaining Makeup Demineralizer Chemistry                    Revision 016
: 7. CE-002-006          Maintaining Reactor Coolant Chemistry                        Revision 314
: 8. CE-002-008          Maintaining Condensate Storage Pool Chemistry                Revision 302
: 9. CE-002-009          Maintaining Boron Management System Chemistry                Revision 301
: 10. CE-002-010        Maintaining Safety Injection Tank Chemistry                  Revision 17
: 11. CE-002-011        Maintaining Spent Fuel Pool Chemistry                        Revision 10
: 12. CE-002-020        Maintaining Primary Water Chemistry                          Revision 13
: 13. CE-002-025        Maintaining Refueling Water Storage Pool Chemistry            Revision 14
: 14. CE-002-027        Maintaining Condensate Storage Tank and Demineralized Water  Revision 10 Storage Tank
: 15. EN-CY-100          Conduct of Chemistry                                          Revision 0
: 16. EN-LI-102          Corrective Action Program                                    Revision 24
: 17. WF3-Chem-Sec-      Strategic Secondary Water Chemistry Plan                      Revision 8 001-08
: 18. Program Basis      Primary Strategic Water Chemistry Plan                        Revision 5 Document
: 19. CR-WF3-2010-      Samples From Condensate Discharge Pump                        01/12/2010 00192
: 20. CR-WF3-2007        Condensate Storage Pool Sample                                09/26/2007
                                                  - 101 -
Document                                      Title                            Revision/Date
: 21. CR-WF3-2007-        Steam Generator Sulfate Concentration Trend                  11/01/2007 03960
: 22. CR-WF3-2007-        Steam Generator Samples Elevated                            10/23/2007 03832
: 23. CR-WF3-2008-        Oxygen Concentration at Indeterminate Amount in Make-Up      04/28/2008 01712                  Water
: 24. CR-WF3-2008-        Condensate Storage Tank Dissolved Oxygen Above Specification 05/29/2008 02625                  Limit
: 25. CR-WF3-2009-        Condensate Oxygen Exceeding Action Levels                    05/26/2009 02539 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.
During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.
The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.
Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M2.
Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.
Staff Review of Select AMR Items Associated with Elastomeric and Polymeric Components Summary of Information in the Application. During the audit, the staff reviewed plant documentation associated with the following AMR items:
* LRA Table 3.3.2-15-11, Component Cooling Water System, Nonsafety-Related Components Affecting Safety-Related Systems Summary of Aging Management Evaluation
* LRA Table 3.3.2-8, Fire Protection - Water System Summary of Aging Management Evaluation Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documents provided by the applicant. The table below lists the documents that were reviewed
                                                  - 102 -
by the staff and were found relevant to the review of these AMR items. These documents were provided by the applicant.
Relevant Documents Reviewed Document                                      Title                          Revision/Date
: 1. LRA-G160 sheet 2    Flow Diagram Component Closed Cooling Water System        Revision 0
: 2. WO 309583-01        Relocate Fire Hydrant 9 Shutoff and Isolation Valves per  09/10/2012 EC 35260 Audit Results. During the audit, the staff made the following observations:
* The staff noted that drawing LRA-G160 sheet 2, location A-5, states that the CCW corrosion rate monitor is constructed of PVC piping. The monitor is located inside the plant and is not exposed to sunlight. The AMR items are cited in LRA Table 3.3.2-15-11.
* The staff noted that WO 309583-01 step 4.33.1 states that the fire hydrant shutoff valve piping implemented by EC 35260 was embedded in controlled low-strength material.
The AMR item is cited in LRA Table 3.3.2-8.
LRA Section 4.1, Identification of Time-Limited Aging Analyses Summary of Information in the Application. LRA Section 4.1, Identification of Time-Limited Aging Analyses, provides the applicants methodology for identifying analyses, evaluations, assessments, or calculations that meet the definition of a TLAA in 10 CFR 54.3(a) and a summary of the results of the applicants TLAA search. LRA Section 4.1 also provides the applicants methodology for identifying regulatory exemptions that were granted in accordance with 10 CFR 50.12 based on a TLAA, as required by 10 CFR 54.21(c)(2).
Audit Activities. During its audit (July 25-29, 2016), the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The applicant is required by the criteria in 10 CFR 54.21(c)(2) to identify all exemptions that were granted based on a TLAA in accordance with the exemption acceptance provisions in 10 CFR 50.12. Prior to the AMP audit for the LRA, the staff reviewed the list of regulatory exemptions in the NRCs ADAMS database that were granted in accordance with the requirements of 10 CFR 50.12. The staff did not identify any regulatory exemptions that were based on a TLAA. Therefore, the staff did not perform an audit of the applicants basis for demonstrating compliance with the requirements in 10 CFR 54.21(c)(2).
The staff audited the information in LRA Section 4.1 to confirm if the applicant had omitted any analyses, evaluations, assessments, or calculations from the scope of the LRA that would need to be identified as TLAAs. The table below lists additional documents that were reviewed by the staff and were found relevant to the staffs audit of LRA Section 4.1. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.
                                                      - 103 -
Relevant Documents Reviewed Document and Number                                    Title                          Revision/Date
: 1. Engineering Calculation    Stress Report for Steel Containment  Vessel1            Revision 0 No. ECC12-009
: 2. NUREG-0787                Safety Evaluation Report Related to the Operation of    07/1981 Waterford Steam Electric Station, Unit No. 3, Docket No. 50-382
: 3. ER-W3-99-0184          Weld Repair of Inconel Instrument Nozzles on the        03/08/2000, 00,-01, and -03              Pressurizer                                              10/13/2000, and 10/27/2000
: 4. ER-W3-99-0184-01          Weld Repair of Inconel Instrument Nozzles on the RCS Hot 03/09/2000 and
  -00, -01                      Legs                                                    03/13/2000
: 5. ER-W3-99-0184          Repair of Inconel Alloy 600 Pressurizer Heater Sleeves  10/24/2000, 00, -01, -03, and -06,                                                                10/27/2000, 09/19/2001, and 07/02/2003
: 6. Structural Integrity      Fracture Mechanics Evaluation of Potential Remnant Crack Revision 2, Associates Report            in Waterford-3 Pressurizer Small Bore Nozzles 2          10/05/2016 No. SIR-06-302
: 7. Structural Integrity      Relaxation of Reactor Coolant Pump Flywheel Inspection  Revision 0, Associates Report            Requirement2                                            05/22/1995 No. SIR-94-080
: 8. Proprietary Structural    Design Report for Preemptive Repairs of Pressurizer and  Revision 3, Integrity Associates Report  Hot Leg Alloy 600 Components, Waterford Steam Electric  12/10/2010 No. SIR-08-092-NPS            Station, Unit2
: 9. ASME Section III          ASME Boiler and Pressure Vessel Code, Division 1        1971 Edition The applicant is required to identify and evaluate all analyses, assessments, evaluations, or calculations (hence, termed as analyses) that qualify as TLAAs in accordance with requirements in 10 CFR 54.21(c)(1). As specified in 10 CFR 54.21(c)(1), analyses are TLAAs if they conform to all six of the criteria in 10 CFR 54.3(a) for defining TLAAs. During the audit, the staff reviewed the applicants methodology for identifying potential sources of TLAAs. The staff also reviewed generic, site-specific, and corporate-specific documents in the CLB that may include potential sources of TLAAs. For generic, site-specific, or corporate-specific documents that were determined to contain time-dependent analyses, the staff reviewed applicable analyses against the six criteria for TLAA identification, as defined in 10 CFR 54.3(a). The staffs evaluation of the methodology for identifying TLAAs and the TLAA results for the application will be provided in FSER Section 4.1. However, during the audit, the staff discussed the following topics with the applicant:
(a) topical or technical reports (TRs) that may contain potential TLAAs (b) evaluations of potential TLAAs associated with repair or crack-mitigation designs (e.g., half-nozzle repair designs or weld overlay repair or mitigation designs) for nickel alloy base metal or weld components in the RCPB 1
The fatigue waiver analysis for the SCV is described on pages 151 and 152 of the stress report.
2 Given the proprietary nature of Report No. SIR-08-092-NPS, the staff treated its audit review of Report Nos. SIR-06-302 and SIR-94-080 as a review of proprietary documents.
                                                  - 104 -
(c) whether the metal fatigue analyzes for large-bore, Class 1 valves in the CLB are TLAAs (d) whether the CLB includes a fatigue waiver analysis for metal containment structure and whether this analysis needs to be identified as a TLAA for the LRA (e) whether the cyclical loading analysis (i.e., fatigue flaw growth analysis) for reactor coolant pump (RCP) flywheels in the CLB needs to be identified as a TLAA The staffs audit assessments of these aspects of the LRA are given in the subsections that follow.
* Review of Topical Reports That May Be Potential Sources of TLAAs In LRA Section 4.1.1, the applicant stated that the methodology for identifying potential sources of TLAAs included a review of WCAP reports that were issued by the Westinghouse Electric Company and are applicable to the CLB for Waterford 3. During the audit, the staff asked the applicant whether its review of TRs was limited only to WCAP reports issued by the Westinghouse Electric Company and whether the TR review statement in LRA Section 4.1 should be interpreted to mean that the applicant had reviewed all TRs included in the Waterford 3 CLB. The applicant noted that the statement in LRA Section 4.1 was intended to mean that the applicant had reviewed all applicable TRs that apply to the CLB. The applicant stated that the review also included but was not limited to TRs issued by the Combustion Engineering Company, its owners group, and other applicable vendors, such as Chicago Bridge and Iron-Work (CB&I)
Company or Structural Integrity Associates, Inc.
During the audit, the staff verified that the applicants review of applicable TRs included those from other vendor sources as discussed in the previous paragraph. Thus, the staff finds that the applicant adequately reviewed applicable TRs to identify TLAAs and the applicants review scope was not limited only to those issued by the Westinghouse Electric Company. The staff will document this audit result in Section 4.1 of the FSER for the LRA.
* Design Analyses for Repaired or Mitigated Nickel Alloy Components in the RCPB During the audit, the staff verified that the following cyclical loading analyses for repaired or mitigated Alloy 600 base metal locations or Alloy 82/182 weld component locations in the RCBP were based on time-dependent assumptions that went beyond the period of extended operation (e.g., those given in the applicable Structural Integrity Associates reports for repaired instrumentation nozzles in the RCS hot legs or pressurizer, or repaired pressurizer heater sleeves). Specifically, the staff verified that the assessment of design transient cycles for the applicable flaw growth or fracture mechanics evaluations were based on a 45-year projection basis. Since Waterford 3 was licensed to operate in March 1985, the staff observed that these flaw evaluations would be TLAAs if the overlay modifications were installed between March 1985 and March 2000.
However, the staff verified that the applicant performed the repair activities after March 2000.
Since the repairs of these components were conducted after March 2000, the analyses are projected beyond the period of extended operation for Waterford 3 (i.e., 60 years of operation) and these analyses are not based on time-dependent assumptions defined by
                                          - 105 -
the current operating period. Therefore, the staff finds that these analyses do not meet the third criterion in 10 CFR 54.3(a), and are not identified as TLAAs. The staff will document this audit result in FSER Section 4.1 for the LRA.
* Metal Fatigue Analyses for Large Bore, Class 1 Valves in the RCPB The staff noted that FSAR Table 3.9-9 identifies that the plant design includes large bore (greater than 4-inch nominal point size (NPS)), Class 1 valves in the RCBP as follows:
(a) four 8-inch header-to-reactor coolant loop inboard containment isolation valves in the low pressure safety injection system, (b) four 12-inch safety injection tank outlet check valves, (c) four 12-inch safety injection header check valves, (d) two 14-inch reactor coolant loop shutdown cooling upstream suction isolation valves, and (e) two 14-inch reactor coolant loop shutdown cooling suction inboard containment isolation valves. The staff also noted that FSAR Section 3.9.1.1.2 indicates that the CLB for Waterford 3 includes applicable cyclical loading and transient analyses for these valves. However, the staff also observed that the applicant did not clearly address the cyclical loading analyses for these valves in the metal fatigue analysis section for ASME Code Class 1 components in the LRA (i.e., LRA Section 4.3.1 with its subsections).
During the audit, the staff asked the applicant to clarify whether LRA Section 4.3.1 includes a metal fatigue analysis for the ASME Class 1, large bore valves. The applicant explained that the metal fatigue analyses for the ASME Code Class 1, large bore valves are included in LRA Section 4.3.1.7 because the valves are considered piping components. The staff reviewed the information in LRA Section 4.3.1.7 to verify the validity of this statement by the applicant.
The staff observed that the cyclical loading analyses (i.e., fatigue analyses) for the Class 1 piping components are discussed in FSAR Section 5.4.3. Similarly, the cyclical loading analyses for Class 1, large bore valves are discussed in FSAR Section 5.4.12.
The staff also noted that, although LRA Section 4.3.1.7 appropriately discusses the fatigue analyses for the piping consistent with the information in FSAR Section 5.4.3, including the applicants basis for accepting these analyses in accordance with 10 CFR 54.21(c)(1)(iii), the LRA section does not reference the metal fatigue analysis (i.e., cyclical loading and design transient assessment) for the large bore, Class 1 valves that is included in FSAR Section 5.4.12. Therefore, during the exit meeting for the audit (July 28, 2016), the staff informed the applicant that the LRA does not include the appropriate metal fatigue TLAA for the ASME Code Class 1, large bore valves in LRA Section 4.3.1.7 because the section does not make any reference to the assessment in FSAR Section 5.4.12. The staff informed the applicant that an administrative amendment will need to be made to LRA Section 4.3.1.7 to reference the metal fatigue analyses for the large bore, Class 1 valves and the assessment of these valves in FSAR Section 5.4.12. The staff will consider issuing an RAI on this matter and will document this in Sections 4.1 and 4.3.1.7 of the FSER.
* Fatigue Waiver Analysis for the Metal Containment Vessel During the audit, the staff noted that the applicants CLB includes a fatigue waiver analysis for the metal containment vessel as performed to demonstrate conformance with the six criteria for fatigue waiver specified in the ASME Code Section III, paragraph NB-3222.4 (d). The staff identified that the applicable analysis is included in the stress analysis for the metal containment vessel, as performed by the Chicago
                                                  - 106 -
Bridge and Iron-Works Company (CBI) on behalf of the applicant. The staff also reviewed the fatigue waiver analysis and verified that the analysis was not based on any time-dependent assumptions defined by the current operating period. Therefore, the staff has confirmed that the fatigue waiver analysis for the metal containment vessel does not conform to the third Criterion in 10 CFR 54.3(a) and, therefore, is not identified as a TLAA for the LRA. The staff will document this determination in Section 4.1 of the FSER for this LRA.
* Fatigue Flaw Growth Analysis for the Reactor Coolant Pump Flywheels As part of the audit activities, the staff reviewed the vendor report that was used to assess the structural integrity of the RCP flywheels in the plant design. The staff verified that the fatigue flaw growth analysis included in the report assessed flaw growth in the flywheels using a number of pump startup-shutdown cycles more than two times the number of pump startup-shutdown cycles assumed in the 40-year plant design. Based on this review, the staff has confirmed that the fatigue flaw growth analysis for the RCP flywheels is not based on time-dependent assumptions defined by the current operating period, as the time frame for assessing cycles in the analysis extends beyond the proposed 60-year period of extended operation. Therefore, the staff determined that the applicant has provided an adequate basis in the LRA for concluding that this analysis does not meet the criteria for the definition of a TLAA in 10 CFR 54.3(a). The staff will document this topic and the related discussion in Section 4.1 of the FSER for this LRA.
Audit Results. Based on this audit, with the exception of the metal fatigue analyses (i.e., cyclical loading and design transient analyses) for the large bore, Class 1 valves, the staff has verified that the applicant has implemented a sufficient methodology for identifying TLAAs in the LRA, and has identified all applicable TLAAs in the LRA, as required by 10 CFR 54.21(c)(1).
The staff is considering the issuance of an RAI to resolve the administrative TLAA identification issue for large bore, Class 1 valves at the plant.}}

Latest revision as of 06:55, 30 October 2019

Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review
ML17054C529
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/09/2017
From: Phyllis Clark
License Renewal Projects Branch 1
To: Chisum M
Entergy Operations
Phyllis Clark, NRR/DLR, 415-6447
References
CAC MF7492
Download: ML17054C529 (108)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2017 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.

Waterford 3 17265 River Road Killona, LA 70057-3093

SUBJECT:

AGING MANAGEMENT PROGRAMS AUDIT REPORT REGARDING WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF7492)

Dear Mr. Chisum:

By letter dated March 23, 2016, Entergy Operations, Inc. submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). On July 29, 2016, the staff completed the onsite audit of aging management programs. The audit report is enclosed.

If you have any questions, please contact me by telephone at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.

Sincerely,

/RA/

Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosure:

Audit Report cc: Listserv

SUBJECT:

AGING MANAGEMENT PROGRAMS AUDIT REPORT REGARDING WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REVIEW (CAC NO. MF7492)

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMWaterford Resource RidsRgn4MailCenter@nrc.gov


PClark SBloom DMorey BWittick AJohnson AGhosh, OGC DMcIntyre, OPA SBurnell, OPA AMoreno, OCA FRamirez, RIV CSpeer, RIV KKennedy, RIV jjarrel@entergy.com dfrey@entergy.com lmilste@entergy.com GYOUNG4@entergy.com Dlach@entergy.com ataylo1@entergy.com aharris@entergy.com ADAMS Accession Number: ML17054C529 *Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RARB:DLR BC:RASB:DLR NAME *YEdmonds PClark DMorey BWittick (BRoger for)

DATE 3/13/17 3/13/2017 4/28/2017 5/4/2017 OFFICE (A)BC:ESGB:DE (A)BC:RPB1:DLR PM:RPB1:DLR NAME AJohnson RChazell PClark DATE 3/20/17 3/16/17 5/9/2017 OFFICIAL RECORD COPY

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION, DIVISION OF LICENSE RENEWAL Docket No: 50-382 License No: NPF-38 Licensee: Entergy Operations, Inc.

Facility: Waterford Steam Electric Station, Unit 3 Location: Killona, LA Dates: July 11-July 15, 2016 July 25-July 29, 2016 Reviewers: P. Clark, Project Manager, Division of License Renewal (DLR)

D. Morey, Branch Chief, DLR B. Wittick, Branch Chief, DLR A. Buford, Structural Engineer, DLR S. Cuadrado de Jesús, General Engineer, DLR W. Holston, Sr. Mechanical Engineer, DLR A. Wong, Sr. Project Manager, DLR Z. Bart Fu, Mechanical Engineer, DLR S. Min, Materials Engineer, DLR M. Yoo, General Engineer, DLR C. Doutt, Sr. Electrical Engineer, DLR J. Gavula, Mechanical Engineer, DLR B. Lehman, Materials Engineer, DLR J. López, Structural Engineer, DLR A. Mink, Mechanical Engineer, DLR D. Brittner, Mechanical Engineer, DLR A. Prinaris, Structural Engineer, DLR W. Gardner, General Scientist, DLR M. Sadollah, Electrical Engineer, DLR G. Thomas, Sr. Structural Engineer, DLR H. Akhavannik, Electrical Engineer, DLR A. Huynh, Materials Engineer, Division of Engineering J. Medoff, Sr. Mechanical Engineer, DLR S. Obadina, Mechanical Engineer, DLR B. Allik, Materials Engineer, DLR Enclosure

Approved By: Dennis Morey, Chief Aging Management of Reactor Systems Branch Division of License Renewal Brian Wittick, Chief Aging Management of Structures, Electrical, and Systems Branch Division of License Renewal Andrew Johnson, Acting Chief Steam Generator Tube Integrity and Chemical Engineering Branch Division of Engineering

Introduction The U.S. Nuclear Regulatory Commission (NRC or the staff) conducted a 10-day audit onsite at the Waterford Steam Electric Station, Unit 3 (Waterford 3), nuclear power plant in Killona, Louisiana, from July 11, 2016, to July 29, 2016. Additional in-office document review was conducted before and after the onsite audit. The purpose of the audit was to examine Entergy Operations, Inc. (Entergy or the applicant), aging management programs (AMPs) and related documentation to verify the applicants claims of consistency with the corresponding AMPs in NUREG-1801, Generic Aging Lessons Learned (GALL) Report - Final Report, Revision 2, issued December 2010. As described in the GALL Report, the staff based its evaluation of the adequacy of each AMP on its review of the following 10 program elements in each AMP:

(1) scope of program; (2) preventive actions; (3) parameters monitored or inspected; (4) detection of aging effects; (5) monitoring and trending; (6) acceptance criteria; (7) corrective actions; (8) confirmation process; (9) administrative controls; and (10) operating experience.

Exceptions to the GALL Report AMP elements will be evaluated separately as part of the staffs review of the Waterford license renewal application (LRA) and documented in the staffs safety evaluation report (SER).

NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, (SRP-LR), Revision 2, issued December 2010, provides staff guidance for reviewing an LRA. The SRP-LR allows an applicant to reference in its LRA the AMPs described in the GALL Report. By referencing the GALL Report AMPs, the applicant concludes that its AMPs correspond to those AMPs reviewed and approved in the GALL Report and that no further staff review is required. If an applicant credits an AMP for being consistent with a GALL Report program, it is incumbent on the applicant to ensure that the plant program contains all of the elements of the referenced GALL Report program. The applicants determination should be documented in an auditable form and maintained onsite.

During the audit, the staff audited AMP elements 1 through 6 and 10 (scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and operating experience). These elements of the applicants AMPs were claimed to be consistent with the GALL Report and were audited against the related elements of the associated AMP described in the GALL Report, unless otherwise indicated in this audit report. Elements 7 through 9 (corrective actions, confirmation process, and administrative controls) were audited during the scoping and screening methodology audit conducted June 13, 2016, to June 16, 2016, and are evaluated separately.

The staff audited all AMPs that the applicant stated were consistent with the GALL Report AMPs.

During the audit, if the applicant took credit for a program in the GALL Report, the staff verified that the plant program contained all of the elements of the referenced GALL Report program. In addition, the staff verified that the conditions at the plant were bounded by the conditions for which the GALL Report program was evaluated.

In performing the audit, the staff examined the applicants LRA, program basis documents, and related references; interviewed various applicant representatives; and conducted walkdowns of several plant areas. In total, 41 AMPs were reviewed and 36 breakout (discussion) sessions with applicant representatives were conducted. This report documents the staffs activities during the audit.

LRA AMP B.1.1, Bolt Integrity Summary of Information in the Application. The LRA states that AMP B.1.1, Bolting Integrity, is an existing program with enhancements and an exception that will be consistent with the program elements in GALL Report AMP XI.M18, Bolting Integrity. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The exception and enhancements to the GALL Report AMP will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted a walkdown of the component cooling water (CCW) heat exchanger room B. The staff also conducted an independent search of the applicants operating experience database using keywords: bolt, preload, crack, leak, corrosion, molybdenum, MoS2, and disulfide.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical
2. EN-MA-145 Maintenance Standard for Torque Applications Revision 5
3. UNT-006-032 Coating and Corrosion Program Revision 0
4. EN-DC-150 Condition Monitoring of Maintenance Rule Structures Revision 7
5. CR-WF3-2015-00947 Condition Report 02/19/2015
6. N/A Response to WF3 Action Item #16 07/08/2014
7. N/A Response to WF3 Action Item #70 07/09/2014
8. EN-DC-150 Condition Monitoring of Maintenance Rule Structures Revision 7
9. EN-DC-178 System Walkdowns Revision 7
10. SEP-RR-WF3-001 ASME Section XI Repair/Replacement Program Revision 0
11. EN-LI-102 Corrective Action Program Revision 24
12. CEP-PT-001 ASME Section XI Pressure Testing Program Revision 306
13. CEP-NDE-0901 VT-1 Visual Examination (ASME XI) Revision 4
14. CEP-NDE-0902 VT-2 Visual Examination (ASME XI) Revision 7
15. CEP-NDE-0903 VT-3 Visual Examination (ASME XI) Revision 5
16. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
17. CR-WF3-2015-01853 Condition Report 03/30/2015
18. WO-410215 RFRMVAAA105-A Flange Bolts Replacement (2015-1853) 04/07/2015
19. WO-368658 RFRMCHL0001-A Inspect/Leak Check Chiller Piping 06/24/2015
20. CR-WF3-2015-01852 Condition Report 03/30/2015

Document Title Revision/Date

21. WO-410214 RFRMCHL0001-A Flange Bolting Replacement (2015-1852) 04/07/2015
22. CR-WF3-2015-09705 Condition Report 12/30/2015
23. CR-WF3-2015-09704 Condition Report 12/30/2015 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that aspects of the detection of aging effects program element, not associated with the exception, are not consistent with the corresponding program element in the GALL Report AMP. The staffs evaluation of aspects of the program element associated with the exception will be addressed in the SER. In addition, the staff found that for the detection of aging effects program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing a request for additional information (RAI) for the subject discussed below.

  • The LRA AMP states an enhancement to the scope of program program element. The enhancement states that the Bolting Integrity Program procedures will be revised to include submerged pressure-retaining bolting. The GALL Report AMP XI.M18 detection of aging effects program element recommends periodic inspections (at least once per refueling cycle) of closure bolting for signs of leakage to ensure the detection of age-related degradation due to loss of material and loss of preload. During its onsite review of the LRA and program basis documents, the staff noted that the applicants program lacked information regarding how inspections of the submerged bolting will be performed to detect the applicable aging effects. The staff notes that a submerged environment limits the ability to perform inspections and detect leakage of submerged bolted connections; therefore, it is not clear how the submerged closure bolting will be inspected such that loss of material and loss of preload can be detected prior to loss of intended function consistent with the GALL Report AMP detection of aging effects program element.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The staff also determined that the operating experience provided by the applicant and identified by the staffs independent database search is not sufficient to allow the staff to verify that the LRA AMP, as implemented by the applicant, is sufficient to detect and manage the effects of aging. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing an RAI for the subject discussed below.

  • The GALL Report AMP XI.M18 states that molybdenum disulfide (MoS2) should not be used as a lubricant because of its potential contribution to stress corrosion cracking (SCC), especially for high-strength bolts. The GALL Report AMP XI.M18 states that preventive actions include the proper selection of bolting material and the use of lubricants and sealants consistent with the guidance in Electric Power Research Institute

(EPRI) NP-5769 and NUREG-1339 to prevent or mitigate degradation and failure of safety-related bolting. The GALL Report also states that the applicant is to evaluate applicable operating experience to support the conclusion that the effects of aging are adequately managed. The LRA states that the Bolting Integrity Program includes preventive actions to restrict the use of lubricants containing MoS2. The LRA AMP also states that applicable industry standards and guidance documents, including NUREG-1339, EPRI NP-5769, and EPRI TR-104213, were used to develop the program implementing procedures. During its onsite audit, the staff performed a database search of Waterford 3 operating experience and found no results for the keywords molybdenum, disulfide, and MoS2 associated with the installation of closure bolts.

The staff also reviewed plant procedures and confirmed that the bolting procedures had been revised to prohibit the use of MoS2; however, it is not clear whether MoS2 lubricants were used at Waterford 3 before plant procedures were revised to prohibit their use. The staff needs additional information on whether MoS2 lubricants were used at Waterford 3; and, if so, how the Bolting Integrity Program will manage the age-related degradation of closure bolts lubricated with MoS2. The staff also noted that this is a common issue across B.1.1 Bolting Integrity, and B.1.16 Inservice Inspection - IWF AMPs.

The staff also audited the description of the LRA AMP provided in the final safety analysis report (FSAR) supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M18. The staffs evaluation of aspects of the detection of aging effects program element associated with exceptions will be addressed in the SER. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.2, Boric Acid Corrosion Summary of Information in the Application. The LRA states that AMP B.1.2, Boric Acid Corrosion, is an existing program that is consistent with the program elements in GALL Report AMP XI.M10, Boric Acid Corrosion. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: boric, corr, encrust, and residue.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00002 Operating Experience Review Results - Aging Effects Revision 0 Requiring Management
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.1.2 Boric Acid Corrosion
3. WF3-EP-14-00007 AMP Evaluation Results - Non-Class 1 Mechanical, Revision 1 Section 4.2 Boric Acid Corrosion
4. EN-DC-319 Boric Acid Corrosion Control Program Revision 10
5. SEP-BAC-WF3-001 Boric Acid Corrosion Control, Program Section Revision 1
6. CEP-CAC-001 Boric Acid Corrosion Control, Program Plan Revision 1
7. Program Health Report BACCP - Boric Acid Corrosion Control Program Q2-2015
8. Program Health Report BACCP - Boric Acid Corrosion Control Program Q4-2015
9. CR-WF3-2013-05809 The monthly performance indicator for externally identified N/A Condition Reports (CR) was red for November 2013.
10. CR-WF3-2014-02771 Active leak on RC-301A. Repeat from CR-WF3-2013-00166 N/A
11. CR-WF3-2014-06493 White Boric Acid Not an Active Leak N/A
12. CR-WF3-2015-00228 White Boric Acid Not an Active Leak N/A
13. CR-WF3-2015-00280 Dry White Boric Acid on HPSI Pump Casing N/A During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.

The staff also audited the description of the AMP provided in the FSAR supplement in LRA Section A.1.2. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M10. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.3, Buried and Underground Piping and Tanks Inspection Summary of Information in the Application. The LRA states that AMP B.1.3, Buried and Underground Piping and Tanks Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.M41, Buried and Underground Piping and Tanks, as modified by LR-ISG-2011-03, Changes to the GALL Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document, cathodic protection survey results, coating and backfill specifications, qualifications of coating inspectors, inspection reports, and a review of plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: buried, coat, concrete, crack, wrap, wall loss, vault, underground, through wall, piping, min wall, microbiologic, loss of material, holiday, flaw, excavat, and leak.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical Systems
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. WF3-ME-14-00009 Aging Management Review of the Component Cooling and Revision 1 Auxiliary Component Cooling Water Systems
4. NUC2013155.00 Concrete Evaluation Conducted in Excavations #1 and #2 Revision 0, Conducted on 12/05/2013 01/16/2014
5. LM-0311 Qualification Card for Coating Inspectors Meeting Coating QC 06/29/2016 Inspector Level 3 (Fleet Curriculum)
6. EN-QV-111 Training and Certification of Inspection/Verification and Revision 16 Examination Personnel
7. CP 3-2016 8287E Cathodic Protection System Survey Underground Piping and March 2016 Cathodic Protection Grounding Waterford 3 Site CCC Job No. 8287E Survey
8. CR-WF3-2013-06121 Cathodic Protection Availability and Rectifier Modification 12/20/2013
9. Work Order CP ECTR14243-TRANSF PERFORM FUNCTIONAL 02/03/2016 52657334 01 TEST/ME-004-431
10. Work Order CP ECTR14243-TRANSF PERFORM FUNCTIONAL 04/21/2016 52665515 01 TEST/ME-004-431
11. Work Order CP ECTR14243-TRANSF PERFORM FUNCTIONAL 07/20/2016 52682189 01 TEST/ME-004-431

Document Title Revision/Date

12. WF3 Piping Ebasco Specification Station Piping, Hangers and Supports Revision 8, Specification 1564.100 06/21/1995 During the audit of program elements 1 through 7, the staff could not verify that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the Buried and Underground Piping and Tanks Inspection program will be consistent with the program elements in GALL Report AMP XI.M41 as modified by LR-ISG-2011-03. However, on February 4, 2016, the staff issued the final version of LR-ISG-2015-01, Changes to Buried and Underground Piping and Tank Recommendations, which replaces AMP XI.M41 issued in LR-ISG-2011-03. The staff will consider issuing an RAI to compare the Buried and Underground Piping and Tanks Inspection program to AMP XI.M41 issued in LR-ISG-2015-01.

During the audit, the staff made the following observations:

  • The staff reviewed WF3-ME-14-00009 and noted that concrete pipe in contact with soil has embedded steel reinforcement. During a breakout session, the staff noted that reinforced concrete, or cementitious material, has cathodic protection listed as a preventive action in LR-ISG-2015-01 but not in LR-ISG-2011-03.
  • The staff reviewed NUC2013155.00 and noted that during an inspection and assessment of the exterior of buried pipe encased in concrete, a feeler gage was used to determine the depth of a crack and that the crack did not penetrate to the surface of the pipe. This is consistent with the recommendations of LR-ISG-2015-01, which states that cracks in controlled low-strength material backfill that could admit groundwater to the surface of the component are not acceptable.
  • The staff reviewed LM-0311 and noted that coating inspectors are qualified to Coating QC Inspector Level 3. During a breakout session, the staff asked how this qualification is consistent with the recommendations in LR-ISG-2015-01 regarding the qualifications of individuals evaluating the extent of coating degradation. In response, the applicant provided EN-QV-111, which provided training and certification of inspection/verification and examination personnel. The staff reviewed EN-QV-111 and noted that individuals performing coating inspections are qualified in accordance with ANSI/ASME N.45.2.6-1978 Level III. The staff noted during a breakout session that this standard is not consistent with the recommendations in LR-ISG-2015-01 for individuals evaluating the extent of coating degradation.
  • The staff reviewed CP 3-2016 8287E Cathodic Protection Survey and noted that a 100 mV polarization acceptance criteria was used because of the dissimilar metals in the system. During a breakout session, the staff noted that the use of a 100 mV polarization with dissimilar (i.e., mixed-metal) environments is not consistent with the recommendations in LR-ISG-2015-01.
  • During its review of plant-specific operating experience, the staff reviewed CR-WF3-2013-06121. The staff noted that during the 5-year period from January 2009 to January 2014, the system had been out of service for 43 of 60 months, which represents a system availability of 28 percent. The staff noted that this is not consistent

with the recommendations of LR-ISG-2015-01, which recommends an availability of 85 percent for an effective cathodic protection system. In addition, the staff noted that breaks in a buried cable that provided DC current from the rectifier to the anode bed were the apparent cause. Furthermore, the staff noted that a modification was completed in June 2014, to move the rectifier closer to the anode bed to reduce the frequency of breaks in the power supply cable.

  • The staff reviewed CP ECTR14243-Trans. Performance Functional Test/ME-004-431, which performed a test of the rectifier input current and rectifier voltage output every 3 months during 2016. The staff noted that rectifier input current and rectifier voltage output met acceptance criteria for all three work orders.
  • The staff reviewed WF3 Piping Specification 1564.100 and noted that all ferrous buried piping under reinforced concrete slabs and within 50 feet of reinforced concrete slabs or concrete circulating water lines was encased in a cement-sand mortar envelope (i.e., controlled low-strength material). In addition, the staff noted that ferrous piping 50 feet or more away from reinforced concrete slabs or concrete circulating water lines was coated with coal tar enamel.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. The staff will consider issuing an RAI requesting that the applicant compare the Buried and Underground Piping and Tanks Inspection FSAR supplement to the FSAR summary description issued in LR-ISG-2015-01.

Audit Results. Based on this audit, the staff noted that the Buried and Underground Piping and Tanks Inspection program has not been evaluated against the changes to AMP XI.M41 that were issued in LR-ISG-2015-01. Therefore, the staff has identified certain aspects of the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.4, Coating Integrity Summary of Information in the Application. The LRA states that AMP B.1.4, Coating Integrity, is a new program with an exception that will be consistent with the program elements in GALL Report AMP XI.M42, Internal Coatings/Linings for In-scope Piping, Piping Components, Heat Exchangers, and Tanks, as described in LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks. To verify this claim of consistency, the staff audited the LRA

AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and plant-specific operating experience.

Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an exception associated with this AMP. The exception to the GALL Report AMP is evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: blister, block, clog, coat, delamin, flak, foul, holiday, lined, lining, peel, and perforat.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical, Coating Integrity
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.2.2, Coating Integrity
3. WF3-ME-14-00030 License Renewal Topical Report on Coating Integrity Revision 0
4. 1564-3279 Turbine Cooling Water Surge Tank Revision 0
5. CR-WF3-2009- Diesel Fire Pump B - Potential Coating Debris Inside of Heater 11/09/2009 06452 Causing Flow Blockage The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the new program as modified by the proposed exception.

During the audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the detection of aging effects program element not associated with the exception identified in the LRA are consistent with the corresponding program element in the GALL Report AMP. The staffs evaluation of aspects of this program element associated with the exception will be addressed in the SER. In addition, the staff found that for the scope of program, program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The scope of program program element of the LRA AMP states that coatings that are within the scope of the program are those that are applied to the internal surfaces of in-scope components where loss of coating or lining integrity could impact the components and downstream components current licensing basis (CLB) intended function(s). The GALL Report AMP recommends that coatings are within the scope of the AMP where loss of coating or lining integrity could prevent satisfactory

accomplishment of any of the components or downstream components CLB intended functions identified under 10 CFR 54.4(a)(1), (a)(2), or (a)(3). It is not clear to the staff that these statements are consistent because the term and implies that both the components intended function and a downstream components intended function must be impacted by loss of coating integrity for the coating to be within the scope of the program. AMP XI.M42 recommends that the criteria for inclusion are either of the impacts. This issue also impacts the LRA FSAR description of the Coating Integrity Program.

  • During its review of plant-specific operating experience, the staff reviewed CR-WF3-2009-06452. This condition report documents that the internal surfaces of the fire pump diesel jacket water cooling heater might be coated. The LRA Table 2s do not cite this component.

In order to verify that the exception will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.

  • The LRA AMP states an exception to the detection of aging effects program element.

The exception states that the program will provide a one-time inspection of the internal coating for the 11-foot diameter carbon steel circulating water piping. The exception does not state that periodic inspections will be subsequently conducted if the one-time inspection results do not meet acceptance criteria.

During the audit, the staff made the following observations:

  • The staff reviewed WF3-ME-14-00030 and confirmed that the applicant identified six tanks that are internally lined; however, the tanks have not been included within the scope of the Coating Integrity Program. The staff noted that all of the tanks are within the scope of license renewal because they have an intended function per 10 CFR 54.4(1)(2). The document states that downstream aging effects will not occur because either coating debris would be captured by resin or resin retention elements, or pass through to other nonsafety-related components or the river. The basis for not including these tanks is as follows: (a) with the exception of the supplemental chilled water expansion tank and turbine cooling water surge tank, there are no safety-related components within the vicinity of the tanks that could be impacted should the tank leak; and (b) there are no downstream effects on safety-related equipment.
  • WF3-ME-14-00030 states that the essential chilled water expansion tanks are the only safety-related component located in the vicinity of the supplemental chilled water expansion tank. The supplemental chilled water expansion tank is at atmospheric pressure.
  • WF3-ME-14-00030 states that the turbine cooling water surge tank is located in the CCW surge tank room with the safety-related CCW surge tank. The turbine cooling water surge tank is at atmospheric pressure. The staff reviewed drawing 1564-3279 and confirmed that the tank is approximately 7 feet tall.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The applicant stated that the Coating Integrity Program is a new program and plant operating experience will be obtained as it is implemented. The staff

noted that AMP XI.M42, the basis for the Coating Integrity Program, was based on industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. With the exception of the issue identified in the scope of program program element, above, the staff verified this description is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2013-01.

Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M42. The staff also verified that for the detection of aging effects program element, the aspects of the LRA AMP program element not associated with the exception are consistent with the corresponding program element in GALL Report AMP XI.M42.

The staffs evaluation of aspects of the program elements associated with exceptions will be addressed in the SER. The staff also identified certain aspects of the scope of program and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.5, Compressed Air Monitoring Summary of Information in the Application. The LRA states that AMP B.1.5, Compressed Air Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M24, Compressed Air Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Reactor auxiliary building, the Cooling Tower Area, and the Turbine Generator Building. The staff also conducted an independent search of the applicants operating experience database using keywords: instrument air, compressed air, GL 88-14, INPO SOER 88-01, air samples, dew point, particulates, corrosion products, contaminants, and leaks.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3 Response to Waterford 3 SES Docket No. 50-382 License No. NPF-38 Generic 02/21/1989 GL 88-14 Letter [GL] 88-14
2. WF3-ME-14-00013 Aging Management Review of the Air System Revision 0, 04/10/2015

Document Title Revision/Date

3. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0, Mechanical Compressed Air Monitoring 01/0/2016
4. TRM Waterford 3 Technical Requirements Manual (TRM) Amendment 91
5. Entergy Operations Compressed Air Systems Design Basis Document November 1995 Inc., Waterford SES Unit No. 3
6. CE-002-032 Maintaining Instrument Air System Revision 305, 11/03/2014
7. MM-006-034 Station and Instrument Air Compressor Maintenance Revision 305, 04/11/2012
8. CE-001-004 Periodic Analysis and Scheduling Program Revision 315, 02/05/2015
9. Work Order - IA Replace Inlet and Discharge Air Filters Completed MCMP0001 A 08/25/2014
10. Work Order - IA Replace Desiccant Absorber Completed MTWR0001 C&D 09/15/2015
11. Work Order - IA Remove and Clean Separator Y-Strainer Completed MCMP0001 A 02/26/2015
12. Work Order - IA Lube Compressor Bearings, Purge Coupling Completed MCMP0001 A 02/05/2015
13. CR-WF3-2014- A small leak was discovered on the Emergency Diesel Generator 05/11/2014 01061 (EDG) A starting air system tube fitting near the Air Dryer AZ Repressuring Valve.
14. CR-WF3-2014- Packing gland leakage was found at Instrument Air Valve to 04/29/2014 02354 Nitrogen ACC-4 Header; leakage is outside the pressure testing boundary and acceptable per CEP-NDE-0902.
15. CR-WF3-2014- Recommendation 4 in INPO SOER 88-01 Instrument Air System 01/03/2014 00021 Failures (dated June 3, 1988) was revised to require the use of most current instrument air quality standards.
16. CR-WF3-2013- A small air leak was discovered between fittings on the airline 05/13/2013 02375 downstream of IA-5277 (IA Isolation to FW-173B Isol to VLV FW-173B).
17. CR-WF3-2013- Control Room received IA Dryer B Trouble Alarm multiple times 05/07/2013 02290 during the day due to Hi Dew Point. One of the IA Dryer Skid B prefilter drain traps was found half full of water.
18. CR-WF3-2012- SOER 88-01 Evaluation Guideline states to measure any 03/02/2012 01091 particulates absolute > 40 µm. This should be included in procedure CE-002-032 Maintaining Instrument Air System (Revision 302, dated 3/1/2011) so it is clear how the vendor measures and categorizes particulate sizes.
19. CR-WF3-2011- An instrument air leak on the pneumatic air filter was discovered 09/06/2011 026276 inside the shroud of FW MVAAA184-A.
20. CR-WF3-2010- No actions or programs specific to the instrument air or station air 08/11/2010 04899 compressors area to prevent corrosive or hazardous gases from entering into the air systems, as stated in the special consideration section of SOER 88-01 Evaluation that requires the instrument air be free of corrosive and hazardous gases.

Document Title Revision/Date

21. CR-WF3-2006- A small air leak was discovered upstream of the manual isolation 03/06/2006 00666 for the air regulator but downstream of IA-5701 (maintenance air for the A EDG) next to the regulator.
22. ISTEP Integrated System Trending and Evaluation Program 07/13/2016 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit, the staff made the following observations:

  • For the preventive actions program element, the staff noted that the GALL Report recommends that moisture and other corrosive contaminants in the systems air are maintained below specified limits to ensure that the system and components maintain their intended functions. In addition, the staff noted that the applicant followed procedure CE-002-032 (Revision 305, 11-03-2014, section 10.1) to analyze air samples for particulates, dew point, and hydrocarbon using acceptance criteria from (ANSI)/ISA-7.0.01-1996, Quality Standard for Instrument Air, a guidance document referenced in the GALL Report.
  • For the detection of aging effects program element, the staff noted that the GALL Report recommends that the typical compressed air systems are equipped with in-line dew point instrumentation that either checks continuously using an automatic alarm system or is checked at least daily to ensure that moisture content is within specifications. The staff noted that the applicant documented an incidence in which the Control Room had received high dew point alarms for the Instrument Air (IA) Dryer B (CR-WF3-2013-02290). Water was found in the IA Dryer Skid B prefilter drain traps.

Additionally, the GALL Report recommends periodic visual inspections of critical component internal surfaces (compressor, dryers, aftercoolers, and filters) to ensure no loss of material due to corrosion. The staff also noted that the applicant routinely maintained the air systems. For example, the instrument air inlet and outlet filters are replaced annually (e.g., Work Order - IA MCMP0001 A, 08-25-2014). The instrument air compressors are maintained, inspected, and/or replaced based on performance under procedure MM-006-034 (Revision 305, 04-11-2012).

  • For the monitoring and trending program element, the staff noted that the GALL Report recommends air quality analysis results should be reviewed to determine if alert levels or limits have been reached or exceeded. The staff noted that the applicant relied on computerized tools (e.g., Integrated System Trending and Evaluation Program) to monitor and trend plant systems (e.g., instrument air system) performance.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M24. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.6, Containment Inservice Inspection - IWE Summary of Information in the Application. The LRA states that AMP B.1.6, Containment Inservice Inspection - IWE, is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.S1, ASME Section XI, Subsection IWE.

To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an enhancement associated with this AMP. The enhancement to the LRA AMP is evaluated in the SER. The LRA states that the Waterford 3 containment is a free-standing steel containment vessel (SCV) consisting of a vertical upright cylinder with a hemispherical dome and an ellipsoidal bottom encased in concrete and founded on the common concrete foundation with the Shield Building.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, since the plant was in power operation and a walkdown to observe the condition of the steel containment was not possible, the staff reviewed limited available photographs of the Waterford 3 SCV. The staff also conducted an independent search of the applicants operating experience database using keywords:

bellows, bolt, corros, coat, degrad, loss of material, containment, and moisture barrier.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00008 Aging Management Program Evaluation Report (AMPER) Revision 1 Civil/Structural: B.1.6 Containment Inservice Inspection - IWE Program Book
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
3. WF3-EP-14-00002 Operating Experience Review Results - Aging Effects Requiring Revision 0, Management (AERM) 9/13/2015
3. SEP-CISI-104 Program Section for ASME Section XI, Division 1, WF3 Revision 1, Containment Inservice Inspection Program 10/22/2012

Document Title Revision/Date

4. CEP-CII-003 General Visual Examinations of Class MC Components Revision 304, 10/04/2012
5. CEP-NDE-0903 VT-3 Examination (ASME Section XI) Revision 5, 07/29/2009
6. CEP-NDE-0112 Certification of Visual Examination Personnel Revision 9, 11/19/2013
7. EN-MA-145 Nuclear Management Manual: Maintenance Standard for Torque Revision 3, Applications 04/25/2014
8. EN-LI-102 Nuclear Management Manual: Corrective Action Program Revision 24, 09/05/2014
9. EN-DC-141 Nuclear Management Manual: Design Inputs Revision 15, 09/05/2014
10. WF3-CS-14-00001 Aging Management Review of the Reactor Building Revision 1, 06/30/2014
11. W3F1-92-0473 Memo to File: NRC Information Notice 92-20, Inadequate Local 12/22/1992 Leak Rate Testing
12. CEP-RR-001 ASME Section XI, Repair/Replacement Program (fleet-wide) Revision 311, 01/11/2016
13. SEP-RR-WF3-001 Waterford 3 ASME Section XI, Repair/Replacement Program Revision 0, 03/07/2012
14. CR-WF3-2000- Condition Report to evaluate VT-3 examination findings of 10/20/2000 01275 containment vessel interior moisture barrier failure at 22 locations
15. CR-WF3-2000- Condition Report to evaluate VT-3 examination findings of 10/20/2000 01279 containment vessel exterior moisture barrier failure at 20 locations
16. CR-WF3-2000- Condition Report to evaluate visual examination findings of 10/28/2000 01375 containment vessel performed as part of corrective actions [for CR-WF3-2000-01275] revealed corrosion [below annulus moisture barrier] of a greater extent than anticipated
17. CR-WF3-2002- Condition Report to evaluate moisture barrier seal damage in two 03/26/2002 00508 places inside containment
18. CR-WF3-2003- Condition Report on VT-3 examination findings of flaking, peeling, 10/24/2003 03082 blistering, and discoloration of coatings on containment vessel interior
19. CR-WF3-2003- Condition Report on VT-3 examination findings of flaking, peeling, 10/27/2003 03142 blistering, and discoloration of coatings on containment vessel interior
20. CR-WF3-2003- Condition Report to track and trend the findings of the inspection 11/05/2003 03425 of containment vessel surfaces during Refuel 12
21. CR-WF3-2008- Condition Report to evaluate VT-3 inspection findings of 05/01/2008 01858 containment inner moisture barrier damage at six locations
22. CR-WF3-2012- Condition Report to determine extent of condition of SGT NCR 10/19/2012 05353 1082 on conditions related to the annulus moisture barrier
23. CR-WF3-2012- Condition Report to determine extent of condition and repair SGT 12/22/2012 07654 NCR 1175 on conditions related to the annulus moisture barrier
24. ISI-VT-12-071 Visual Examination of IWE Surfaces (General) [RF-18-IWE to 05/08/2014 through -99 Procedure CEP-CII-003 Revision 304]

Document Title Revision/Date

25. ISI-VT-14-027 Visual Examination of Pressure Retaining Bolting (VT-3) 04/19/2014 thru -064 [RF-19-IWE to Procedure CEP-NDE-0903 Revision 005]
26. ISI-VT-15-040 Visual Examination of IWE Surfaces (General) [RF-20-IWE to 11/13/2015 through -054 Procedure CEP-CII-003 Revision 305]
27. ISI-VT-09-030 Visual Examination of IWE Surfaces (General) [RF-16-IWE to 10/31/2009 Procedure CEP-NDE-0903 Revision 005]
28. CR-WF3-2014- Condition Report to document issuance of NRC IN 2014-07 and 05/27/2014 03076 to determine the WF3 impact of it
29. LOU-156 G-175, Drawing Reactor Containment Building Piping Penetrations Revision 18, Sheet 1 of 3 08/06/1997
30. LOU-156 G-175, Drawing Reactor Containment Building Piping Penetrations Revision 19, Sheet 1 of 3 12/20/1995
31. LOU-156 G-175, Drawing Reactor Containment Building Piping Penetrations Revision 15, Sheet 1 of 3 02/08/1996
32. NDE-2000-298 Thickness Readings Adjacent to Corrosion Pits Above Moisture 11/02/2000 Barrier in the Annulus (5 places)
33. NDE-2000-434 Area #15 - Thickness Readings Taken on Annulus Side Liner 11/04/2000 Plate in Knuckle Region
34. NDE-2000-484 Inner Moisture Barrier Reinspection of 22 Areas Identified in 11/07/2000 CR-2000-1275 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.

During the audit, the staff verified that the scope of program, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for preventive actions and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The preventive actions program element of GALL Report AMP XI.S1 states, in part:

The program is also augmented to require that the selection of bolting material installation torque or tension and the use of lubricants and sealants are in accordance with the guidelines of EPRI NP-5769, EPRI TR-104213, and the additional recommendations of NUREG-1339 to prevent or mitigate degradation and failure of structural bolting. The corresponding Section 3.2.B.2b of the LRA Aging Management Program Management Evaluation Report (AMPER) document states, in part: The program is a condition monitoring program and does not include guidance for the selection of bolting material, installation torque or tension, and use of lubricants and sealants. The program is supplemented by existing plant procedures to ensure that the selection of bolting material installation torque or tension, and the use of lubricants and sealants is appropriate for the intended purpose. These procedures use the guidance contained in NUREG-1339 and in EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of bolting material, lubricant, and installation torque. It was not

clear to the staff if the above statements are consistent because (1) it appears to be an enhancement to the LRAs existing code-based condition monitoring [only] program, and (2) there is an apparent lack of a procedural link between the AMP implementing procedures (e.g., SEP-CISI-104, SEP-RR-WF3-001) and the existing supplemental procedures being credited. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection - IWE, and B.1.16, Inservice Inspection - IWF.

  • The preventive actions program element of GALL Report AMP XI.S1 states, in part: If the structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication Specification for Structural Joints Using ASTM A325 or A490 Bolts, need to be considered. The related enhancement to the LRA AMP preventive actions program element intended to achieve consistency states: Revise plant procedures to include the preventive actions for storage of ASTM A325, ASTM F1852 and A490 bolting from Section 2 of Research Council for Structural Connections (RCSC) publication, Specification for Structural Joints Using ASTM A325 or A490 Bolts. The staff also noted that the applicant excluded the use of preventive actions for lubricants and stress corrosion cracking potential by stating that a review of Section 2 of the RCSC publication concluded that the publication only addresses storage and does not address the preventive actions for lubricants and stress corrosion cracking potential for these bolts.

It was not clear to the staff if the above statements are consistent, and if the above enhancement is adequate to make the LRA AMP consistent, because (1) the enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and (2) the related justification provided in the AMPER document appears to interpret the standard in a manner that is inconsistent with the consideration in the GALL Report AMP. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection -

IWE; B.1.16, Inservice Inspection - IWF; and B.1.38, Structures Monitoring.

  • The detection of aging effects program element of the GALL Report AMP X1.S1 recommends that the program be augmented to require surface examination, in addition to visual examination, to detect cracking in stainless steel penetration sleeves, bellows, dissimilar metal welds, and steel components that are subject to cyclic loading but have no CLB fatigue analysis. The GALL Report AMP also states that where feasible, appropriate Appendix J tests may be performed in lieu of surface examination. The corresponding program element in the LRA AMPER document states: Stainless steel penetration sleeves, dissimilar metal welds, bellows, and steel components that are subject to cyclic loading but have no CLB fatigue analysis are monitored for cracking.

Additionally, AMP X1.S4 Containment Leak Rate Program (10 CFR Part 50, Appendix J) tests may be performed in lieu of surface examination. Noting that visual examination may not detect fine cracks that could occur as a result of cyclic loading, and that the LRA AMP did not identify any enhancement to supplement the existing program and implementing procedures with the enhanced examination method capable of detecting cracking, it was not clear to the staff that these statements are consistent because the LRA AMP and implementing procedures do not clearly reflect whether surface examinations will be conducted, in addition to visual examination, to detect cracking, or if Appendix J testing will be performed instead; nor does it identify the specific components to which each detection method will be applied. If Appendix J testing will be performed,

the LRA does not specify the type of testing or explain why the testing is appropriate for timely detection of cracking.

During the audit, the staff made the following observations:

  • The staff reviewed Nondestructive Evaluation (NDE) Reports of ultrasonic thickness (UT) and pit measurements of the SCV plate, in the knuckle region with observed corrosion indications, taken above and below the annulus moisture barrier in Area #15 that were evaluated as part of condition reports CR-WF3-2000-01279 and CR-WF3-2000-01375. The staff noted that the thickness readings in the examined areas varied from 2.261 inches to 2.367 inches, all of which were above the design thickness of 2.1875 inches in the knuckle region. The staff also noted that the pit depths varied from 0.031 inch to 0.109 inch, all of which were significantly smaller than 10 percent of the design metal plate thickness. Therefore, following UT measurements and determination that the corrosion mechanism was not active, the surface areas with corrosion noted in 2000 in the annulus moisture barrier area were accepted by examination.
  • The staff reviewed CR-WF3-2014-03076, which dispositioned NRC Information Notice (IN) 2014-07 and confirmed that Waterford 3s containment metal shell is not designed with leak-chase channel systems related to the operating experience described in the IN.
  • The staff reviewed Section 3.2.A.b of the AMPER document and noted that the technical evaluation of NRC IN 92-20 for applicability concluded that a valid Type B local leakage rate test (LLRT) of the Waterford 3 containment penetration bellows could be performed in accordance with the requirements of 10 CFR Part 50 Appendix J; therefore, the IN recommendation for augmented inspection of the bellows does not apply to the Waterford 3 program. The staff also reviewed memo W3F1-92-0473, which documented the review of IN 92-20, and confirmed that for the multi-ply bellows used on containment piping penetrations, a mesh wire cloth between the plies ensures a gap for adequate performance of a LLRT.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is generally bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion was identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants plant-specific operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The staff reviewed condition report CR-WF3-2000-01375, dated October 28, 2000, which documented corrective actions to address plant-specific operating experience of corrosion, with flaking noted on the SCV to a depth of at least 18 inches below the surface of the outer moisture barrier in the annulus region. This condition appeared to exist around the entire knuckle region of the containment vessel within the annulus and it is not addressed in LRA AMP B.1.6. CR-WF3-2000-01375 noted that this corrosion apparently was from initial construction (from exposure to the weather), was determined to be non-active unless reactivated by moisture, and ultrasonic wall thickness measurements showed that the containment vessel wall thickness exceeded the design

thickness of 2.1875 inches. Chemical analysis of scale samples indicated the presence of chlorides and sulfides. The presence of these chemicals also indicates the potential for an active corrosion mechanism to be initiated if any moisture were introduced.

Therefore, there exists the potential that the existing apparently non-active corrosion, with presence of traces of chlorides and sulfides, of the SCV in the knuckle area below the annulus moisture barrier may be reactivated by moisture and may potentially impact containment vessel intended function before or during the period of extended operation.

The staff also noted that, during refueling outage 18, a construction opening for steam generator replacement was made in the Shield Building by hydrodemolition, which could have resulted in intrusion of water into the annulus moisture barrier areas. The staff requires additional information to determine the need to verify, prior to entering the period of extended operation that the observed corrosion continues to remain non-active and whether the applicants plant-specific operating experience supports the sufficiency of the LRA AMP.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below.

  • The information in the FSAR supplement description in LRA Section A.1.6 and the AMPER does not appear to provide an adequate summary description of the AMP because (1) it does not sufficiently summarize what the LRA AMP covers in terms of components, materials, environments, aging effects, and key condition monitoring actions; rather, a significant part of the supplement primarily repeats the structural configuration description of the SCV that is already in FSAR Section 3.8.2, and (2) the description does not provide information consistent with that for program XI.S1 in SRP-LR Table 3.0-1.

Audit Results. Based on this audit, the staff verified that the scope of program, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S1. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the preventive actions, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is generally bounded by the operating experience for which the GALL Report program was evaluated; however, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.7, Containment Leak Rate Summary of Information in the Application. The LRA states that AMP B.1.7, Containment Leak Rate, is an existing program that is consistent with the program elements in GALL Report

AMP XI.S4, 10 CFR Part 50, Appendix J. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: penetration, LLRT, Appendix J, and air lock.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00008 Aging Management Program Evaluation Results-Civil/Structural. Revision 1, Part: Containment Leak Rate Program 12/03/2015
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
3. EN-DC-334 Primary Containment Leakage Rate Testing (Appendix J) Revision 3, 11/21/2013
4. EN-LI-102 Corrective Action Program Revision 24, 09/05/2014
5. WF3-QA Quality Assurance Program Manual Revision 29, 12/01/2014
6. CEP-APJ-001 (Fleet) Primary Containment Leakage Rate Testing Revision 2, (10 CFR Part 50 Appendix J) Program Plan 09/25/2013
7. SEP-APJ-005 (Plant Specific) Waterford 3: Primary Containment Leakage Rate Revision 5, Testing (Appendix J) Program 05/30/2011
8. SEP-CISI-104 Program Section for ASME Section XI, Division 1 Revision 1, WF3 Containment Inservice Inspection Program (including 10/22/2012 drawings IWE - 11, Reactor Containment Vessel Inspection Layout Inside Surface, and IWE - 12, Reactor Containment Vessel Inspection Layout Outside Surface)
9. WF3-CS-14-00001 WF3 License Renewal Project: Aging Management Review of Revision 1, the Reactor Building 12/03/2015
10. CEP-CII-003 Visual Examination of Class MC Components Revision 305, 09/16/2015
11. CEP-NDE-0112 Certification of Visual Examination Personnel Revision 9, 11/19/2013
12. CEP-NDE-0100 Administration and Controls of NDE Revision 9, 07/29/2015
13. WF31-2015-0047 Request To Permanently Extend the ILRT to 15 years 06/18/2015 (10 CFR 50.90). Entergy Letter to NRC with Attachments 1, 2, and 3.
14. CR-WF3-2000- Rework Moisture Barriers for Containment and Annulus (one of 11/06/2000 1275 (MAI 421737) affected interior locations is immediately below penetration #21)
15. DWG-LOU-1564- Piping Penetrations - Reactor Containment Building Revision 3, G-175, Sheet 2/3 12/12/1995
16. ECR 0000018568 Penetration 102 - Appendix J Leakage Limits 05/04/2011

Document Title Revision/Date

17. CR 2011-02988 Penetration 102 - Exceeded LLRT Operational Limit 05/04/2011
18. DWG-LOU-1564 Electrical Penetrations - Penetration Locations, Louisiana Power Revision 0 B-316, Sheet 2A and Light Co., Waterford S.E.S. Unit No. 3
20. WO-52465 WF3 2005 ILRT Summary 05/21/2005
21. CR-WF3-2012- Hydrogen Analyzer Systems A&B - Missing LLRT 12/27/2012 07775
22. CR-WF3-2014- Penetration 132 - Identified cause of electrical LLRT failure, 04/27/2014 02275 locknuts inside containment needed tightening
23. CR-WF3-2014- Main Steam Line #1 - LLRT failure 04/17/2014 01821 During the audit of program elements 1 through 6, the staff verified that the preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP B.1.7, Containment Leak Rate are consistent with the corresponding program elements of the GALL Report AMP XI.S4, 10 CFR Part 50, Appendix J. For the scope of program program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether the scope of program program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
  • During the onsite review of Waterford 3 implementing procedure for the 10 CFR Part 50 Appendix J leakage rate testing, SEP-APJ-005, Primary Containment Leakage Rate Testing (Appendix J) Program, contained in the AMP Basis Document, the staff noted a certain number of containment pressure-retaining components (e.g., valves, penetrations) are not subjected to LLRT as required by the 10 CFR Part 50 Appendix J rule and the scope of program program element of GALL Report AMP XI.S4. The scope of program program element of AMP XI.S4 states, [t]he scope of the containment LRT program includes all containment boundary pressure-retaining components. It is not clear how the applicants Containment Leak Rate program is consistent with that of the GALL Report AMP XI.S4, for which consistency is claimed.

To resolve and clarify this inconsistency with the GALL Report AMP XI.S4 and the requirements of 10 CFR 54.21(a), the staff is considering issuing the noted RAI.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements of the GALL Report AMP XI.S4. The staff also identified certain aspects of the scope of program program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.8, Diesel Fuel Monitoring Summary of Information in the Application. The LRA states that AMP B.1.8, Diesel Fuel Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M30, Fuel Oil Chemistry. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fuel oil storage 7-day tanks, fuel oil feed tanks, fire water diesel tank, and the fuel oil auxiliary tank.

The staff also conducted an independent search of the applicants operating experience database using keywords: fuel oil, sample, tank(s), and diesel.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. G164-Sheet 3 Auxiliary Flow Diagram (Drawing) 07/10/1978
2. C-9300193 Water Treatment Building and Fire Pump House (Drawing) 05/03/1991
3. G164 Sheet 1 Emergency Generator Diesel Oil System (Drawing) 12/10/1991
4. 15642527 R2 Diesel Oil Tank Bottom and Anchor Ring Layout (Drawing) 09/30/1996
5. 15642528 R1 Diesel Oil Tank Roof Details (Drawing) January 1979
6. 15642525 R4 Diesel Oil Storage Tank General Plan (Drawing) 06/01/2016
7. Unlabeled Trending Data on EDG Fuel Oil Storage Tank (FOST) 07/12/2016
8. CE-002-030 Safety-Related Procedures (Maintaining Diesel Fuel Oil) Revision 026
9. CE-001-004 Periodic Analysis Scheduling Program Revision 315
10. Work Order 23148 Drain and Clean Fuel Oil Storage Tank B 02/28/2005
11. Work Order Clean Diesel Fuel Oil Storage Tank B 06/02/2016 00401851
12. Work Order Clean Diesel Fuel Oil Storage Tank A 03/08/2005 500010005
13. Work Order Clean Diesel Fuel Oil Storage Tank B 06/08/2016 00400699
14. Work Order Clean Diesel Fuel Oil Day Tank A 09/27/2010 00246844
15. Work Order Clean Diesel Fuel Oil Day Tank B 02/25/2013 00293713

Document Title Revision/Date

16. Work Order Auxiliary Boiler Fuel Oil Inspection 02/27/2014 00362389
17. CR-WF3-2015- Sample Results Show High Lubricity 08/04/2015 05090
18. CR-WF3-2013- EDFOST Elevated Particulate Results 12/10/2013 05945
19. CR-WF3-2011- FOST A/B Particulate Trending Upwards 11/15/2011 07629
20. CR-WF3-2011- EDFOST B Particulate 9.96mg/liter 07/24/2011 05236
21. CR-WF3-2009- API Gravity Sample from Fuel Truck 10/14/2009 05410
22. CR-WF3-2006- Gravity Results Received High 05/09/2006 01410
23. CR-WF3-2006- Gravity Results Are Above .865 05/11/2006 01446
24. CR-WF3-2006- Corrosion Identified to EDG Oil Storage Tank Valve 04/26/2006 01248
25. CR-WF3-2006- Gravity for Diesel Fuel Oil Was Greater than .865 04/25/2006 01241
26. CR-WF3-2007- Gravity from Fuel Truck Sample 06/27/2007 02366
27. CR-WF3-2010- Fuel Oil Particulate Results High at (Leake) Oil 08/18/2010 05048
28. WF3-EP Aging Management Program Evaluation Results Revision 0 00007 Non-Class 1 Mechanical
29. WF3-EP Operating Experience Review Results - Aging Management Revision 0 00003 Program Effectiveness The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit, the staff made the following observation:

  • Section 4.4 of WF3-EP-14-00007 Non-Class 1 AMP Evaluation Report did not list one of two diesel fire pump tanks that was identified during the walkdown of the diesel tanks.

This gap was brought to the applicants attention and it was verified that tank DFOMTNK0001-B was in scope for license renewal. The applicant created condition report CR-WF3-2016-04497 to add this tank to the program basis document, which will ensure that the tank is subject to the recommendations of GALL Report AMP XI.M30, Fuel Oil Chemistry.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M30.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.9, Environmental Qualification (EQ) of Electric Components Summary of Information in the Application. The LRA states that AMP B.1.9, Environmental Qualification (EQ) of Electric Components Program, is an existing program that is consistent with the program elements in GALL Report AMP X.E1, Environmental Qualification (EQ) of Electric Components. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the electrical penetration area and the auxiliary building. The staff also conducted an independent search of the applicants operating experience database using the keywords: cable, jacket ,

arcing, thermal, connection, contamination, discoloration, swelling, insulation, and moisture.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 2/1/2016
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
3. EN-DC-164 Environmental Qualification (EQ) Program Revision 4, 11/21/2013
4. WF3-EP-14-00004 TLAA and Exemption Evaluation Results Revision 0, 2/5/2016
5. 7320-10003 Instrumentation and Control Electrical Penetration for 9/1/1988 Waterford Unit 3
6. Excel Spreadsheet - No Cornerstone Rollup - Equipment Qualification 1Q10 04/14/2010 document identifier

Document Title Revision/Date

7. Q1-2011 Equipment Qualification Program Health Report 03/31/2011 (1/1/2011-3/31/2011)
8. Q1-2012 Equipment Qualification Program Health Report 03/31/2012 (1/1/2012-3/31/2012)
9. Q1-2013 Equipment Qualification Program Health Report 03/31/2013 (1/1/2013-3/31/2013)
10. Excel Spreadsheet - No Cornerstone Rollup - Equipment Qualification 2Q10 07/14/2010 document identifier
11. Q2-2011 Equipment Qualification Program Health Report 06/01/2011 (4/1/2011-6/30/2011)
12. Q2-2012 Equipment Qualification Program Health Report 06/30/2012 (4/1/2012-6/30/2012)
13. Q2-2013 Equipment Qualification Program Health Report 06/30/2013 (4/1/2013-6/30/2013)
14. Q3-2010 Equipment Qualification Program Health Report 09/30/2010 (7/1/2010-9/30/2010)
15. Excel Spreadsheet - No Cornerstone Rollup - Equipment Qualification 3Q10 10/13/2010 document identifier
16. Q3-2011 Equipment Qualification Program Health Report 09/20/2011 (7/1/2011-9/30/2011)
17. Q3-2012 Equipment Qualification Program Health Report 09/30/2012 (7/1/2012-9/30/2012)
18. Q4-2010 Equipment Qualification Program Health Report 12/31/2010 (10/1/2010-12/31/2010)
19. Q4-2011 Equipment Qualification Program Health Report 12/31/2011 (10/1/2011-12/31/2011)
20. Q4-2012 Equipment Qualification Program Health Report 12/31/2012 (10/1/2012-12/31/2012)
21. EN-LI-104 EQ Focused Self-Assessment LO-WLO-2011-0015 Revision 8 Attachment 9.10 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program element of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X.E1.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the

staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.10, External Surfaces Monitoring Summary of Information in the Application. The LRA states that AMP B1.10, External Surfaces Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M36, External Surfaces Monitoring of Mechanical Components, as modified by LR-ISG-2011-03, Changes to the Generic Aging Lessons Learned (GALL) Report Revision 2, Aging Management Program XI.M41, Buried and Underground Piping and Tanks, and LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.

To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Dry Cooling Tower, aluminum flame arrestors, vent lines to fuel oil storage day tanks A and B, the Essential Chilled Water System room, as well as portions of the MSIV B and MSIV A rooms.

The staff also conducted an independent search of the applicants operating experience database using keywords: corrosion, leak, leakage, under insulation, external, surface, tank, and pinhole.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. EN-DC-178 System Walkdowns Revision 7, 11/21/2013
2. UNT-006-032 Coating and Corrosion Program Revision 000, 03/31/2016
3. WF3-EP-14-00003 WF3 License Renewal Project: Operating Experience Review Revision 0 Results - Aging Management Program Effectiveness
4. WF3-EP-14-00007 WF3 License Renewal Project: Aging Management Program Revision 0 Evaluation Results: Non-Class 1 Mechanical
5. EN-TQ-104 Engineering Support Personnel Training Program Revision 20 03/25/2016
6. WF3-ME-14-00029 WF3 License Renewal Project: License Renewal Topical Report Revision 0 on Mechanical Components Susceptible to Corrosion Under 12/03/2015 Insulation
7. PE-004-021 CCW Heat Exchanger Performance Test Revision 003 02/27/2014
8. PE-004-033 Wet Cooling Tower A(B) Thermal Performance Test Revision 305 02/27/2014
9. PE-004-024 ACCW & CCW System Flow Balance Revision 304 02/27/2014

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects and the acceptance criteria program elements, sufficient information was not available to determine whether they are consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The LRA AMP includes an enhancement to the detection of aging effects program element. The enhancement states that the accessible portion of in-scope piping components with tightly adhering insulation will be inspected. The GALL Report AMP recommends that the entire population of in-scope piping components with tightly adhering insulation be inspected. It is not clear to the staff that these statements are consistent because the applicants use of the word accessible suggests that some in-scope piping components with tightly adhering insulation will not be inspected.
  • The LRA AMP includes an enhancement to the acceptance criteria program element.

The enhancement states that flexible polymeric materials should have no unanticipated dimensional change. The GALL Report AMP states that flexible polymeric materials should have no dimensional change. It is not clear to the staff that these statements are consistent because the applicants use of the word unanticipated suggests that some in-scope flexible polymeric components may experience anticipated dimensional changes.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • Operating experience has revealed external corrosion to be a significant issue at Waterford 3. Licensee Event Report 2014-004-03 states that through-wall corrosion was identified on the EDG Feed Tank vent lines where the vent lines pass through the roof.

An NRC inspector identified the corrosion, and it was not known how long the through-wall corrosion had existed. Waterford 3 has implemented a fleet procedure to resolve the adverse condition. Given the EDG vent line corrosion event, the staff is concerned that for components exposed to outdoor air, either: (a) not everything was examined during walkdowns; or (b) the interval between inspections is too long. Based on discussions during the AMP audit and review of corrective actions associated with the corrosion event, it appeared that the former and not the latter was the case. This is reinforced by the staffs observation of the condition of components exposed to outdoor air during the AMP audit. It is unclear how the fleet procedure, recent operating experience, and activities to resolve the issue are incorporated into the LRA AMP(s).

  • The applicant is using visual inspection per the External Surfaces Monitoring AMP to inspect Dry Cooling Tower Aluminum Heat Exchanger Fins for cracking and loss of

material in order to assure that the intended function of heat transfer is maintained. It is unclear to the staff how the visual inspections will satisfactorily detect loss of intended function.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M36. The staff also identified certain aspects of the detection of aging effects and acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.11, Fatigue Monitoring Summary of Information in the Application. The LRA states that AMP B.1.11, Fatigue Monitoring Program, is an existing program with enhancements that is consistent with the program elements in GALL Report AMP X.M1, Fatigue Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: fatigue and cracking.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Fatigue Monitoring Program - Program Book Revision 0
2. PE-002-003 Safety Related Procedure - Fatigue Monitoring Program Revision 3, 12/14/05
3. CR-WF3-2015- Condition Report - Fatigue Monitoring Program 1/6/2015 00044
4. WF3-ME-15-00002 Plant Transient Analysis for Waterford - Plant Startup Through Revision 0, 4/15/14-1400394.32 - (License Renewal) 6/2/2015
5. 1400394.301 Waterford 3 Plant Fatigue Transient Review Revision 0, 4/9/2015

Document Title Revision/Date

6. WF3-EP-14-00005 Engineer Report: TLAA - Mechanical Fatigue Revision 0, 2/2/2016
7. NRC-RIS-2011 NRC-RIS-2011 Metal Fatigue Analysis Performed by 4/11/12 A2-WF3-0001 Computer Software The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program and parameters monitored or inspected program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The parameters monitored or inspected program element of the LRA AMP states that the number of occurrences of plant design transients that cause significant fatigue usage will be monitored, which is consistent with the recommendations in the GALL Report.

However, the staff noted that the cycle limit of the Loss of Charging transient is less than the cycle limit listed in FSAR Table 3.9-3. The staff is concerned that the applicant may not be monitoring the most limiting cycle limit of the transient.

  • The parameters monitored or inspected program element of the LRA AMP states that the number of occurrences of plant design transients that cause significant fatigue usage will be monitored, which is consistent with the recommendations in the GALL Report.

However, the LRA does not include which transients are used as inputs to the fatigue analyses associated with the Leak-Before-Break analyses and Postulation of High-Energy Line Break analyses.

In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, staff will consider issuing an RAI for the subject discussed below.

  • The LRA AMP states an enhancement to the scope of program program element. The enhancement states that it will develop a set of fatigue usage calculations that consider the effects of the reactor water environment for additional plant-specific locations.

However, the LRA does not include any information on the methodology the applicant will use to identify and evaluate plant-specific locations that may be more limiting for environmentally assisted fatigue than those listed in NUREG/CR-6260.

During the audit, the staff made the following observation:

  • The staff reviewed operating experience action: NRC-RIS [Regulatory Issue Summary] -2011-14 and noted that the applicant reviewed RIS 2011-14 and determined that the staffs concerns in the RIS are not applicable at Waterford. The staff noted that the applicant determined that its procedures do not allow the use of the user-defined options or manual editing features.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.

  • The staff issued RIS 2008-30 to address a specific methodology to demonstrate cyclic load capabilities. However, the LRA did not provide enough information to justify how it has addressed the staffs concerns in RIS 2008-30.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X.M1.

The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the scope of program and parameters monitored or inspected program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.12, Fire Protection Summary of Information in the Application. The LRA states that AMP B.1.12, Fire Protection, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M26, Fire Protection. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the Cable Spreading Room in the reactor auxiliary building, and the Wing Area of the Reactor Building. The staff also conducted an independent search of the applicants operating experience database using keywords: 3M fire wrapping, fire wraps, fire doors, fire barriers, floors, ceilings, fire barrier, intumescent coating, penetration seals, openings, holes, cracks, cable trays, cerablanket, Hemyc, Thermo-lag, and pyrocrete.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 01/20/2016 Mechanical Fire Protection

Document Title Revision/Date

2. ME-003-006 Fire Barrier Penetration Seals Revision 306 3/30/2015
3. ME-003-007 Fire Wrap Barriers Revision 015 9/17/2012
4. ME-003-009 Fire Rated Walls, Floors, and Ceilings Revision 305 4/18/2016
5. PS-015-111 Fire Door Surveillance Revision 01 2/16/2012
6. UNT-005-013 Fire Protection Program Revision 13 4/1/2015
7. CR-WF3-2015- A void (approximately 6 inches x 6 inches x 6 inches) was 03/12/2015 01464 discovered in a 3-hour fire barrier while performing a core bore cutting on the -30 elevation outside of charging pump room A.
8. CR-WF3-2015- Holes found in the EDG Feed Tank Vent Lines 7EG1-29 and 01/21/2015 00405 7EG1-30 should have been evaluated as part of the Fire Protection Program.
9. CR-WF3-2015- Fire door (door 246) to Emergency Feedwater Pump-A Room 01/08/2015 00102 on -35 RAB was found not self-latching.
10. CR-WF3-2014- Fire door (door 35) handle at +21 Q-deck to RCA was broken. 03/02/2014 00936
11. CR-WF3-2014- The bottom bolt of Fire Door (#D179) to the RAB +35 Electrical 01/18/2014 00260 Penetration Area A latching mechanism cover was missing. The top bolt was loose.
12. CR-WF3-2013- Calculation EC-F111-001 (Fire Barrier Design Basis Review) was 01/15/2013 00261 not completed for a barrier segment (segment 150A) in the Turbine Generator Building.
13. CR-WF3-2011- Documentation of approved UL-listed fire dampers installed at 66 03/28/2011 01696 penetrations demonstrating that their fire ratings were commensurate with the fire barrier ratings could not be located.
14. CR-WF3-2010- Contrary to Section 14-2.6 of NFPA 80 Fire Doors and Windows 07/22/2010 04471 (1997), which states that combustible material shall be kept well away from openings, a 200-gallon used lube oil tank was found within 3 feet of fire door D61. D61 is an entry point into electrical switchgear room containing electrical offsite power switchgear equipment.
15. CR-WF3-2009- Seal lists in ME-003-006 Revision 303 are not updated for 03/05/2009 01062 inaccessible seals identified in the 2005, 2007, and 2008 inspections.
16. CR-WF3-2008- Fire wrap (3M Interam E-54A) for conduit 30604D-SA in Fire Area 04/24/2008 01465 RAB 17 Component Cooling Water Heat Exchanger B Room was not installed per design (ER-W3-1999-0172-000) as documented in the Engineering Request Change Notice.
17. CR-WF3-2008- The fire rating of Cable Vault/Relay Room RAB7 was in question 02/20/2008 00654 because of the presence of a 4-inch conduit (Conduit 35210-NB) partially installed in the room.
18. CR-WF3-2007- Fire wrap was not installed in accordance with Fire Wrap 01/31/2007 00381 Installation and Rework Procedure - PMC-003-001.
19. CR-WF3-2004- Cracks were found in Pyrocrete Barrier above Door 217 in 04/22/2004 01220 Room #225, Fire Zone 22.

Document Title Revision/Date

20. Technical Waterford 3 Technical Requirements Manual (TRM) Amendment 91 Requirements Manual The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit, the staff made the following observations:

  • For the parameters monitored or inspected, the staff noted that the GALL Report recommends that the fire protection program manage the effects of aging (e.g., loss of material, cracking) for fire barrier materials (e.g., fire wrapping.) The staff noted that the applicants Fire Wrap Barriers (ME-003-007, Revision 015, dated September 17, 2012, step 9) procedure directs plant personnel to inspect fire wrap barriers of different configurations (e.g., single tray, double tray) and materials (e.g., Hemyc, 3M fire wrap) for degradation at least once every 18 months.
  • For the parameters monitored or inspected, the staff noted that the GALL Report recommends that visual inspection of not less than 10 percent of each type of penetration seal be performed for any sign of degradation. If any sign of degradation is detected within the first sample, the scope of the inspection is then expanded to include additional seals (under detection of aging effects). The staff noted that the applicants Fire Barrier Penetration Seals (ME-003-006, Revision 306, dated March 30, 2015) procedure directs plant personnel to inspect at least 10 percent of each type of penetration seal every 18 months (every refueling outage, page 3, step 1.2) for change in appearance and abnormal degradation. Consistent with the Waterford 3 TRM (4.4.11.c, amendment 91), step 1.2.1 of the same procedure instructs plant personnel to inspect an additional 10 percent of each type of sealed penetration if abnormal degradation of penetration seals in the first sample of 10 percent is detected. The locations of penetration seals to be inspected are specified in the attachments to the procedure.
  • Under the same program elements of parameters monitored or inspected and detection of aging effects, the GALL Report recommends that fire-rated doors are (1) inspected for any degradation of door surfaces, and (2) functionally tested to ensure intended function. The staff noted that the applicants Fire Door Surveillance (PS-015-111, Revision 301, dated 3-16-2012) procedure directs plant personnel to perform various inspections and testing of fire doors (steps 5.2, 5.3 and 5.4).

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M26. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B1.13, Fire Water System Summary of Information in the Application. The LRA states that AMP B.1.13, Fire Water System, is an existing program with enhancements and exceptions that will be consistent with the program elements in GALL Report AMP XI.M27, Fire Water System, as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the exceptions and enhancements associated with this AMP. The exceptions to the GALL Report AMP and the enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fire water storage tanks (FWSTs), reactor auxiliary building (RAB), 21-foot elevation preaction control station, and the electric and diesel-driven fire pumps. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, biological, blister, block, clog, coat, delamin, flak, foul, holiday, lined, lining, MIC, microbiologic, min wall, peel, and perforat, pit, recur, sprinkler, and through wall.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical Fire Water System
2. MM-003-021 Sprinkler System Inspection (Safety Area) Revision 10
3. MM-004-422 Sprinkler System Inspection (Nonsafety Areas) Revision 8
4. MM-004-424 Building Fire Hose Station Inspection and Hose Replacement Revision 304
5. OP-903-055 Fire Main Flush and Hydrant Inspection Revision 11
6. OP-903-057 Fire Protection System Flow Test Revision 018
7. N/A Technical Requirements Manual Amendment 72, Amendment 91
8. WF3-ME-14-00028 License Renewal Topical Report on Recurring Internal Corrosion Revision 0

Document Title Revision/Date

9. Work Order (WO) Fire Water Storage Tank B - [area of corrosion on southwest 06/15/2016 436421-02 corner of the tank]
10. WO 436421-01 Fire Water Storage Tank A - [area of corrosion on northwest 03/24/2016 corner of the tank
11. WO-WF3- Perform Flow Test of Fire Protection System per OP-903-057 - 03/30/2013 52283342 Results
12. WO-WF3- Perform Flow Test of Fire Protection System per OP-903-057 - 07/20/2009 51545900 Results
13. WO-WF3- Inspect Safety Related Sprinkler Systems MM-03-021 - Results 05/28/2014 52462938 10/22/2015
14. WO-WF3- Non-Safety Fire Protection Sprinkler Inspection - Results 01/16/2015 52509629 01/14/2016
15. OP-903-059 Sprinkler System Functional Test Revision 12
16. OP-903-058 Fire Hose Station Valve Cycling Check Revision 14
17. WO-51668265 Hose Station Flow Test 02/22/2016
18. WO 52297378 Perform Functional Test of RAB/RCA FP sprinkler systems per 02/15/2011 OP-903-059 - results
19. OP-904-014 Turbine Building/Outside Sprinkler System Manual Test Revision 302
20. WO 52375029 Verify Flow Through Deluge Nozzles - Results
21. PMQR 1527-01 Work Instruction for Verifying Flow Through Deluge Nozzles 04/13/13

[Start-up Transformer A] - Results

22. PMRQ 6727-02 Work Instruction for Verifying Flow Through Deluge Nozzles 10/22/2013

[Start-up Transformer B] - Results

23. PMQR 1528-01 Work Instruction for Verifying Flow Through Deluge Nozzles 05/21/2014

[Main Transformer A] - Results

24. PMQR 6672-01 Work Instruction for Verifying Flow Through Deluge Nozzles 05/02/2014

[Main Transformer B] - Results

25. WO 00257162 HVRMFLT0008 - Spray Nozzle Air Flow Test RAB Exhaust Filter 03/29/2012 Train Inlet for E-22 Fan Units - Results
26. WO 52463131 SBVMFLT0001 A - Air Flow Test Through Spray Nozzles [SBV 07/01/2014 Filter Train A Primary HEPA Filter] - Results
27. WO 52489432 FP MTNK0001 B [fire water storage tank B] - Inspect Tank 07/10/2014 Internals IAW NFPA-25 [Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems,] -

Results

28. WO 00232209 FP MTNK0001 A [fire water storage tank A] - Inspect Tank 11/05/2010 Internals IAW NFPA Results
29. WO 00232586 FP MTNK0001 B [fire water storage tank B] - Inspect Tank 11/18/2010 Internals IAW NFPA Results
30. WO 52487901 FP MTNK0001 A [fire water storage tank A] - Inspect Tank 08/25/2015 Internals IAW NFPA Results
31. CR-WF3-2015- FWST A Internal Corrosion 08/25/2015 05569
32. CR-WF3-2007- The fifth North/South sprinkler header from the West side of the 02/22/2007 00648 7B Warehouse has at least two water leaks.

Document Title Revision/Date

33. CR-WF3-2008- Emerge minor maintenance work order 147762 onto schedule to 04/15/2008 01464 replace a section of Fire Protection sprinkler pipe in 7B Warehouse that has a pinhole leak.
34. CR-WF3-2009- Unit Auxiliary Transformer A Failed Main Drain Test 11/04/2009 06241
35. CR-WF3-2009- Diesel Fire Pump B - Debris Inside of Heater Causing Flow 11/09/2009 06452 Blockage
36. CR-WF3-2011- Minor Through-wall Leak from FWST A Drain Pipe - From 08/31/2011 06149 External Corrosion
37. CR-WF3-2014- Leak (30 drops per minute(dpm)) in Sprinkler Header Piping in 02/21/2014 00830 Turbine Building
38. CR-WF3-2012- Leak in Sprinkler Piping in Warehouse 08/17/2012 04049
39. CR-WF3-2012- Leak (1 gallon per minute) in 4-inch Fire Sprinkler Header in 08/13/2012 03939 Reactor Auxiliary Building
40. CR-WF3-2012- Leak (20 dpm) in the Fire Protection Line in the Turbine Building 03/26/2012 01487
41. CR-WF3-2010- Roll-up Condition Report To Address Clogged Nozzles During 01/23/2010 00484 Testing of Startup Transformer B Deluge System
42. CR-WF3-2010- Two Clogged Nozzles During Testing of Startup Transformer B 01/22/2010 00478 Deluge System
43. CR-WF3-2008- Underground Flow Tests Degraded Slightly from Previous Tests 08/27/2008 04117
44. CR-WF3-2007- Leaks (10 dpm) in Warehouse Fire Water Header 02/22/2007 00648
45. CR-WF3-2015- Leak (12 dpm) in Startup Transformer A Header Piping 11/19/2015 08573
46. CR-WF3-2013- Clogged Nozzle in Startup Transformer A Deluge System 04/13/2013 01846
47. N/A System Description, Fire Protection System, Table 5, Areas Revision 8 Protected by Automatic Suppression Systems
48. 58174323 Sprinkler System [piping installation details] Fire Protection - Revision 15 M3A, M4, M11A, M12B, M13 The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the existing program as modified by the proposed exceptions and enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending, program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects, acceptance criteria, and corrective actions program elements associated with enhancements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below.

  • The LRA AMP states enhancements to the detection of aging effects program element, Enhancement Nos. 2, 7, 14, 16, 19, and 20. The staffs concerns are as follows:

o Enhancement No. 2 states that a wet pipe sprinkler system will be inspected every 5 years by opening a flushing connection at the end of one main and by removing a sprinkler toward the end of one branch line. The staffs concern is that the enhancement does not state that the wet pipe systems in each building will be inspected every 5 years. NFPA 25 Sections 14.2.2 and A.14.2.2 require that each buildings wet pipe system be inspected. During the audit, the staff verified that there is only one wet pipe sprinkler system in each building protected by a wet pipe system.

o Enhancement No. 7 states that strainers will be removed every 5 years to clean and inspect for damage and corroded parts. The staffs concern is that AMP XI.M27, as modified by LR-ISG-2012-02, recommends that strainers be inspected on a refueling outage interval and after each system actuation.

o Enhancement No. 16 states that vacuum box testing will be performed on the bottom of the FWST to identify leaks and that in the event the bottom of the fire water tank is uneven, the station will perform a suitable NDE technique rather than vacuum box testing to identify leaks. The staffs concern is that it cannot evaluate the suitability of an unspecified technique to detect leaks in tank bottoms.

o Enhancement No. 19 states that augmented flow tests or flushing and wall thickness measurements will be conducted for fire water piping experiencing recurring internal corrosion. The staffs concerns are that the enhancement did not address whether wall thickness measurements will be conducted in addition to flow tests and flushes or in addition to only flushes; and it did not state: (a) the minimum number of inspections that will occur in each 5-year interval; (b) the criteria to be used to determine that additional inspections are warranted (e.g., extent of degradation at individual corrosion sites, rate of degradation change, trend of through-wall leaks); (c) how inspections of components that are not easily accessed will be conducted; (d) how leaks in buried or underground piping will be detected; and (e) how many additional inspections will be conducted within an inspection interval when through-wall leakage is detected or inspection results reveal that pipe wall thickness is below minimum wall. In addition, Enhancement No. 19, which states that activities will be completed every 5 years, is not consistent with LRA Section 3.3.2.2.8 which states, will conduct augmented flow tests or flushing, and wall thickness measurements for fire water piping experiencing recurring internal corrosion prior to the period of extended operation and at least once every refueling cycle during the period of extended operation.

o Enhancement No. 20 states the alternative actions that will be taken prior to returning a FWST to service without repair or replacement of degraded coatings.

The staff concerns are that: (a) the alternative could be used even though the size and frequency of blisters could be increasing; and (b) the enhancement allows a coating inspector rather than a coating specialist to evaluate the conditions for use of the alternative.

  • The LRA AMP states an enhancement, Enhancement No. 22, to the acceptance criteria program element. The enhancement states that adhesion results can be

quantified by conducting visual inspections, wet sponge testing, or dry film testing. The staffs concern is that these methods are not capable of quantifying adhesion results.

  • The LRA AMP states an enhancement, Enhancement No. 25, to the corrective actions program element. The enhancement states that obstruction evaluations will be conducted if there is evidence of excessive discharge of material during routine flow tests. AMP XI.M27, as modified by LR-ISG-2012-02 recommends the use of the criteria in NFPA 25 Section 14.3, Obstruction Investigation and Prevention, which uses the term obstructive rather than excessive. The staffs concern is that the term excessive is not defined.

In order to verify that the exceptions, Exception Nos. 5 and 6, will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below. The LRA AMP states exceptions to the detection of aging effects program element. The staffs concerns are as follows:

  • Exception No. 5 states that cross-hatch testing, as described in ASTM D 3359, Standard Test Methods for Measuring Adhesion by Tape Test (recommended by AMP XI.M27, as modified by LR-ISG-0212-02 by citing NFPA 25 Section 9.2.7.1), is not conducted when signs of pitting, corrosion, or failure of the coating is detected. The basis for the exception in part includes crediting spot wet sponge tests and dry film testing as a means to detect coating adhesion deficiencies. The staff has concluded that these methods do not effectively detect coating adhesion deficiencies, but rather holidays and coating thickness, respectively.
  • Exception No. 6 and Enhancement No. 3 address trip testing preaction valves with the control valves cracked open in lieu of testing with control valves in the full open position and internal inspections of dry sprinkler piping downstream of preaction systems, respectively. The staffs concern with Exception No. 6 is that a cracked open control valve might not provide adequate flow to detect potential flow blockage. The staffs concern with Enhancement No. 3 is that it does not state: (a) the frequency of inspections; (b) how access to the piping will be obtained (e.g., removal of a sprinkler and opening a flushing connection); and (c) the location of the removed sprinkler (i.e., most remote). The exception and enhancement address inspections or tests that are used to detect potential flow blockage of dry sprinkler piping downstream of preaction systems.

During the audit, the staff made the following observations:

  • The staff reviewed TRM Table 3.7-2, Spray and/or Sprinkler Systems, and confirmed that there are 21 credited spray or sprinkler systems.
  • The staff reviewed TRM Table 3.7-4, Fire Hose Stations, and confirmed that there are 76 credited fire hose stations.
  • The staff reviewed the License Renewal Topical Report on Recurring Internal Corrosion.

Attachment 1, Recurring Internal Corrosion Subject to Aging Management Review, identified five CRs associated with leaks in the fire protection system. The CRs included: CR-WF3-2004-02297 (July 28, 2004); CR-WF3-2008-02468 (May 20, 2008);

CR-WF3-2008-04793 (October 15, 2008); CR-WF3-2008-01390 (April 9, 2008); and CR-WF3-2012-00758 (February 12, 2012).

  • The staff reviewed procedure OP-903-058 and confirmed that the acceptance criteria for the fire hose station flow confirmation (conducted every 3 years) is, no flow blockage exists when each fire hose station valve is partially opened. Specifically, the test states,

[n]o flow blockage is indicated by visible water flowing out of the hose station. There are 76 hose stations in this portion of the test. The hose stations are located in the reactor auxiliary building, fuel handling building, Dry Cooling Tower, turbine building, reactor building, and support buildings. In addition, the test includes remote hose stations, defined as, the farthest fire hoses from the Fire Pumps. The acceptance criteria for the remote hose stations (conducted every 5 years) is, [f]or each hose station being tested in Attachment 10.3 [remote hose stations], if Hose Station residual pressure is <65 PSI or flow rate is <100 GPM, then data must be submitted to the Fire Protection Engineer for evaluation of acceptance. There are two remote hose stations, one in the fuel handling building and one in the turbine building.

  • The staff reviewed procedure OP-903-059 and work orders WO 52297378 and confirmed that there are 37 main drain tests conducted, including 9 in the turbine building, 1 in the fuel handling building, 2 in the reactor building, 16 in the reactor auxiliary building, 7 in the yard areas, and 2 in the diesel engine fuel oil storage tank area. The staff noted that although the title of WO 52297378 refers to the RAB/RCA FP sprinkler systems, the work order documents testing of all the above cited main drain locations.
  • The staff reviewed procedures OP-903-059 and OP-904-014 and confirmed that the applicant tests the piping downstream of the deluge valves by confirming that the water pressure is approximately 125 psig prior to opening the deluge valve, pressure drops to approximately 0 psig when opened, and returns to approximately 125 psig when the deluge valve is closed. The staff also noted that PMQR 1527-01, within work order WO 52375029, directs personnel to [o]bserve flow at each Fire Protection Spray nozzleand document and spray pattern abnormalities. The staff reviewed other deluge valve testing work orders and confirmed that each included a similar PMQR (i.e., 6727-02, 1528-01, 6672-02) specific to the transformers deluge system being tested.
  • The staff reviewed work orders WO 00257162 and WO 52463131 and confirmed that the procedure uses air to test deluge piping for filter units. The procedure requires the individual to check sprinkler nozzles for obstructions.
  • The staff reviewed procedure OP-903-055 and confirmed that the acceptance criteria for the test is [c]lear water is being discharged from the designated fire hydrant, and flushing has been in progress for at least 2 minutes.
  • The staff reviewed work orders WO 52489432, WO 00232209, WO 00232586, and WO 52487901 and confirmed that, with the exception of the August 25, 2015, inspection of fire water storage tank A, no corrosion or coating degradation was noted on the internals of the FWSTs. During the August 25, 2015, inspection of FWST A, minor corrosion was noted on the inside surface of the northeast manway, and some corrosion was noted on the drain line. The staff noted that CR-WF3-2015-05569 was initiated by the applicant to document the corrosion. The staff reviewed the photographs provided with the condition report and noted that corrosion inside the tank appears to be minor and that the corrosion on the inside surfaces of the drain piping are typical with that observed in carbon steel piping exposed to raw water.
  • The staff reviewed CR-WF3-2010-00484 and noted that there have been six clogged nozzles spanning, two in 2005, one in 2006, one in 2008, and two in 2010.
  • The staff reviewed the fire water system piping and instrument diagrams, system description, and installation drawing with the applicant and confirmed that in each building protected by a wet pipe system, there is only one wet pipe sprinkler system in contrast to dry piping preaction systems where there are multiple systems in each building.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing RAIs for the subjects discussed below.

  • The staff noted that certain aspects of the recommended FSAR supplement content were not included. Specifically, the following are missing from the FSAR supplement:

(a) the program manages the aging effects through the use of flow testing and visual inspections performed in accordance with the 2011 Edition of NFPA 25; and (b) the water-based fire protection system is normally maintained at required operating pressure and is monitored such that loss of system pressure is immediately detected and corrective actions initiated.

Audit Results. Based on this audit, the staff verified that scope of program, preventive actions, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M27 as modified by LR-ISG-2012-02. The staffs evaluation of aspects of the detection of aging effects program element associated with exceptions will be addressed in the SER.

The staff also identified certain aspects of the detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.14, Flow-Accelerated Corrosion Summary of Information in the Application. The LRA states that AMP B.1.14, Flow-Accelerated Corrosion, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M17, Flow-Accelerated Corrosion, as modified by LR-ISG-2012-01, Wall Thinning Due to Erosion Mechanisms. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed enhancements associated with this AMP and will document their evaluation in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of

the applicants operating experience database using keywords: cavit, erosion, FAC, flow accel, and wall thin.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00002 Operating Experience Review Results Aging Effects Requiring Revision 0 Management
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.1.12 Flow-Accelerated Corrosion
3. WF3-EP-14-00007 AMP Evaluation Results - Non-Class 1 Mechanical, Section 4.8 Revision 1 Flow-Accelerated Corrosion
4. EN-DC-315 Flow-Accelerated Corrosion Revision 12
5. W3P89-3081 NRC GL 89-08, Erosion/Corrosion Induced Pipe Wall Thinning 7/21/1989
6. W3P89-1592 Supplemental Information in Response to NRC GL 89-08, 11/17/1989 Erosion and Corrosion Induced Pipe Wall Thinning
7. CR-WF3-1997- Due to Flow-Accelerated Corrosion, unexpected gross thinning. N/A 01205 Replaced with stainless steel
8. CR-WF3-2007- WF3 Flow-Accelerated Corrosion program - several components N/A 03899 that are susceptible to flow-accelerated corrosion, but not included in the CHECWORKS software model do not have available documentation of previous inspections.
9. CR-WF3-2008- WF3 Flow-Accelerated Corrosion Program software models N/A 02852 (CHECWORKS) contain errors in the feedwater heaters by the fact that the nozzles are the original A106B (carbon steel) material.
10. CR-WF3-2009- A review of the Flow-Accelerated Corrosion CHECWORKS 00183 predictive model (as a result of recent increase in Blowdown System flow) indicates that there are two areas where the model has not reflected actual plant conditions.
11. CR-WF3-2009- Cavitation in ACCW spool piece in valve body ACC-126A. N/A 00614
12. CR-WF3-2009- Extent of condition for CR-WF32-2009-00183 identified three N/A 01980 additional discrepancies.
13. CR-WF3-2009- EPRI identified a bug in CHECWORKS software that is used to N/A 07244 predict flow-accelerated corrosion downstream of a piping section that has been replaced, under certain specific conditions.
14. CR-WF3-2011- MSR A shell wear (due to erosion and/or flow-accelerated N/A 02509 corrosion) wall thickness less than minimum allowed of 1.2.3.2 per TD-W120.1825. Similar wear noted in past (CR-WF3-2006-4202).
15. CR-WF3-2011- BD-109A replaced due to body leak (CR-WF3-2010-1873). N/A 03022 BD-109A internal shows severe wastages on body and pipe joint.

Document Title Revision/Date

16. CR-WF3-2012- BD-109A (S/G 1 Blowdown flow control valve) stated similar N/A 01648 conditions expected for BD-109B and recommended inspection during RF17.
17. CR-WF3-2012- Flow-accelerated corrosion scope expansion inspection identified N/A 05734 additional wall thinning.

The staff conducted its audit of LRA program elements 1 through 7 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP, as modified by LR-ISG-2012-01.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.

The staff also audited the description of the LRA AMP provided in the FSAR supplement in LRA Section A.1.14. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M17, as modified by LR-ISG-2012-01. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.15, Inservice Inspection Summary of Information in the Application. The LRA states that AMP B.1.15, Inservice Inspection, is an existing program that is consistent with the program elements in GALL Report AMP XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: cracking, leak, wear, loss of material, failure, degradation, flaw, repair, and weld.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Program Basis Document, Aging Management Program Revision 1, Evaluation Results - Class 1 Mechanical 05/01/2013
2. CR-WF3-2011- Missed Examination of ASME Code Items 05/10/2011 01748 3.CR-WF3-2005- Boric Acid Discovered in the Annulus of Pressurizer Heater 07/01/2005 01449 Sleeves C4 and D2
4. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
5. CR-WF3-2012- Reactor Vessel Flange Leakoff Line 10/13/2012 05113
6. NRC Integrated NRC Integrated Inspection Report - Failure to perform ASME Revision 0 Inspection Code Section XI Required Examination Report 05000382/

2012005

7. CR-WF3-2007- Reactor Vessel Head Flange O-Ring Leak 10/31/2007 03385
8. CR-WF3-2007- Reactor Vessel Head Flange O-Ring Leak 09/04/2007 03129
9. WF3-EP-14-00006 Program Basis Document, Aging Management Program Revision 1, Evaluation Results - Class 1 Mechanical, Inservice Inspection 05/01/2013
10. LER-382-2000-011 RCS Pressure Boundary Leak due to PWSCC and Leaking 11/16/2000 MNSA Clamps
11. LER-382-1999-002 Leaking Reactor Coolant System Pressure Boundary Nozzles 11/16/2000
12. LER-382-2003-003 RCS Pressure Boundary Leak due to PWSCC 12/18/2003 13.CR-WF3-2000- Boric Acid Discovered in the Annulus of Pressurizer Heater 03/06/2000 00199 Sleeves C4 and D2.

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program.

During the audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to verify that the program elements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing RAIs for the subjects discussed below.

  • The LRA AMP states consistency to the scope of program program element. In the operating experience section, it indicates that it had missed a Code-required examination in 2010. The staffs concerns are as follows:

The staff performed a plant-operating experience review and noted that, in addition to missing an item in 2010, the applicant had also missed another Code

required testing in 2012. The staff has concerns that applicant may not be clear on its program scope and may miss Code required examinations during the period of extended operation.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, detection of aging effects, acceptance criteria, and corrective actions program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M1. The staffs evaluation of aspects of the scope of program program element will be addressed in the SER. The staff also identified certain aspects of the scope of program, program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in SRP-LR.

LRA AMP B.1.16 Inservice Inspection - IWF Summary of Information in the Application. The LRA states that AMP B.1.16, Inservice Inspection - IWF, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S3, ASME Section XI, Subsection IWF. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted a walkdown of the Essential Chilled Water system. The staff also conducted an independent search of the applicants operating experience database using keywords: IWF, support, pipe hanger, and corrosion.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-CS-14-00002 Aging Management Review of the Nuclear Plant Island Structure Revision 1
2. WF3-ME-14-00009 Aging Management Review of the Component Cooling and Revision 1 Auxiliary Component Cooling Water Systems
3. WF3-CS-14-00004 Aging Management Review of Bulk Commodities Revision 1

Document Title Revision/Date

4. WF3-EP-14-00008 Aging Management Program Evaluation Report Civil/Structural Revision 1
5. CR-WF3-2014-01840 Condition Report 04/18/2014
6. ISI-VT-14-072 Visual Examination of Pipe Hanger, Support, or Restraint 04/24/2014
7. ISI-VT-15-019 Visual Examination of Pipe Hanger, Support or Restraint, Related 11/19/2015 WF3-2015-07635 CR
8. CR-WF3-2014- Condition Report 04/24/2014 02135
9. CR-WF3-2012- Condition Report 12/21/2012 07616
10. LO-WLO-2015- RF20 WF3 Inservice Inspection Pre-NRC Inspection Snapshot 08/13/2005 00054 CA-00004 Assessment
11. W/O 00109393 Work Order Associated with Condition Report 08/29/2007
12. ISI-VT-08-021 ISI-VT-08-021 RF-15-3-ISI Inservice Inspection Report 05/01/2008 RF-15-3-ISI
13. ISI-VT-12-051 Evaluation of Spring Hanger 10/29/2012 CR-WF3-2012-05774 EC 40842
14. CEP-NDE-0903 VT-3 Examination - Entergy Nuclear Engineering Programs Revision 5
15. EN-DC-141 Design Inputs Revision 15
16. EN-LI-102 Corrective Action Program Revision 24
17. EN-MA-145 Maintenance Standard for Torque Applications Revision 3
18. SEP-ISI-104 Program Section for ASME Section XI, Division 1 Inservice Revision 2 Inspection Program
19. EN-MA-145 Maintenance Standard for Torque Applications Revision 5
20. UNT-006-032 Coating and Corrosion Program Revision 0
21. EN-DC-178 System Walkdowns Revision 7
22. SEP-RR-WF3-001 ASME Section XI Repair/Replacement Program Revision 0
23. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
24. CEP-NDE-0901 VT-1 Visual Examination (ASME XI) Revision 4
25. CEP-NDE-0902 VT-2 Visual Examination (ASME XI) Revision 7
26. CEP-NDE-0903 VT-3 Visual Examination (ASME XI) Revision 5 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding

program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP state that high-strength structural bolting is not considered susceptible to SCC because plant procedures prohibit the use of MoS2 as a thread lubricant for bolting. The GALL Report AMP XI.S3 recommends that for high-strength structural bolts in sizes greater than 1-inch nominal diameter with measured yield strength greater than or equal to 150 ksi (1,034 MPa), in addition to the VT-3 examinations, volumetric examination be performed to detect cracking.

Alternatively, the GALL Report states that such examination can be waived with adequate plant-specific justification. It is not clear whether plant-specific justification in the LRA to waive the volumetric examination is limited just to the absence of the use of MoS2 lubricants. It is not also clear that the LRA statement is consistent with the GALL Report AMP XI.S3, because the GALL Report does not limit MoS2 thread lubricant as the only contributor to the aging mechanism for SCC in the above-mentioned high-strength bolts.

  • The LRA states that the preventive actions program element will be consistent with the GALL Report. The GALL Report AMP XI.S3 recommends that the program specify the use of bolting material that has an actual measured yield strength less than 150 ksi.

However, the preventive actions program element of LRA AMP B.1.16 and its basis documents do not appear to include preventive actions to limit the selection of bolting material to those that have an actual measured yield strength of less than 150 ksi, which is recommended by the GALL Report to preclude SCC of high-strength bolts. Therefore, the staff was unable to verify consistency of the preventive actions program element of LRA AMP B.1.16 with that of the GALL Report AMP XI.S3.

  • The preventive actions program element of GALL Report AMP XI.S3 states, in part:

[s]election of bolting material and the use of lubricants and sealants [are] in accordance with the guidelines of EPRI NP-5769, EPRI TR-104213, and the additional recommendations of NUREG-1339 to prevent or mitigate degradation and failure of safety-related bolting. GALL Report AMP XI.S3 also states that [s]tructural bolting replacement and maintenance activities include appropriate preload and proper tightening (torque or tension) The preventive actions program of the LRA AMP basis document states, in part:

o The program is a condition monitoring program and does not include guidance for the selection of bolting material, installation torque or tension, and use of lubricants and sealants. The program is supplemented by existing plant procedures to ensure that the selection of bolting material installation torque or tension, and the use of lubricants and sealants is appropriate for the intended purpose. These implementing procedures use the guidance contained in NUREG-1339 and in EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of bolting material, lubricant, and installation torque.

It is not clear if the above statements are consistent with the GALL Report AMP XI.S3 because although aspects of the above statement appear to be an enhancement to the existing code-based condition monitoring (only) program, there is an apparent lack of a procedural link between the AMP implementing procedures and the existing plant procedures being credited to supplement the

AMP. The staff also noted that this is a common issue across B.1.16 Inservice Inspection - IWF AMPs and B.1.6 Containment Inservice Inspection - IWE.

  • The preventive actions program element of GALL Report AMP XI.S3 states, in part:

o If the structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication Specification for Structural Joints Using ASTM A325 or A490 Bolts, need to be considered.

The related enhancement to the LRA AMP preventive actions program element, which is intended to achieve consistency with the GALL Report, states: Revise plant procedures to include the preventive actions for storage of ASTM A325, ASTM F1852 and A490 bolting from Section 2 of Research Council for Structural Connections publication, Specification for Structural Joints Using ASTM A325 or A490 Bolts. This enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and the related justification provided in the AMP basis document. Not including provisions consistent with the recommendations for lubricants and stress corrosion cracking potential appears to interpret the standard in a manner that is inconsistent with the intent of the GALL Report AMP. It is not clear whether the applicants enhancement is adequate to make the LRA AMP consistent with the GALL Report AMP XI.S3. The staff also noted that this is a common issue across B.1.6, Containment Inservice Inspection - IWE; B.1.16, Inservice Inspection - IWF; and B.1.38, Structures Monitoring AMPs.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion was identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • GALL Report AMP XI.S3 states that MoS2 should not be used as a lubricant due to its potential contribution to SCC, especially for high-strength bolts. The GALL Report also states that the applicant should evaluate applicable operating experience to support the conclusion that the effects of aging are adequately managed. LRA Section B.1.16 and supporting procedures, consistent with the GALL Report AMP XI.S3, state that [p]lant procedures prohibit the use of lubricants containing MoS2 and specify to follow the recommendations in NUREG-1339, EPRI NP-5769, NP-5067, and TR-104213 to ensure proper specification of lubricants for bolting. During its onsite audit, the staff confirmed that although the referenced bolting procedures were revised to prohibit the use of MoS2, it is not clear whether MoS2 lubricants have ever been used at Waterford 3. If so, additional information is necessary to resolve potential aging effects associated with the use of MoS2 in structural bolting. The staff also noted that this issue is common across B.1.1, Bolting Integrity, and B.1.16, Inservice Inspection - IWF AMPs.
  • ASME Section XI, Subsection IWF states that to the extent practical, the same supports selected for examination during the first inspection interval shall be examined during each successive inspection interval. During the audit, the staff reviewed operating experience and found the following:

o For component supports and/or related hardware examined during IWF sampling inspections, degraded conditions were found that although acceptable-as-is, the components were re-worked/repaired to as-new condition. Since it was determined that the as-found condition did not affect the supports capability to perform its design function or exceed the threshold of ASME Section IWF-3400, Acceptance Criteria, the applicant determined the actions associated with ASME Sections IWF-2420, Successive Inspections, and IWF-2430, Additional Examinations, criteria were not required and thus did not apply those Code provisions.

o Component supports and/or related hardware were identified where degraded conditions were identified and re-worked/repaired as the result of walkdowns or other activities and not directly tied to an ISI-IWF inspection. However, the staff did not find evidence of an evaluation to determine whether the supports repaired were supports that were part of the sample periodically inspected by the ISI-IWF program. Conferencing with the applicant during the onsite audit indicated that such a process to identify whether repaired component supports are in the IWF inspection sample may not exist.

Given that the program will manage aging of the entire ASME Code component support population through inspections of a representative population, any ISI-IWF sampled support that is re-worked to as-new condition would no longer be representative of other supports in the IWF component support population. Subsequent ISI-IWF inspections of the same sample may not represent the age-related degradation of the remaining population. The applicants LRA and associated basis documents do not provide a discussion of how this issue is addressed in the AMP, or if the current processes consider expansion or change of the ASME-based IWF sample if a component support and/or related hardware within the IWF sample were re-worked. In addition, it is not clear whether a re-worked component support that is part of the ISI-IWF sample but not identified through the ASME ISI-IWF inspection, (but rather via a walkdown, other program, or some other means), would continue to be included in the ISI-IWF AMP program sample. As a result, it is not clear how the program will ensure that the component support inspection sample reflects the age-related degradation of the remaining population of IWF supports that are not inspected.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S3. The staff also identified certain aspects of the preventive actions, parameters monitored or inspected, and detection of aging effects, program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Summary of Information in the Application. The LRA states that AMP B.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of selected cranes, including the fuel handling building bridge crane, auxiliary monorail cranes, the turbine building gantry crane, and the steam generator feed water pumps (Kranco) crane. The staff also conducted an independent search of the applicants operating experience database with focus on cranes, using the keywords: corrosion, bolt, and wear.

The table below lists documents and drawings that were reviewed by the staff and were found relevant to the audit. These documents and drawings were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-CS-14-00001 Aging Management Review of the Reactor Building Revision 1, 12/03/2015
2. WF3-CS-14-00002 Aging Management Review of the Nuclear Island Structure Revision 1, 12/03/2015
3. WF3-CS-14-00003 Aging Management Review of the Turbine Building and Other Revision 1, Structure 12/03/2015
4. WF3-EP-14-00008 Aging Management Program Evaluation Revision 1, Results-Civil/Structural. 12/03/2015
5. ME-004-401 Fuel Handling Building Crane PM Revision 007, 10/20/2011
6. MM-004-201 Containment Building Polar Crane PM Revision 303, 12/18/2008
7. MM-004-870 Kranco Overhead Cranes PM Revision 301, 02/20/2008
8. MM-004-877 Containment Building Auxiliary Pedestal Crane PM Revision 302, 09/20/2012
9. CR-WF3-2014-01628 Polar Crane, Rail Clamp Hold Down Bolt Broken 04/14/2014
10. CR-WF3-2009-02108 Rust, Dirt, Foreign Material on Trolley and Bridge, Fuel 05/05/2009 Handling Building

Document Title Revision/Date

11. EN-LI-102 Corrective Action Program Revision 24, 09/05/2014
12. WF3-QA Entergy, Quality Assurance Program Manual Revision 29, 12/01/2014
13. MM-007-002 Crane and Hoist Inspection and Testing Revision 009, 04/18/2013
14. EBASCO Project ID EBASCO Specification 503-70, Fuel Handling Building Bridge 09/27/1983 LOU-1564.721 Crane, Seismic Category I
15. CR-WF3-2007-03574 Missing Bolt, Polar Crane 10/10/2007
16. CR-WF3-2011-00215 Rust Forming on Trolley Rail Supports, Turbine Building Gantry 01/13/2011 Crane
17. EBASCO Project ID EBASCO Specification 503-70, Reactor Circular Bridge Crane, Revision 9, LOU-1564.720 Seismic Class I 03/13/1990
18. DWG-U-76742 (Turbine Building Crane) Gantry Leg Details - Whiting Revision 2, Corporation 03/30/1977
19. DWG-U-70861 (Turbine Building Crane) Genl Arrgt of one 4-Motor Gantry Revision 4, Bridge Front Elevation-Whiting Corporation 04/25/1977
20. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
21. LO-WLO-2004-00033 Snapshot Assessment on Large Crane System Health 06/07/2004
22. EBASCO Project ID EBASCO Specification 503-70, Turbine Building Gantry Crane, Revision 3, LOU-1564.722 Seismic Category II 11/15/1978
23. EBASCO Project ID EBASCO Specification 503-70, Miscellaneous Bridge Cranes, Revision 4, LOU-1564.729A Seismic Category I and II 04/01/1983
24. License Renewal Waterford Steam Electric Station, Unit 3, Facility Operating March 2016 Application License NPF-38 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below:

  • Table 3.0-1, FSAR Supplement for Aging Management of Applicable Systems, of the SRP-LR outlines the FSAR description for an AMP to be consistent with GALL Report

AMP XI.M23 FSAR. The SRP-LR states, [t]he number and magnitude of lifts made by the hoist or crane are also reviewed. The staff noted that the FSAR of LRA AMP B.1.17, LRA Section A.1.17, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems Program, does not address the number of lifts made for the scoped-in hoists or cranes. It is not clear how the applicant intends to meet the FSAR acceptance criteria for the GALL Report AMP XI.M23 as outlined in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements of the GALL Report AMP XI.M23. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.18, Internal Surfaces in Miscellaneous Piping and Ducting Components Summary of Information in the Application. The LRA states that AMP B.1.18, Internal Surfaces in Miscellaneous Piping and Ducting Components, is a new program that will be consistent with the program elements in GALL Report AMP XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP.

At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: biofoul, crack, wall loss, through wall, piping, foul, leak, and loss of material.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical Systems
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness

During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit, the staff made the following observation on a relevant AMR item:

  • LRA Table 3.3.2-15-29, Radiation Monitoring System, Nonsafety-Related Components Affecting Safety-Related Systems, states that aluminum filter housings exposed to waste water will be managed for loss of material using the Internal Surfaces In Miscellaneous Piping and Ducting Components program. The staff noted during a breakout session with the applicant that (1) cracking due to SCC is known to occur in high- and moderate-strength aluminum alloys; (2) halide concentrations should generally be considered high enough to facilitate cracking due to SCC of aluminum alloys in waste water unless demonstrated otherwise; and (3) depending on the specific aluminum alloy used for the filter housings, the aging effect of cracking due to SCC may be applicable.

The staff will consider issuing an RAI to request the basis for why cracking due to SCC is not an applicable aging effect for aluminum filter housings exposed to waste water.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2012-02.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M38, as modified by LR-ISG-2012-02.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR, as modified by LR-ISG-2012-02.

LRA AMP B.1.19, Masonry Wall Summary of Information in the Application. The LRA states that AMP B.1.19, Masonry Walls, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S5, Masonry Walls. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP.

The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the nuclear reactor auxiliary building, fuel handling building, and turbine building. The staff also conducted an independent search of the applicants operating experience database using keywords: masonry, block, crack, and concrete.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00008 Aging Management Program Evaluation Report Civil/Structural Revision 1
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. EN-DC-150 Condition Monitoring of Maintenance Structures Revision 6, 11/21/2013
4. W-CS-2003-001-00 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 10/09/2003
5. WF3-CS-11-00001 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 01/12/2011
6. WF3-CS-16-00006 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 05/11/2016 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing programs modified by the proposed enhancements.

During the audit, the staff verified that the preventive actions and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the scope of program, parameters monitored or inspected, detection of aging effects, and acceptance criteria program elements not associated with the enhancement identified in the LRA or by the staff during the audit are consistent with the corresponding program elements in the GALL Report AMP. The staffs evaluation of aspects of these program elements associated with the enhancements will be addressed in the SER.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the preventive actions and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S5. The staff also verified that for the scope of program, parameters monitored or inspected, detection of aging effects, and acceptance criteria program elements, the aspects of the LRA AMP program elements not associated with the enhancements are consistent with the corresponding program elements in GALL Report AMP XI.S5. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.20, Metal Enclosed Bus Inspection Summary of Information in the Application. The LRA states that AMP B.1.20, Metal Enclosed Bus Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.E4, Metal Enclosed Bus Program. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document as well as the relevant operating experience.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the 4 kV and 6.9 kV switchgear, 230 kV transmission switchyard, transformer yard, 230 kV switching station, fire pump house, water treatment building, auxiliary building, and electrical penetration area. The staff also conducted an independent search of the applicants operating experience database using the keywords: MEB, cable bus, electrical bus, enclosed bus, connections, and metal enclosed bus.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EE14-00001 Electrical Screening and Aging Management Review Revision 1, 02/01/2016
2. WF3-EP-14-00002 Operating Experience Review Results - AERM Revision 0, 09/13/2015
3. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
4. WF3-EP-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 02/01/2016
5. CR-WF3-2014-01170 Condition Report (while performing quarterly thermography, hot Revision 0, spots were located on the insulator of generator output breaker 04/14/2014 cable connections)
6. CR-WF3-2008-02028 Condition Report (Isophase bus duct lead box housing contains Revision 0, a 9-inch long crack in the metal sidewall near the ceiling support) 05/12/2008
7. EN-DC-349 Metal Enclosed Bus Inspection Procedure Revision 3 11/21/2013
8. EN-DC-310 Predictive Maintenance Program (Thermography) Revision 7, 06/11/2015
9. EN-FAP-LR-026 License Renewal Non-EQ Electrical Cable Connection AMP Revision 4, 10/30/2014 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the

applicant has opted to include MEB enclosure assembly external surfaces inspection in this AMP instead of the structures monitoring program.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The review of a sample of work orders did not find any significant or unusual operating experience and no previously unknown or recurring aging effects were identified by the applicant or staff.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E4.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.21, Neutron-Absorbing Material Monitoring Summary of Information in the Application. The LRA states that AMP B.1.21, Neutron-Absorbing Material Monitoring, is an existing program with enhancement that will be consistent with the program elements in GALL Report AMP XI.M40, Monitoring of Neutron-Absorbing Materials Other than Boraflex. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancement associated with this AMP. The enhancement is evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: loss of attenuation, degradation of neutron-absorbing capacity, blisters, pits, and bulges.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. CR-WF3-2014- Boral Coupon Scheduling Issue 11/09/2014 05222
2. CR-WF3-2016- Change to Periodicity for Testing to Meet XI.M40 06/15/2016 03932
3. HPP-60994-9 Physical Properties Measurement Procedures Boral Surveillance Revision 1, Coupons for Waterford 3 Spent Fuel Racks, Holtec Project 05/04/1998 Procedure

Document Title Revision/Date

4. HPP-60994-9A Boral Surveillance Program for Waterford Unit 3 Spent Fuel Revision 2 Racks
5. NE-001-106 SFSR Boral Surveillance Program Revision 4
6. NET-191-01 Inspection and Testing of Boraflex and Boral Surveillance 11/27/2001 Coupons from Arkansas Nuclear One, Grand Gulf, and Waterford Stations
7. NET-28040-01 Inspection and Testing of Boraflex and Boral Surveillance 10/05/2010 Coupons from Arkansas Nuclear One, Grand Gulf, and Waterford Stations
8. SEP-191-02, NETCO Procedures for Measuring and Recording Boral Surveillance 10/14/1994 Coupon Physical Attributes The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.

During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M40.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.22, Nickel Alloy Inspection Summary of Information in the Application. The LRA states that AMP B.1.22, Nickel Alloy Inspection, is an existing program that is consistent with the program elements in GALL Report AMP XI.M11B, Cracking of Nickel-Alloy Components and Loss of Material Due to Boric Acid-Induced Corrosion in Reactor Coolant Pressure Boundary Components (PWRs only). To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: CRDM, reactor vessel, vessel head, nozzle, penetration, weld, stress corrosion, thermal sleeve, and PWSCC.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document and Number Title Revision/Date

1. LRA, Appendix B, Nickel Alloy Inspection Revision 0, Section B.1.22 3/23/2016
2. LRA, Appendix A, Nickel Alloy Inspection (FSAR Supplement) Revision 0, Section B.1.22 3/23/2016
3. WF3-EP-14-00003 WF3 License Renewal Project - Operating Experience Review Revision 0 Results - Aging Management Program Effectiveness (pages 70-75)
4. NOECP-107 Boric Acid Corrosion Control Program Revision 003, 7/13/2009
5. SEP-A600-001 Entergy Nuclear South, Alloy 600 Management Program Revision 0, 7/25/2006
6. SEP-ISI-104 Program Section for ASME Section XI, Division 1, Inservice Revision 002, Inspection Program 3/12/2014
7. Program Plan Waterford 3 Steam Electric Station, Inconel Alloy 600 Program Revision 1, Plan 6/6/2001
8. WF3-ME-14-00003 WF3 License Renewal Project - Aging Management Review of Revision 1, the Reactor Coolant System and Pressurizer 9/13/2015
9. WF3-EP-14-00006 Waterford 3 License Renewal Project - Aging Management Revision 0 Program Evaluation Results - Class 1 Mechanical, Section 4.1, Nickel Alloy Inspection Program
10. Program Owner Book Waterford 3 Nuclear Plant, B.1.22 Nickel Alloy Inspection Revision 0 Program Book
11. CR-WF3-2008-02001 Condition Report - Alloy 600 Project - Loop 1 Shutdown 5/5/2008 Cooling Nozzle Leakage
12. CR-WF3-2009-05822 Condition Report - NRC Concern with Boric Acid Leakage in 10/27/2009 the No. 2B Reactor Coolant Pump
13. CR-WF3-2005-01449 Condition Report - Pressurizer Heater Sleeve Leakage 4/19/2005
14. CR-WF3-2004-00839 Condition Report - Issuance of NRC Non-Cited Violation for 3/18/2004 Failure To Implement Effective Corrective Actions in Recurring Reactor Coolant Pressure Boundary Leakage in Nickel Alloy 600 Reactor Coolant System Nozzles
15. CR-WF3-2012-00927 Condition Report - Update of Current Licensing Basis to 2/22/2012 Implement ASME Code Case N-729-1 for Nickel Alloy Penetration Nozzles in the Upper Reactor Vessel Head in Replacement of Previous Requirements for These Components in NRC Order EA-03-009
16. CR-WF3-2012-07261 Condition Report - Implementation of ASME Code 12/6/2016 Case N-770-1 for Dissimilar Metal Welds in the RCS Cold Leg

- Including Submittal of NRC Relief Request for Limiting Ultrasonic Testing Coverage for These Components

17. ASME Code Alternative Examination Requirements for PWR Reactor 3/28/2006 Case N-729-1 Vessel Upper Heads with Nozzles Having Pressure-Retaining Partial-Penetration Welds,Section XI, Division 1

Document and Number Title Revision/Date

18. ASME Code Additional Examinations for PWR Pressure Retaining Welds in 1/26/2009 Case N-722-1 Class 1 Components Fabricated with Alloy 600/82/182 Materials,Section XI, Division 1
19. ASME Code Alternative Examination Requirements and Acceptance 12/25/2009 Case N-770-1 Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material with or without Application of Listed Mitigation Activities,Section XI, Division 1 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program.

During the audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that, for the scope of program, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff conducted its review during the audit as follows:

  • During the audit of the scope of program, parameters monitored or inspected, and detection of aging effects program elements, the staff noted that the scope of the program is limited only to nickel alloy components in the reactor coolant pressure boundary (RCPB) made of Alloy 600 base metal material or Alloy 600 type weld filler materials (i.e., Alloy 82, 182 and 82/182 weld materials). The staff also observed that the scope of the AMP does not include any components in the RCPB made from Alloy 690 base metal material or Alloy 690 type weld materials (i.e., Alloy 52, 152, and 52/152 weld materials including Alloy 600 components or Alloy 82/182 weld components mitigated with Alloy 690 half-nozzle repairs or Alloy 52/152 weld overlays). The staff further noted that this limits the scope of the program only to non-repaired or non-mitigated nickel alloy components in the reactor coolant system (RCS) cold legs.

The program does not include the nickel alloy penetration nozzles in the replaced upper reactor vessel closure head (RVCH), or the nickel alloy components (including weld components) RCS hot leg loops, pressurizer or steam generators that were repaired with either half nozzle or weld overlay repair designs (which use Alloy 690 base metal or Alloy 52, 152, or 52/152 weld materials).

In addition, the staff observed that, if the applicants AMP is evaluated by itself, the Nickel Alloy Inspection AMP would identify exceptions to scope of program, parameters monitored or inspected, and detection of aging effects elements of GALL Report AMP XI.M11B because the program would not implement the following augmented inspections: (a) augmented inspections of the nickel alloy penetration nozzles in the replaced upper reactor vessel head (made of Alloy 690 type materials), as subjected to the requirements in 10 CFR 50.55a(g)(6)(ii)(D) and ASME Code Case N-729-1, and (b) augmented inspections of nickel alloy components in the RCS cold leg loops, steam generators, and pressurizer that have been repaired or mitigated with either weld-overlay or half nozzle repairs, as subject to the requirements in 10 CFR 50.55a(g)(6)(ii)(F) and ASME Code Case N-770-1.

However, the staff also observed that the applicant implements the appropriate inspections of these components in accordance with the program element criteria for LRA AMP XI.M1, Inservice Inspection Program, which includes programmatic activities to implement the augmented inspection requirements in the following ASME Code Cases, as required by 10 CFR 50.55a: (a) ASME Code Case N-729-1 for inspections of the nickel alloy penetration nozzles in the upper RVCH, (b) ASME Code Case N-722-1 for performing bare metal visual examinations for boric acid leakage around RCPB base metal components made from Alloy 600 or weld components made from Alloy 82 or 182 weld filler metal materials, and (c) ASME Code Case N-770-1 for performing ultrasonic tests on piping components in the RCPB made from Alloy 600 base metal material or Alloy 82 or 182 weld material, including those that have been repaired or mitigated with Alloy 52 or 152 weld overlays, onlays, or inlays.

During the audit, the applicant informed the staff that the implementation of LRA AMP B.1.2, Boric Acid Corrosion Program, performs boric acid leakage inspections of nickel alloy components in the RCPB, including those component locations that had been repaired, replaced, or mitigated with Alloy 690 base metal material or Alloy 52, 152, or 52/152 weld filler materials.

During the audit, the staff determined that, when the program elements of the Nickel Alloy Inspection Program (LRA AMP B.1.22) are taken into account with the program elements of the Inservice Inspection Program (LRA AMP B.1.15) and Boric Acid Corrosion Program (LRA AMP B.1.2), the scope of program, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the Nickel Alloy Inspection Program are consistent with those in GALL Report AMP XI.M11B. Therefore, this issue is resolved.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The staff reviewed a number of condition reports associated with this AMP indicating that the applicant has experienced a number of reactor coolant leaks in nickel alloy RCPB components (e.g., penetration nozzles welded to the upper RVCH, nickel alloy instrumentation nozzles in the RCS hot leg loops and pressurizer, and pressurizer heater sleeves). In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff assessed the following operating experience topics discussed below.

  • The staff observed that, in general, the applicant has been appropriately implementing its inspections of nickel alloy component locations in the RCPB in accordance with the augmented inspection requirements and applicable ASME Code Case criteria in accordance with 10 CFR 50.55a. The staff also observed that the applicant has been using its condition report and corrective action program process to repair, replace, or mitigate the RCPB components that experienced leakage. The staff verified that any delays in implementing corrective actions to repair leaking components have been appropriately addressed by the NRCs regional inspection staff that are responsible for reactor oversight of Waterford Unit 3 and corrected by the applicant. The staff also verified that the applicants corrective actions process includes appropriate measures to address and resolve issues identified by the applicant and the NRC Regional Office with respect to this AMP.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that, when implementation of LRA AMP B.1.22, Nickel Alloy Inspection Program, is taken into account with implementation of the program elements of LRA AMP B.1.15, Inservice Inspection Program, and AMP B.1.2, Boric Acid Corrosion Program, the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of LRA AMP B.1.22, Nickel Alloy Inspection, are consistent with the corresponding program elements in GALL Report AMP XI.M11B. Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.23, Non-EQ Electrical Cable Connections Summary of Information in the Application. The LRA states that AMP B.1.23, Non-EQ Electrical Connections, is a new program that will be consistent with the program elements in GALL Report AMP XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirement. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the 4 kV and 6.9 kV switchgear, 230 kV transmission switchyard, transformer yard, 230 kV switching station, fire pump house, water treatment building, auxiliary building, and electrical penetration area. The staff also conducted an independent search of the applicants operating experience database using the keywords: connections, thermography, loose connection, and electrical bus.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 02/01/2016
2. CR-WF3-2014-01170 Condition Report (while performing quarterly thermography, hot Revision 0, spots were located on the insulator of generator output breaker 04/14/2014 cable connections)
3. EN-DC-310 Predictive Maintenance Program (Thermography) Revision 7, 06/11/2015
4. ME-004-809 Low/Medium Voltage Power and Control Cable/Conductor Revision 306, Terminations and Splices 11/06/2015
5. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015

Document Title Revision/Date

6. WF3-EE14-00001 Electrical Screening and Aging Management Review Revision 1, 02/01/2016
7. EN-FAP-LR-026 License Renewal Non-EQ Electrical Cable Connection AMP Revision 4, 10/30/2014
8. WF3-EP-14-00002 Operating Experience Review Results - AERM Revision 0, 09/13/2015 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff noted that the applicant has opted to exclude visual inspection as an alternative method of monitoring electrical connections per the detection of aging effects element as described in the GALL Report.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. The review of a sample of work orders did not find any significant or unusual operating experience and no previously unknown or recurring aging effects were identified by the applicant or staff.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E6.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.24, Non-EQ Inaccessible Power Cables (> 400 V)

Summary of Information in the Application. The LRA states that AMP B.1.24, Non-EQ Inaccessible Power Cables ( 400 V) program, is a new program with exception that will be consistent with the program elements in GALL Report AMP XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the exception associated with this AMP. The exception to the GALL Report AMP is evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the fire pump house, water treatment building, turbine building, and locations for manholes M308-NA, M328-NAB, and M329-NAB; and hand holes H331-NA and H330-NAB. The staff also conducted an independent search of the applicants operating experience database using keywords: cable, jacket, arcing, thermal, connection, contamination, discoloration, swelling, insulation, vault, manhole, submerged, and moisture.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. 3/CA/31322A Summary - CA Cable 31322A As-Built N/A
2. 3/CA/31323D Summary - CA Cable 31323D As-Built N/A
3. 3/CA/31322H Summary - CA Cable 31322H As-Built N/A
4. WF3-EP-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 2/1/2016
5. WF3-EP-14-00003 Operating Experience Results - Aging Management Program Revision 0, Effectiveness 11/30/2015
6. WF3-EE-14-00001 Electrical Screening and Aging Management Review Revision 1, 2/16/2016
7. C349 Yard Duct Runs and Outdoor Lighting Revision 20, 3/19/2015
8. WF3-EP-14-00002 Operating Review Results AERM Revision 0, 9/13/2015
9. W3F1-2007-0065 Response to NRC RAI on GL 2007-01, Inaccessible or 12/18/2007 Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
10. W3F1-2007-0017 Response to GL 2007-01 5/3/2007
11. EN-DC-346 Cable Reliability Program Revision 7 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the new program as modified by the proposed exception.

During the audit, the staff verified that the scope of program, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. The staff also verified that aspects of the preventive actions program element not associated with the exception identified in the LRA are consistent with the corresponding program elements in the GALL Report AMP. The staffs evaluation of aspects of this program element associated with the exception will be addressed in the SER.

In order to verify that with the exception, the LRA AMP will remain adequate to manage the applicable aging effects, staff will consider issuing an RAI for the subject discussed below.

  • The applicant stated that periodic manhole inspections will be performed to assess that cable and cable support structures are intact, but the inspection frequency will not be increased if water is found in the manholes during the inspections. The applicant further stated that because of the elevation of the plant site and manholes, water cannot be prevented from entering the manholes. The applicant concluded that manhole inspections will assess cable and support damage because of exposure to significant moisture, and periodic testing will provide reasonable assurance that each cable will continue to perform its intended function through the period of extended operation. The in-scope inaccessible cables identified by the applicant are the 480V electric motor-driven fire pump and the electric motor-driven jockey fire pump.

The GALL Report AMP XI.E3 program element preventive actions recommends that periodic actions are taken to prevent inaccessible cables from being exposed to significant moisture, such as identifying and inspecting in-scope accessible cable conduit ends and cable manholes for water collection, and draining the water, as needed. In addition, GALL Report AMP XI.E3 also recommends that the inspection frequency for water collection is established and performed based on plant-specific operating experience with cable wetting or submergence in manholes (i.e., the inspection is performed periodically based on water accumulation over time and event-driven occurrences, such as heavy rain or flooding). GALL Report AMP XI.E3 further recommends that If water is found during inspection (i.e., cable exposed to significant moisture), corrective actions are taken to keep the cable dry and to assess cable degradation.

It is not clear to the staff that the inaccessible power cables supplying the electric motor-driven fire pump and electric motor-driven jockey fire pump, when subjected to significant moisture for extended periods, will continue to perform their intended function during the period of extended operation.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description, not associated with the exception, is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E3. The staff also verified that for the preventive actions program element, the aspects of the LRA AMP program element not associated with the exception are consistent with the corresponding program element in GALL Report AMP XI.E3.

The staffs evaluation of aspects of the program element associated with the exception will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement, not associated with the exception, is consistent with the description provided in the SRP-LR.

LRA AMP B.1.25, Non-EQ Sensitive Instrumentation Circuits Test Review Summary of Information in the Application. The LRA states that AMP B.1.25, Non-EQ Sensitive Instrumentation Circuits Test Review, is a new program that will be consistent with the program elements in GALL Report AMP XI.E2, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the AMP program elements described in the applicants basis document, referenced supporting documentation, and relevant plant-specific operating experience.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns that included viewing an area radiation monitor in the control room annulus. The staff also conducted an independent search of the applicants operating experience database using the keywords: excore, high range rad, containment rad, containment area monitor, ENIINFD000, neutron flux, neutron flux detector, PRMIRE7050, ARMIRD, radiation monitor, and shield wall.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EE-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
2. WF3-EE-14-00001 Electrical Screening and Aging Management Review Revision 1, 02/01/2016
3. WF3-EP-14-00002 Operating Experience Review Results - Aging Effects Requiring Revision 0, Management (AERM) 09/13/2015
3. WF3-EE-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 02/01/2016
4. MI-003-101 NI Linear Power Channel Calibration Safety Channel A, B, C, or Revision 014, D 08/28/2014
5. EN-FAP-LR-027 License Renewal Sensitive Instrumentation Circuits Review AMP Revision 1, 11/21/2013
6. MI-005-919 Containment Post LOCA Area Radiation Monitor Safety Channel Revision 303, A or B Calibration ARMIR5028, 5029, 5030, 5031 08/07/2014
7. MI-003-102 NI Log Power Channel Calibration Safety Channel A, B, C, and D Revision 311, 11/15/2014

Document Title Revision/Date

8. MI-003-352 Purge Isolation Area Radiation Monitor Safety Channel Revision 302, Calibration ARMIR5024, ARMIR5025, ARMIR5026, or 06/26/2014 ARMIR5027
9. MI-003-365 Fuel Handling Building Ventilation Monitor Safety Channel A or B Revision 6, Calibration ARMIR0300.1, ARMIR0300.2, ARMIR0300.3, or 09/26/2006 ARMIR0300.4
10. MI-003-371 Fuel Handling Building Ventilation System Emergency Exhaust Revision 308, High Range Noble Gas Radiation Monitor Channel Calibration 04/15/2014 PRMIR3032
11. MI-003-374 Control Room Outside Air Intake Isolation Radiation Monitor 09/17/2013 Channel Calibration ARMIR0200 1, 2, 5, and 6
12. MI-003-391 Component Cooling Water System A or Liquid Radiation Monitor Revision 307, Channel Calibration PRMIR7050 A or B 03/25/2014 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff).

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.E2, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.26, Non-EQ Insulated Cables and Connections Summary of Information in the Application. The LRA states that AMP B.1.26, Non-EQ Insulated Cables and Connections Program, is a new program that will be consistent with the program elements in GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant, including corrective actions, work orders, procedures, and surveillance documentation. In addition, the staff conducted walkdowns of the water treatment building, turbine building, fire pump house, transformer yard, switchgear, and electrical penetrations. The staff also conducted an independent search of the applicants operating experience database using the keywords: cable, jacket, arching, thermal, connection, contamination, discoloration, swelling, insulation, and moisture.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00009 Aging Management Program Evaluation Results - Electrical Revision 1, 02/01/2016
2. EN-DC-348 Non-EQ Insulated Cables and Connection Inspection Revision 5
3. WF3-EP-14-00003 Operating Experience Results - Aging Management Program Revision 0, Effectiveness 11/30/2016
4. Work Order Replace RCP 2B Motor Cables 11/9/2009 00135468
5. EN-WM-105 Work Order 135468-01 Equipment RC EMTR1B-8A - 02/03/2007 Maintenance Support
6. WF3-EE-14-00001 Electrical Screening and Aging Management Review Revision 1, 02/16/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the parameters monitored or inspected program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
  • WF3-EP-14-00009, Aging Program Evaluation Results, Electrical, Section 3.5.B.3.b, Comparison to WF3 Parameters Monitored or Inspected states that a representative sample of accessible insulated cables and connections within the scope of license renewal will be visually inspected for cable and connection jacket and connection insulation surface anomalies indicating signs of reduced insulation resistance. This sample of accessible cables will represent, with reasonable assurance, all cables and connections in an adverse localized environment.

The use of a representative sample of accessible insulated cable and connections as described in WF3-EP-14-00009 does not agree with the applicants LRA AMP or GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements. Instead, the applicants LRA AMP recommends visual inspection of all accessible insulated cables and connections and

GALL Report AMP XI.E3, Insulation Material for Electrical Cables and Connections Not Subject to 10 CFR 50.49 Requirements, recommends visual inspection of accessible insulated cables and connections as an acceptable component sampling approach.

It is not clear to the staff that the applicants Non-EQ Insulated Cables and Connections Program will be consistent with the GALL Report because the applicants aging management program evaluation for the parameters monitored or inspected program element describes the applicants program as inspecting a sample of accessible insulated cables and connections rather than inspecting all accessible cables and connections, as recommended in the GALL Report.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. No previously unknown or recurring aging effects were identified by the applicant or staff.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP X1.E1, Non-EQ Insulated Cables and Connections Program. The staff also identified certain aspects of the parameters monitored or inspected program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.27, Oil Analysis Summary of Information in the Application. The LRA states that AMP B.1.27, Oil Analysis Program, is an existing program that is consistent with the program elements in GALL Report AMP XI.M39, Lubricating Oil Analysis. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: lubricating, oil, and samples.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results - Non-Class 1 Revision 0 Mechanical
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. EN-CY-103 Diesel Fuel, Lubricating Oil, and Grease Analytical Services Revision 0
4. EN-DC-310 Predictive Maintenance Program Revision 6
5. EN-LI-102 Corrective Action Program Revision 24
6. EN-LI-121 Trending and Performance Review Process Revision 17
7. UNT-005-007 Safety Related Procedures Revision 304
8. CR-WF3-2013-05537 Oil Analysis of ACCEMTR3b 6, Auxiliary Component Cooling 11/13/2013 Water Pump A Motor
9. CR-WF3-2006-02278 Oil Analysis Results 08/08/2006
10. CR-WF3-2012-02394 Oil Analysis Results 05/11/2012
11. Lube Comparison Trending Results for Cooling Water Pump Oil 07/13/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M39.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.28, One-Time Inspection Summary of Information in the Application. The LRA states that AMP B.1.28, One-Time Inspection, is a new program that will be consistent with the program elements in GALL Report AMP XI.M32, One-Time Inspection. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements as described in the applicants basis document. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: biological, buried, crack, and fouling.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results, Non-Class 1 Revision 0 Mechanical, One-Time Inspection
2. WF3-ME-14-00010 WF3 License Renewal Project: Aging Management Review of Revision 1 the Fire Protection: Water System
3. Pure Technologies Engineering Report: Condition Assessment of PCCP, Waterford 3/12/2013 US, Inc. Report Unit 3 - 132-inch Cooling Water Discharge Line, D-2 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the acceptance criteria program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing RAIs for the subject discussed below.
  • The acceptance criteria program element of the LRA AMP states that the program will verify that unacceptable loss of material or cracking is not occurring or is, so insignificant that a plant-specific aging management program is not warranted. The GALL Report AMP recommends any indication or relevant conditions of degradation detected are evaluated. It is not clear to the staff that these statements are consistent because the GALL Report recommends evaluating any indication while the AMP evaluates significant indications. It is unclear to the staff how the applicant will determine if an indication is significant.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.

  • LRA Section B.1.28, One-Time Inspection, notes that the program will be used to verify that change in material properties, loss of material and cracking are not occurring for reinforced concrete portions of the circulating water intake piping exposed to raw water.

The GALL Report includes AMR items for concrete piping exposed to raw water and recommends XI.M20, Open-Cycle Cooling Water System, for managing the effects of aging of this material/environment combination. During the audit, the staff reviewed a report prepared by Pure Technologies US, Inc. summarizing a previous inspection

conducted on similar concrete piping in a 132-inch cooling water discharge line. The summary report noted that a majority of the pipe joints exhibited separation and/or spalling and recommended all pipeline joints be cleaned and mortared to prevent corrosion of the joint steel and potential leaks. The report also recommended a re-inspection of the pipeline in approximately 5 years. Based on the operating experience and the GALL Report recommendations, it is unclear to the staff why it is appropriate to manage the effects of aging on concrete portions of the circulating water intake piping exposed to raw water through the one-time inspection program.

The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI related to acceptance criteria as discussed above. If the response to the RAI leads to an update in the acceptance criteria, the FSAR supplement may need to be updated accordingly.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M32. The staff identified certain aspects of the acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined. In addition, the staff identified a corresponding need for additional information regarding the adequacy of the program description in the FSAR supplement.

Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP.

LRA AMP B.1.29, One-Time Inspection - Small-Bore Piping Summary of Information in the Application. The LRA states that AMP B.1.29, One-Time Inspection - Small-Bore Piping, is a new program that will be consistent with the program elements in GALL Report AMP XI.M35, One-Time Inspection of ASME Code Class 1 Small-Bore Piping. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: weld, cracking, crack, failure, socket, sockolet, weldolet, butt weld, thermal, fatigue, and leakage.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Program Basis Document, Aging Management Program Revision 1, Evaluation Results - Class 1 Mechanical One-Time 05/01/2013 Inspection - Small-Bore Piping

Document Title Revision/Date

2. WF3-EP-14-00003 Operating Experience Review Results - Aging Revision 0, Management Program Effectiveness 11/30/2015
3. N/A Providing Class 1 Small Bore Piping Weld Population 07/28/2016
4. LER-382-2000-003 Shutdown Per TS LCO 3.0.3 due to Cracked Weld 04/05/2000
5. LER-382-2012-003 Cracked Instrumentation Line Affects Fire Protection Safe 11/16/2000 Shutdown Analysis
6. LER-382-2003-003 RCS Pressure Boundary Leak due to PWSCC 12/18/2003 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

For the detection of aging effects program element, sufficient information was not available to determine whether it was consistent with the corresponding program element of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

GALL Report AMP XI.M35 states under the detection of aging effects program element that [t]his inspection should be performed at a sufficient number of locations to ensure an adequate sample. This number, or sample size, is based on susceptibility, inspectability, dose considerations, operating experience, and limiting locations of the total population of ASME Code Class 1 small-bore piping locations. LRA Sections B.1.29 and A.1.29 do not provide the total number of in-scope small-bore piping welds. It is not clear to the staff how the inspection sample will be selected and thus whether a sufficient number of locations will be inspected to ensure that cracking will be adequately managed.

LRA Section B.1.29 states that volumetric examinations of butt welds (full penetration welds) using demonstrated techniques will be performed. There was insufficient information available during the audit for the staff to determine what constitutes a demonstrated technique for volumetric examinations of butt welds. The staff noted that, for butt weld inspections, there are well-established, qualified UT techniques and procedures with flaw-sizing capabilities available. The staff also noted that the applicant has previously performed UT examinations of butt welds using qualified techniques as part of its inservice inspection program. The staff will request clarification related to the examination of butt welds.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M35. The staff also identified certain aspects of the detection of aging effects program element of the LRA AMP for which additional information and evaluation are required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.30, Periodic Surveillance and Preventive Maintenance Summary of Information in the Application. The LRA states that AMP B.1.30, Periodic Surveillance and Preventive Maintenance, is a plant-specific program with enhancements that will be used to manage the aging of components that do not fall within the scope of other aging management programs. The staff reviewed the Periodic Surveillance and Preventive Maintenance program against the elements of an AMP for license renewal as described in SRP-LR, Revision 2, Section A.1.2.3. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, crack, wall loss, through wall, piping, foul, loss of material, leak, and wear.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical Systems
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. WF3-ME-14-00007 Aging Management Review of the Plant Drains Revision 0
4. WF3-ME-14-00019 Aging Management Review of the Control Room HVAC System Revision 1
5. WF3-ME-14-00009 Aging Management Review of the Component Cooling Water and Revision 1 Auxiliary Component Cooling Water Systems
6. WF3-ME-14-00008 Aging Management Review of the Emergency Generator System Revision 1
7. ESSE-WM-309 Dry Cooling Tower A Portable Sump Pump Revision 0, 01/11/2000
8. OP-003-024 Sump Pump Operation Revision 309 The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements described in SRP-LR, Revision 2, Section A.1.2.3. In addition, the staff found that for the scope of program, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3, the staff will consider issuing RAIs for the subjects discussed below.

  • The following impacts the scope of program program element. The program description table states that accumulators, filter housings, piping, pump casings, and valve bodies in the blowdown system will be managed for loss of material. However, LRA Table 3.4.2-5-1, Blowdown System, Nonsafety-Related Components Affecting Safety-Related Systems, also lists tanks. It is unclear to the staff if tanks in the blowdown system are included within the scope of the program.
  • The following impacts the parameters monitored or inspected and detection of aging effects program elements. It is unclear to the staff if physical manipulation will be used to augment visual inspection of the elastomeric portable smoke-ejector duct in the control room HVAC system. The parameters monitored or inspected program element states that polymeric components are inspected for hardening as evidenced by loss of suppleness (i.e., physical manipulation). However, the program description table states that the inspection will consist of a visual inspection and the detection of aging effects program element states that established techniques such as visual inspections are used, indicating that physical manipulation will not be used to augment visual inspections. The proposed RAI would request clarification on this issue.
  • The following impacts the detection of aging effects program element. LRA Table 3.3.2-7, Emergency Diesel Generator System, states that stainless steel expansion joints exposed to exhaust gas will be managed for cracking using the Periodic Surveillance and Preventive Maintenance program. The program description table in LRA Section B.1.30 states that the program inspection activity for the emergency generator system will be to monitor the surface condition of the expansion joint to verify the absence of cracking. It is unclear to the staff what inspection activities are included in monitoring the surface condition of the stainless steel expansion joints in order to verify the absence of cracking.
  • The following impacts the detection of aging effects program element. LRA Table 3.3.2-7, Emergency Diesel Generator System, states that stainless steel heat exchanger tubes externally exposed to lubricating oil, fuel oil, and treated water will be managed for loss of material due to wear using the Periodic Surveillance and Preventive Maintenance program. The program description table in LRA Section B.1.30 states that a visual inspection of the surface condition of a representative sample of stainless steel heat exchanger tubes will be performed to manage loss of material due to wear.

Because access to the external surfaces of heat exchanger tubes is typically very limited because of tube spacing, tube supports, etc., it is unclear to the staff whether a visual inspection of the tubes external surfaces can be reasonably expected to detect loss of material due to wear.

  • The following impacts the detection of aging effects program element. LRA Table 3.3.2-3, Component Cooling and Auxiliary Component Cooling Water System, states that aluminum heat exchanger fins and carbon steel heat exchanger tubes exposed to condensation will be managed for reduction of heat transfer using the Periodic Surveillance and Preventive Maintenance program and loss of material using the External Surfaces Monitoring program. However, the program description table states loss of material and reduction of heat transfer will be managed using the Periodic Surveillance and Preventive Maintenance program. It is unclear to the staff if loss of material will be managed using the External Surfaces Monitoring or Periodic Surveillance and Preventive Maintenance program. If loss of material for the fins and tubes will be managed by the Periodic Inspection and Preventive Maintenance program, then it is unclear to the staff how a visual inspection can detect loss of material of carbon steel heat exchanger tubes.

During the audit, the staff made the following observation:

  • LRA Table 3.3.2-14, Plant Drains, states that the external surfaces of gray cast iron pump casings are exposed to air-outdoor and that the internal surfaces of gray cast iron pump casings are exposed to waste water. However, Engineering Report WF3-ME-14-00007, Aging Management Review of Plant Drains, states that Dry Cooling Tower Portable Sump Pump casings and foot valves made of gray cast iron are immersed in waste water. Aging effects for the external surfaces of these components are the same as those for the internal surfaces of the same material, exposed to the same environment. During a breakout session, the staff noted that it was unclear whether the external surfaces of the gray cast iron pump casings are exposed to air-outdoor or waste water. In response, the applicant provided drawing ESSE-WM-309, showing that the portable sump pump is located on the floor above the drain sump which is below the floor elevation. In addition, procedure OP-003-024, Section 11.9, provided images showing that the portable sump pumps were above the drain sump exposed to air.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the preventive actions, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements described in SRP-LR, Revision 2, Section A.1.2.3. The staff also identified certain aspects of the scope of program, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant provides objective evidence to support the conclusion that the effects of aging will be managed adequately so that the structure and component intended functions will be maintained during the period of extended operation as described in SRP-LR, Revision 2, Section A.1.2.3.10. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.31, Protective Coating Monitoring and Maintenance Summary of Information in the Application. The LRA states that AMP XI.S8, Protective Coating Monitoring and Maintenance Program, is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.S8, Protective Coating Monitoring and Maintenance Program. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed an enhancement associated with this AMP. The enhancement is evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: degradation, loss of material, blister, flaking, and peeling.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. Commitment A8350 Evaluation of Containment Coatings 02/27/1985
2. Commitment P26867 Response to GL 2004-02, Potential Impact of Debris Blockage of 09/16/2005 Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (Waterford 3)
3. CR-WF3-2005- Coating Inspections of Service Level I Coatings in 2005 05/05/2005 02046
4. CR-WF3-2011- Coating Inspections of Service Level I Coatings During RFO 17 04/25/2011 02987
5. CR-WF3-2015- Coating Inspections of Service Level I Coatings During RFO 20 11/18/2015 08489
6. EN-DC-220 Safety-Related Coatings Program Revision 2
7. NOECP-451 Conducting Engineering Inspection of Reactor Containment Revision 1 Building Protective Coatings
8. W3P86-2369 Implementation of Containment Coating Visual Inspections During 09/09/1986 Refueling Outages
9. W3P86-2720 Containment Coating Visual Inspections During Refueling 10/13/1986 Outages The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.

During the audit, the staff verified that the scope of program, preventive action, parameters monitored or inspected, and monitoring and trending program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the detection of aging effects and acceptance criteria program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding

program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The scope of program program element of the LRA AMP states that the Protective Coating Monitoring and Maintenance Program manages the effects of aging on Service Level I coatings applied to external surfaces of carbon steel and concrete inside containment. The GALL Report AMP requires that the minimum scope of the program is Service Level I coatings applied to steel and concrete surfaces inside containment to minimize degradation of coatings that can lead to clogging of Emergency Core Cooling Systems (ECCS) suction strainers. This ensures operability of post-accident safety systems that rely on water recycled through the containment sump/drain system. It is not clear to the staff that these statements are consistent because the applicants inspection program documents do not specify the surfaces to be inspected. In addition, in response to GL 2004-02 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650616), the applicant described indeterminate coatings, which are considered failed coatings that transport completely to the sump.

Therefore, it is not clear to the staff how these indeterminate coatings are addressed in the applicants inspection program to effectively manage such coatings inside containment.

  • The acceptance criteria program element of the LRA AMP states that the Protective Coating Monitoring and Maintenance Program meets the technical basis of ASTM D 5163-08 and provides an effective method to assess coating condition through visual inspections. The GALL Report AMP recommends additional ASTM and other recognized test methods, in addition to visual inspections, for use in characterizing the severity of observed defects and deficiencies. It is not clear to the staff that these statements are consistent since it appears that the applicant has not performed additional tests (e.g., adhesion tests) to properly bound degradation of Service Level I coatings that are present in the Containment Building.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is not bounded by known industry operating experience. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.

  • During the audit, the applicant provided information to the staff regarding coating degradation found in containment. The failed coating system was Carboline Carbo Zinc 11 (CZ11) primer top coated with Carboline Phenoline 305. The applicant concluded that the failure mechanism was splitting of CZ11 primer where the primer split, leaving CZ11 on the substrate. The staff noted that the reason for the splitting of the CZ11 primer is unknown. It is not clear to the staff that the operating experience for the applicants Service Level I coatings is consistent with industry operating experience since a root cause evaluation was not performed to determine the reason for the splitting of the CZ11 primer.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, and monitoring and

trending program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S8. The staff also identified certain aspects of the acceptance criteria program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.32, Reactor Head Closure Studs Summary of Information in the Application. The LRA states that AMP B.1.32, Reactor Head Closure Studs is an existing program with enhancements that is consistent with the program elements in GALL Report AMP XI.M3, Reactor Head Closure Stud Bolting. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: bolt, bolting, closure stud, stress corrosion cracking, wear, and cracking.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Program Basis Document, Aging Management Program Revision 1, Evaluation Results - Class 1 Mechanical 05/01/2013
2. WF3-EP-14-00006 Program Basis Document, Aging Management Program Revision 1, Evaluation Results - Class 1 Mechanical, Reactor Head 05/01/2013 Closure Studs.
3. CR-WF3-2003- Reactor Vessel Head Stud Leakoff Line Pressure High as 11/28/2003 03780 Indicated by Annunciator
4. CR-WF3-2003- Vessel Head East Guide Stud was Bound 09/08/2003 03620
5. CR-WF3-2009- Wastage Noticed at Outside Seating Surface Between Stud 05/11/2009 06667 No. 8 and No. 9
6. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0, Program Effectiveness 11/30/2015
7. CR-WF3-2012- Reactor Vessel Flange Leakoff Line 10/13/2012 05113
8. CR-WF3-2008- Boron Trail Detected Due to Flange Leak Near Stud Hole No. 26 05/05/2008 01931
9. CR-WF3-2007- Reactor Vessel Head Flange O-Ring Leak 10/31/2007 03385
10. CR-WF3-2007- Reactor Vessel Head Flange O-Ring Leak 09/04/2007 03129
11. Certificate of Test The Timeken Company, Canyon, OH 44706 03/05/1973 M-1028-1-74170 Certificate of Test for Closure Studs for Heat Number 80751

Document Title Revision/Date

12. Contract 74170 List of Piece, Code, and Heat Numbers 03/05/1973
13. UNT-006-032 Coating and Corrosion Program Revision 0, 03/31/2016 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M3. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in SRP-LR.

LRA AMP B.1.33, Reactor Vessel Internals Summary of Information in the Application. The LRA states that the Reactor Vessel Internals Program is an existing program with an enhancement that will be consistent with the program elements in GALL Report AMP XI.M16A, PWR Vessel Internals. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancement associated with this AMP. The enhancement will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using keywords: cracking, fracture, loss of material, stress corrosion cracking, PWSCC, cast, preload, and SCC.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Aging Management Program Evaluation Results - Class 1 Revision 0 Mechanical

Document Title Revision/Date

2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. WF3-ME-14-00002 Aging Management Review of the Reactor Vessel Internals Revision 1
4. CEP-RR-001 ASME Section XI Repair/Replacement Program Revision 310
5. LTR-CI-03-63 3716 MWt Power Uprate Waterford Unit 3 Reactor Vessel Revision 1, Internals Materials (Proprietary) 11/16/2004
6. LTR-RIAM-15-22 Summary of Waterford Unit 3 Expert Elicitation Panel Meeting Revision 0, Minutes for Reactor Internals Components and Materials 04/08/2015 (Proprietary)
7. CR-WF3-2008-02131 Condition Report for Reactor Vessel Core Barrel Removal and 05/09/2008 FME Inspection
8. CR-WF3-2014-02414 Condition Report for the Identification of Crack (Gap) on the 05/07/2014 Corner of the Core Shroud (Barrel)
9. DCP-3398 Incore Instrument Thimble Replacement 05/11/1995
10. No document ID Waterford 3 7th Refuel Outage Summary Report 11/09/1995 Number Available
11. License Renewal Thermal Aging Embrittlement of Cast Austenitic Stainless Steel 05/19/2000 Issue No. 98-0030 1 Components
12. Topical Report Reactor Internals Acceptance Criteria Methodology and Data Revision 2, No. WCAP-17096-NP1 Requirements 05/19/2010
13. NRC Safety Proprietary Safety Evaluation of Topical Report 05/03/2016 Evaluation WCAP-17096-NP, Revision 2, Reactor Internals Acceptance Criteria Methodology and Data Requirements1
14. Topical Report Statistical Assessment of PWR RV Internals CASS Materials Revision 0, No. PWROG-15032-NP (A Westinghouse Non-Proprietary Class 3 Report) 11/30/2015
15. NRC Staff Staff Assessment of PWROG-15032 09/06/2016 Assessment Notes: 1.Although WCAP-17096-NP was submitted as a nonproprietary report, the NRC safety evaluation for the report includes some proprietary RAI discussions. The referenced safety evaluation is designated as a proprietary safety evaluation that is not available for public review. The publically available, nonproprietary version of this safety evaluation (dated May 3, 2016) is available in NRC ADAMS (Accession No. ML16061A243).

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancement.

During the audit, the staff verified that the preventive actions and parameters monitored/inspected program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the scope of program, detection of aging effects, monitoring and trending, and acceptance criteria program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements in GALL Report AMP XI.M16A, PWR Vessel Internals. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs as needed for the subjects discussed below.

  • Scope of Program and Response to Applicant/Licensee Action Item (A/LAI) #2 on the Methodology for Implementing MRP-227-A. In its response to A/LAI #2 on the MRP-227-A report, the applicant identified that the following components were not

evaluated in TR No. MRP-191 but are within the scope of the LRA and are subject to an AMR: (a) flow restrictor plugs, (b) core stabilizing shims, (c) core stabilizing dowel pins, and (d) incore instrumentation (ICI) couplings. The applicant stated that these components were evaluated and classified as components not requiring additional aging management beyond that specified for the components in the MRP-227-A report. The applicant also stated that the core stabilizing bolts were evaluated and classified as components that will be inspected in accordance with the Existing Program requirements of the Waterford 3 ASME Section XI In-Service Inspection Program.

During the audit, the staff reviewed documents that described the expert panel decision process for assessing these components in accordance with MRP-227-A, and the basis for dispositioning the components in accordance with one of four inspection categories for PWR reactor vessel internal (RVI) components in the MRP-227-A report. After reviewing the documents, the staff determined that the applicants methodology and basis for categorizing these components as either No Additional Measures components or Existing Program components for the AMP was sufficiently conservative and acceptable. The staffs issue on this matter is resolved.

  • Detection of Aging Effects Element. In the basis document for the AMP, the applicant stated that the Reactor Vessel Internals Program implements the inspection criteria in the following tables in MRP-227-A: (a) Table 4-3 for primary components, (b) Table 4-6 for expansion components, and (c) Table 4-9 for existing program components. The staff noted that GALL Report AMP XI.M16A indicates that the inspection guidance in Chapter 4 of MRP-227-A should be used to inspect the RVI components at a given PWR facility; MRP-227-A identifies that the following inspection tables in Chapter 4 of the MRP-227-A should be used or referenced for inspections of RVI components that are included in Combustion Engineering (CE)-designed nuclear plants: (a) Table 4-2 for primary components, (b) Table 4-5 for expansion components, and (c) Table 4-8 for existing program components. The staff also observed that the basis document for the Reactor Vessel Internals AMP referenced the inspection tables in MRP-227-A that apply to Westinghouse-designed RVI components, and not the inspection tables in the report for the RVI components at plants designed by CE (including Waterford 3). It is not clear to the staff that these statements are consistent with the detection of aging effects program element in GALL Report AMP XI.M16A because the AMP should be referencing the applicable inspection tables in MRP-227-A that apply to CE-designed RVI components, and not those for Westinghouse-designed RVI components.
  • Detection of Aging Effects Element. In the basis document for the AMP, the applicant states that VT-3 visual methods are applied for the detection of cracking. The program element criteria in GALL Report AMP XI.M16A identify that VT-3 visual methods are acceptable for detecting cracking in redundant components, such as redundant bolts or pins. The GALL Report AMP also states that VT-3 visual methods can be applied to non-redundant components only when the flaw tolerance for a particular component is known and the component has been shown to be tolerant of easily detected large flaws.

It is not clear to the staff that these statements are consistent with the detection of aging effects element in AMP XI.M16A because the applicant did not initially specify whether the VT-3 visual methods are being applied to redundant or non-redundant components in the RVI design. During the audit, the applicant provided documents demonstrating that the applicant will be using VT-3 methods only for visual inspections of redundant RVI components in the plant design. Consistent with MRP-227-A, EVT-1 visual methods will be used for detection of cracking in non-redundant RVI components

(e.g., non-redundant welds or non-redundant structural or support components). The staffs issue on this matter is resolved.

  • Detection of Aging Effects and Response to A/LAI #2 on the Methodology for Implementing MRP-227-A. In A/LAI #2, the staff stated that PWR license renewal applicants are responsible for identifying all RVI components that are within the scope of the LRA for its facility and any differences from the assumptions and augmented inspection criteria defined in the MRP-227-A report. The staff also asked the applicant to identify any necessary modifications of the programmatic condition monitoring criteria that are defined for CE-designed RVI components in the MRP-227-A report.

In the MRP-227-A and MRP-191 reports, the ERPI identifies that loss of material due to wear is an applicable aging effect for the thimble tubes in CE-designed PWRs. In the documentation reviewed during the audit, the staff noted that the applicant stated that ABB Combustion Engineering has designed a new wear resistant thimble that has replaced the zircaloy in the wear zone with a chrome plated stainless steel section of greater wall thickness. Therefore, the staff verified that the applicant would not need to identify loss of material due to wear as an applicable aging effect requiring management (AERM) for the ICI thimble tubes. The staffs issue on this matter is resolved.

In MRP-191, EPRI identifies that CE-designed thimble tubes are made from zircaloy materials, and not from stainless steel. The staff verified that the applicant appropriately addressed the difference in material in its LRA evaluation basis for resolving the request in A/LAI #2. Based on its assessment, the applicant identified that a different aging effect and mechanism (i.e., changes in component dimensions induced by irradiation growth) is applicable to the design of the stainless steel ICI thimble tubes at Waterford 3 and proposed a plant-specific basis to manage this aging effect. Specifically, the applicant identified that the Reactor Vessel Internals Program will be adjusted to include physical measurements of the ICI thimble tubes in order to monitor for potential changes in dimensions in the components. The staff noted that this type of plant-specific management basis is consistent with other MRP-defined or PWROG-defined physical measurement bases for managing changes in dimension in RVI components. However, the staff noted that the applicant will need to better define the type of physical measurements that will be performed on the ICI thimble tubes during the period of extended operation. The staff also noted that it is necessary for the applicant to address how the physical measurements will be completed and to define the acceptance criteria that will be applied to the assessment of the physical measurement results.

  • Detection of Aging Effects Element. In relation to the detection of aging effects element for AMP B.1.33, the MRP-227-A report identifies that the following RVI components in CE-designed plants should be inspected for cyclic load-induced cracking using visual EVT-1 methods if the fatigue life of the components cannot be demonstrated by time-limited aging analysis (TLAA): (a) lower flange weld in the core support barrel assembly, (b) core support plate in the lower support structure, and (c) for CE-plants whose core shrouds were designed and assembled with full-height shroud plates, in the fuel alignment plate for the upper internals assembly. The condition monitoring criteria in MRP-227-A for CE-designed fuel alignment plates do not apply to the design at Waterford 3 because the core shroud was not designed and assembled using full height shroud plates (i.e., the shroud is designed with a gap area).

During the audit, the staff identified that LRA Section 4.3.1.2 provides the applicants metal fatigue TLAA for the RVI components at Waterford 3. However, the staff noted that LRA Section 4.3.1.2 did not specify which of the RVI components at Waterford 3 were evaluated with metal fatigue TLAAs or fatigue waiver TLAAs. Therefore, the staff could not establish whether the lower flange weld in the core support barrel assembly or the core support plate in the lower support structure will be inspected in accordance with the EVT-1 condition monitoring criteria specified for these components in Table 4-2 of the MRP-227-A report. The applicant will need to provide additional clarifications on whether these components will be inspected in accordance with the criteria in the MRP-227-A report during the period of extended operation.

  • Monitoring and Trending Element. The staff observed that the monitoring and trending program element discussion in the LRA AMP did not address the monitoring and trending criteria in the last two paragraphs of the corresponding program element in GALL Report AMP XI.M16A, which include criteria for performing flaw evaluations of both non-redundant and redundant RVI components. During the audit, the applicant stated that consistency with the last two paragraphs in the monitoring and trending program element of GALL Report AMP XI.M16A is addressed by a statement in the basis document that inspections and flaw evaluations of the RVI components are performed in accordance with MRP-227-A, as supplemented by guidelines and criteria in Technical Report No. WCAP-17096-NP, Revision 2. The staff reviewed WCAP-17096-NP, Revision 2, as well as the associated safety evaluation for the report and determined that the monitoring and trending criteria for performing potential flaw evaluations are appropriately addressed in the MRP-227-A and WCAP-17096-NP, Revision 2, reports and the applicants commitments for implementing the Reactor Vessel Internals Program. The staffs issue on this matter is resolved.
  • Monitoring and Trending Element and Response to A/LAI #7 on the Methodology for Implementing MRP-227-A. In A/LAI #7, the staff requested that the applicants/licensees of CE-designed reactors develop plant-specific analyses of any lower support columns made from cast austenitic stainless steel (CASS) materials to demonstrate that the components will maintain their functionality during the period of extended operation. The staff also applied these recommendations for additional RVI components that may be fabricated from CASS, martensitic stainless steel, or precipitation hardened stainless steel materials. In the LRA, AMR items for the control element assembly (CEA) shroud extension shaft guide and the CEA shroud assembly tubes, the applicant identified that the components are fabricated from CASS materials. The applicant identifies that these components are evaluated in the EPRI MRP-191 report, but under the assumption that the components are made from wrought stainless steel materials.

During the audit, the applicant provided the staff with an industry-issued technical report (PWROG-15032-NP) that evaluated any CASS RVI components for susceptibility to loss of fracture toughness induced by thermal aging embrittlement. The report indicates that all of the RVI components are made from CASS CF8 materials with sufficiently low levels of ferrite and molybdenum. The staff verified that the report demonstrates that CF8 materials used for fabricating these CASS components are not susceptible to thermal aging embrittlement because the ferrite and molybdenum contents of the materials are lower than those cited in NRC License Renewal Issue Document No. 98-0030 for rending a CASS component as being potentially susceptible to a thermal embrittlement aging mechanism. The staff also verified that Technical Report No. PWROG-15032-NP was endorsed in a safety assessment issued by the staff.

Therefore, the staff confirmed that the applicant has provided sufficient demonstration that any CASS components included in the RVI design are not susceptible to thermal aging embrittlement. The staffs issue on this matter is resolved.

The action in A/LAI #7 also requests that the applicant evaluate any RVI components that are potentially fabricated from either martensitic or precipitation-hardened stainless steel materials. During the audit, the staff confirmed that the applicant did not have any components fabricated from martensitic or precipitation-hardened stainless steel.

The staffs issue on this matter is resolved.

  • Acceptance Criteria Element. The acceptance criteria program element of the LRA AMP states that the acceptance criteria are consistent with Section 5 and Table 5-1 of MRP-227-A. The GALL Report AMP states that Section 5 of MRP-227-A includes Table 5-1 for B&W-designed RVIs, Table 5-2 for CE-designed RVIs, and Table 5-3 for Westinghouse-designed RVIs. It is not clear to the staff that these statements are consistent because the applicant references the applicable table for B&W components (Table 5-1) instead of that for CE components (Table 5-2).
  • Acceptance Criteria Element. In its response to A/LAI #5 on the MRP-227-A report, the applicant identified the acceptance criteria for the gap between the interfacing plates of the core shroud upper and lower subassemblies. However the applicant did not provide the source used to determine the acceptance criteria. During the audit, the staff confirmed that the source used to establish the acceptance criteria for the gap area in the core shroud is appropriately addressed in Technical Report No. WCAP-17096-NP, Revision 2. The staffs issue on this matter is resolved.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience, including operating experience reported in the MRP-227-A report or in industry alert letters for PWR RVI components.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, and parameters monitored or inspected program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M16A. The staffs evaluation of aspects of the program element associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined. In addition, the applicants responses to A/LAI #2 in the LRA require additional information.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.34, Reactor Vessel Surveillance Summary of Information in the Application. The LRA states that AMP B.1.34, Reactor Vessel Surveillance, is an existing program that is consistent with the program elements in GALL Report AMP XI.M31, Reactor Vessel Surveillance. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: capsule, vessel surveillance, vessel material, withdrawal schedule, removal schedule, and Appendix H.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00006 Waterford 3 License Renewal Project Aging Management Revision 0 Program Evaluation Results - Class 1 Mechanical, Section 4.6, Reactor Vessel Surveillance Program
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.1.24, Reactor Vessel Surveillance
3. CEP-FTP-W3 Reactor Vessel Fracture Toughness and Surveillance Material Revision 0, Testing at Waterford 3 07/17/2007
4. WCAP-18002-NP Waterford Unit 3 Time-Limited Aging Analysis on Reactor Vessel Revision 0, Integrity June 2015
5. WCAP-17969-NP Analysis of Capsule 83 from the Entergy Operations, Inc. Revision 0, Waterford Unit 3 Reactor Vessel Radiation Surveillance Program April 2015
6. WCAP-16002 Analysis of Capsule 263 from the Entergy Operations Waterford Revision 0, Unit 3 Reactor Vessel Radiation Surveillance Program March 2003
7. WCAP-16088-NP Waterford Unit 3 Reactor Vessel Heatup and Cooldown Limit Revision 1, Curves for Normal Operation September 2003
8. CR-WF3-2015- Required Reporting of Reactor Vessel Material Surveillance 07/22/2015 04833 Program (FSAR 5.3.1.6) Related to WCAP-17969-NP for Capsule 83
9. CR-WF3-2015- Update FSAR 5.3-10 To Include the Actual Removal EFPY and 08/24/2015 01196, CA 145 Fluence for Capsule 83 and the Target Removal EFPY and Fluence for Capsule 277 as Provided by the TLAA Report WCAP-18002-NP, Revision 0
10. LR-LAR-2016- Update FSAR 5.3-10 To Include the Actual Removal EFPY and 03/21/2016 00015, CA 19 Fluence for Capsule 83
11. LR-LAR-2016- Update the Target Removal EFPY and Fluence for Capsule 277 03/21/2016 00015, CA 20 as Provided by the TLAA Report WCAP-18002-NP, Revision 0 (NRC approval is required)
12. CR-WF3-2013- RF-001-016, Reactor Surveillance Capsule Assemblies, 04/22/2013 01996 Referenced the Incorrect Capsule Location to Be Removed at 26 EFPY

Document Title Revision/Date

13. CR-WF3-2004- Need to Officially Request NRC Approval To Implement the 03/10/2004 00734 Revised Vessel Specimen Withdrawal Schedule (Withdrawal of the third capsule at 26 EFPY)
14. W3F192-0094 GL 92-01, Revision 1, Response 07/06/1992
15. C-PENG-ER-004 Revision 0, Reactor Vessel Group Record Evaluation Program Revision 0, Phase II Final Report for the Waterford 3 Reactor Pressure October 1995 Vessel Plates, Forging, Welds and Cladding, Page 124 During the audit of program elements 1 through 6, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the scope of program and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.
  • The detection of aging effects program element of the GALL Report AMP recommends withdrawal and testing of one capsule at an outage in which the capsule receives a neutron fluence of between one and two times the 60-year peak reactor vessel fluence.

The GALL Report also states that, in accordance with 10 CFR Part 50, Appendix H, an applicant submits its proposed withdrawal schedule for approval before implementation.

During the audit, the staff noted that the applicant identified a need to withdraw and test Capsule 277 at 48 effective full-power year (EFPY) to represent the fluence exposure for the period of extended operation. In contrast, the applicant did not submit a withdrawal schedule for this capsule for NRC approval. Additional information is necessary because the absence of a staff-approved withdrawal schedule for this capsule is not consistent with the GALL Report AMP.

  • The scope of program program element of the GALL Report AMP states that the program includes all reactor vessel beltline materials as defined by 10 CFR Part 50, Appendix G, Section II.F. LRA Section 4.2.1 and Table 4.2-1 identify the reactor vessel beltline materials that are exposed to 60-year (55-EFPY) fluence greater than 1x1017 n/cm2 (E > 1 MeV). Specifically, LRA Table 4.2-1 indicates that 55-EFPY fluence for the upper shell plates and welds at the clad/metal interface is 5.82x1017 n/cm2 (E > 1 MeV).

The 40-year (32-EFPY) fluence for these upper shell materials is approximately estimated as 3.37x1017 n/cm2 (E > 1 MeV) by linear interpolation, which suggests these materials are also identified as beltline materials for 32 EFPY. In contrast, these upper shell materials are not identified as beltline materials in the evaluation for the 32-EFPY pressure-temperature (P-T) limits described in WCAP-16088-NP, Revision 1, including Table 2-2. Clarification is needed to reconcile this potential inconsistency in identifying these upper shell plates and welds as beltline materials between the 32-EFPY evaluation and 55-EFPY evaluation.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff found that sufficient information was not available to determine whether the description provided in the FSAR supplement was an adequate description of the LRA AMP. In order to obtain the information necessary to verify the sufficiency of the FSAR supplement program description, the staff will consider issuing an RAI for the subject discussed below.

  • Table 3.0-1 of SRP-LR, Revision 2, includes an example FSAR supplement for the summary description of an aging management program consistent with GALL Report AMP XI.M31, Reactor Vessel Surveillance. In contrast with the FSAR supplement in SRP-LR, Revision 2, the staff noted that the LRA Section A.1.34 does not include the following important attributes of the program: (a) any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the staff before the implementation, and (b) untested capsules placed in storage must be maintained for future insertion. Additional information is necessary to resolve this concern.

Audit Results. Based on this audit, the staff verified that the preventive actions, parameters monitored or inspected, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M31. The staff also identified certain aspects of the scope of program and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.35, Selective Leaching Summary of Information in the Application. The LRA states that AMP B.1.35, Selective Leaching, is a new program that will be consistent with the program elements in GALL Report AMP XI.M33, Selective Leaching, as modified by LR-ISG-2011-03, Changes to the Generic Lessons Learned (GALL) Report Revision 2 Aging Management Program XI.M41, Buried and Underground Piping and Tanks. To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document and a search of plant-specific operating experience. Issues identified but not resolved in this report will be addressed in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: dealloy, degraph, dezinc, leach, and zinc.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results Non-Class 1 Revision 0 Mechanical, Selective Leaching
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.2.11, Selective Leaching During the audit of program elements 1 through 7, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. For the corrective actions program element, sufficient information was not available to determine whether it was consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether this program element is consistent with the corresponding program element of the GALL Report AMP, the staff will consider issuing an RAI for the subject discussed below.
  • The program description of the LRA AMP states [f]ollow-up for unacceptable inspection findings includes an evaluation using the corrective action program and possible expansion of the inspection sample size and location. The corrective actions program element of the GALL Report AMP recommends that, [u]nacceptable inspection findings result in additional inspection(s) being performed, which may be on a periodic basis, or in component repair or replacement. It is not clear to the staff that these statements are consistent because GALL Report AMP XI.M33 recommends that additional inspections be conducted when inspections result in unacceptable results; whereas, the LRA AMP states there might be additional inspections. This issue also impacts the LRA FSAR description of the Selective Leaching program.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. With the exception of the issue identified in the corrective actions program element, above, the staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M33, as modified by LR-ISG-2011-03. The staff also identified certain aspects of the corrective actions program element of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff identified a need for additional information regarding the adequacy of the program description in the FSAR supplement.

LRA AMP B.1.36, Service Water Integrity Summary of Information in the Application. The LRA states that AMP B.1.36, Service Water Integrity, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M20, Open-Cycle Cooling Water. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP and their evaluation will be documented in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff walked-down portions of Wet Cooling Towers, Dry Cooling Towers, and other portions of the CCW and auxiliary component cooling water (ACCW) systems. The staff also conducted an independent search of the applicants operating experience database using keywords: corr, erosion, cavit, foul, mic, service water, and leak.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00002 Operating Experience Review Results - Aging Effects Requiring Revision 0 Management
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.1.25 Service Water Integrity
3. WF3-EP-14-00007 AMP Evaluation Results - Non-Class 1 Mechanical, Section 4.12 Revision 1 Service Water Integrity
4. WF3-ME-14-00009 Aging Management Review of the Component Cooling and Revision 1 Auxiliary Component Cooling Water Systems
5. EN-DC-184 NRC GL 89-13 Service Water Program Revision 3
6. EN-DC-340 Microbiologically Influenced Corrosion Revision 3
7. SEP-HX-WF3-001 GL 89-13 Heat Exchanger Test Basis Revision 0
8. W3F1-93-01 GL 89-13 Implementation Confirmation Letter 1/29/1993
9. W3P90-0207 GL 89-13 Response 1/29/1990
10. PE-004-021 CCW Heat Exchanger Performance Test Revision 4
11. PE-004-033 Wet Cooling Tower Thermal Performance Test Report 2/27/2014
12. W3-DBD-4 Component Cooling Water Auxiliary Component Cooling Water, Revision 303 Design Basis Document
13. PMID 00005814-01 Inspect Cooling Towers N/A
14. WO 52506463 01 ACCMTWR0001 A Inspect Basin and Submerged Components, 11/18/2015 PMID 00005814-04
15. PMRQ 34924-01 Create New PM To Open/Close Valves CW MVAAA402, N/A CW MVAAA403A&B Once Every Refuel
16. Isometric Blowdown Heat Exchanger Line No. 7CW16-31 0 No. 22000

Document Title Revision/Date

17. Flow Diagram Miscellaneous Reactor Auxiliary System Revision 15 G164 Sheet 5
18. CR-WF3-2007- WF3 may not be in compliance with PE-004-015, GL 89-13 Heat N/A 02364 Exchanger Test Basis for EDGs.
19. CR-WF3-2007- PMRQ561-02 & 5562-02 (remove spool piece between ACC127B N/A 01084 and ACC126B and inspect piping for erosion)
20. CR-WF3-2008- Algae seen exhausting from Wet Cooling Tower B fans when N/A 04388 fans started.
21. CR-WF3-2009- CCW HxB thermal performance analysis indicates a degrading N/A 00599 trend (12/9/2008 vs 12/11/2001).
22. CR-WF3-2009- Cavitation erosion, incipient cavitation damage in valve body N/A 00614 ACC-126A. Same as CR-WF3-2009-00852 for valve 126.
23. CR-WF3-2009- Blockage due to sediment when opening drain line ACC-120B. N/A 00843
24. CR-WF3-2009- Severe piping corrosion on pipe directly above ACC water basin. N/A 01622
25. CR-WF3-2009- External corrosion of CMU supply piping to Wet Cooling Tower A. N/A 01717
26. CR-WF3-2011- Dried dark green filmy material in small pieces were observed N/A 06856 collecting on the ground at the +21 elevation outside the WCT B.
27. CR-WF3-2012- While performing fill and vent of ACCW B train, valve N/A 06401 ACCMVAAA122B was clogged and could not be used for venting.
28. CR-WF3-2013- Damage to WCT fill. WCT A fill had experienced damage N/A 01106 previously as documented in CR-WF3-2003-0090 and CR-WF3-2005-0182.
29. CR-WF3-2014- Identified a leak from one of the tubes in Dry Cooling Tower B. N/A 004930 The cause of this leak was determined to be external corrosion.
30. CR-WF3-2014- Apparent Cause Evaluation Dry Cooling Tower B Bundle #1 Tube 0 004930 Leak
31. CR-WF3-2015- On 1/24/15, several Dry Cooling Tower tube bundles were N/A 00463 inspected as part of Extent of Condition.
32. CR-WF3-2015- Drain valves ACC-120/1201B and ACC-118B are clogged. N/A 00756
33. CR-WF3-2015- Aug-3-2015 black paper-like substance floating down into the N/A 05067 WCT A basin.
34. CR-WF3-2015- Piping downstream of ACC-137A inside ACC A basin has N/A 08543 corroded to the point that welding cannot be performed as planned.

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the monitoring and trending and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. However, the staff found that for the scope of program, preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these

program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

The ACCW system includes distribution nozzles in the Wet Cooling Tower that are being managed for loss of material. However, the piping upstream of the flow nozzles is periodically wetted and dried during various operational modes that can promote more aggressive internal corrosion and can lead to flow blockage due to fouling. It is unclear to the staff whether flow blockage of the Wet Cooling Tower flow distribution nozzles needs to be managed by the Service Water Integrity program.

The nonsafety-related chemical addition and filtration system takes a suction from the Wet Cooling Tower basin but it has several siphon breaker holes to eliminate the potential for inadvertently removing water from the Wet Cooling Tower basin. This system is not within the scope of license renewal. It is unclear to the staff whether failure of the siphon breaker holes (i.e., flow blockage due to fouling) could prevent satisfactory accomplishment of an ACCW system intended function, requiring inclusion of a portion of the system to be within the scope of license renewal.

The Service Water Integrity program manages aging effects as described in Waterfords response to NRC GL 89-13. Waterfords response for Action III states that components from the ACCW system will be added to its Erosion/Corrosion program. The system susceptibility evaluation for Flow-Accelerated Corrosion program (previously called the Erosion/Corrosion program) shows that the ACCW system is excluded from that programs scope. It is unclear to the staff if and how the prior GL 89-13 commitment was changed and how the activities for Action III of GL 89-13 will be accomplished during the period of extended operation.

There are discrepancies between the program basis documents and the information in the LRA. Onsite program documentation for the ACCW system (WF3-ME-14-00009) states that the One-Time Inspection program will manage loss of material in the carbon steel circulating water intake piping. However, LRA Table 3.3.2-3, which addresses components for that system, does not show carbon steel piping as being managed by the One-Time Inspection program. In addition, LRA Table 3.3.2-3 shows that carbon steel piping with internal coatings will be managed for loss of material and coating integrity by the Coating Integrity program. However, WF3-ME-14-00009 does not include the Coating Integrity program as managing components in the ACCW system.

In addition, in order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.

The Service Water Integrity program manages aging effects as described in Waterfords response to GL 89-13 and includes an enhancement to monitor the ACCW basins for biological fouling by visual inspections and analysis of water for biological activity.

However, Waterfords response to GL 89-13 Action I states that it already monitors the ACCW basin for biological fouling by visual inspection and analysis of water for biological activity. It is unclear to the staff if and how the prior GL 89-13 commitment was changed, such that a new commitment to monitor the ACCW basins for biological fouling is needed for the period of extended operation.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by

known industry operating experience. However, the staff could not determine whether the applicant had adequately evaluated and incorporated the operating experience related to this program. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.

Condition report CR-WF3-2009-00843 documents blockage due to sediment for a drain line in the ACCW system. Although makeup water to the ACCW system is demineralized water and chemical corrosion inhibitors maintain a low corrosion rate, sufficient fouling appears to be present in some portions of the system to cause blockage. It was unclear to the staff whether prior changes were made to the Service Water Integrity program as a result of this operating experience in light of the need to enhance the program procedures for the period of extended operation to flush stagnant lines to ensure there is no blockage.

The staff also audited the description of the LRA AMP provided in the FSAR supplement in LRA Section A.1.36. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M20. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also identified certain aspects of the scope of program, preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. However, additional information is required to determine whether the applicant had adequately evaluated and incorporated the operating experience related to this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.37, Steam Generator Integrity Summary of Information in the Application. The LRA states that AMP B.1.37, Steam Generator Integrity, is an existing program that is consistent with the program elements in GALL Report AMP XI.M19, Steam Generators. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: steam generator, tubesheet weld, channel head, divider plate, and loose part.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. 5817-13787 Flange/Port Drawing Revision 0
2. 5817-13807 Recirculation Nozzle Drawing Revision 0
3. CEP-SG-001 Steam Generator Primary Side Examinations and Maintenance Revision 1
4. CEP-SG-002 Steam Generator Secondary Side Examinations and Revision 0 Maintenance
5. CEP-SG-003 Steam Generator Integrity Assessment Revision 1
6. ECR 0000016360 Waterford 3 - Steam Generator Strategic Plan 06/17/2014
7. ECR 0000017215 Generate a Degradation Assessment for RF19 First ISI Inspection 06/30/2014 of W3 Replacement SG per NEI 97-06 and EN-DC-317
8. EN-DC-317 Steam Generator Program Revision 8
9. SEP-SG-WF3-001 WF3 Steam Generator Program Revision 0
10. TM 1440-C396, Steam Generator Technical Manual Revision 1 Volume 2
11. WF3-EP-14-00003 Operation Experience Review Results - Aging Management Revision 0 Program Effectiveness During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M19.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.38, Structures Monitoring Summary of Information in the Application. The LRA states that AMP B.1.38, Structures Monitoring, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.S6, Structures Monitoring. To verify this claim of consistency, the staff audited the LRA AMP. Issues identified but not resolved in this report will be addressed in the SER. During the audit, the staff reviewed the enhancements associated with this AMP. The enhancements to the LRA AMP will be evaluated in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of the reactor auxiliary building, fuel handling building, dry and Wet Cooling Towers, shield building (exterior), and turbine building. The staff also conducted an independent search of the applicants operating experience database using keywords: concrete, steel, crack, corrosion, leak, SCC, ASR, settlement, rust, and leach.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00008 Aging Management Program Evaluation Report Civil/Structural Revision 1
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. EN-DC-150 Condition Monitoring of Maintenance Structures Revision 6, 11/21/2013
4. EN-MA-15 Maintenance Standard for Torque Applications Revision 3, 04/25/2014
5. EN-DC-178 System Walkdowns Revision 7, 11/21/2013
6. LOU 1564.723 [Specification] Structural Steel Seismic I & II Revision 16
7. W-CS-2003-001-00 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 10/09/2003
8. WF3-CS-11-00001 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 01/12/2011
9. WF3-CS-16-00006 Maintenance Rule Walkdown for Evaluation of Structures Revision 0, 05/11/2016
10. CR-WF3-2016-4480 Degraded Gap Seal on the Q-Deck 07/12/2016
11. CR-WF3-2016-4481 Corroded Bolt/Nut on the Column Near WCT B Basin Window 07/12/2016
12. CR-WF3-2016-4482 Exposed Rebar on the Concrete Wall Near the Passage From 07/12/2016 WCT B to DCT B
13. CR-WF3-2016-4484 Abandoned Pipe Penetrating the Shield Building Not Grouted 07/12/2016 and Exposed
14. CR-WF3-2015-00947 Ongoing Issue with the Identification, Evaluation, and 02/19/2015 Resolution of External Corrosion
15. CR-WF3-2006-00755 External Corrosion in Structural Steel, Equipment, and 2006 Component
16. UNT-006-032 Coating and Corrosion Program Revision 0
17. LOU-1564, G-780 Drawing: Turbine Area Column Schedules Revision 7, 07/03/1991
18. LOU-1564, G-793 Drawing: Turbine Building Sections & Details Revision 8 03/24/1983
19. LOU-1564, G-599 Drawing: Turbine Generator Pedestal Mat-Masonry Revision 5 06/19/1979

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements.

During the audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP. In addition, the staff found that for the preventive actions, parameters monitored or inspected, and detection of aging effects program elements, sufficient information was not available to determine whether they were consistent with the corresponding program elements of the GALL Report AMP. In order to obtain the information necessary to verify whether these program elements are consistent with the corresponding program elements of the GALL Report AMP, the staff will consider issuing RAIs for the subjects discussed below.

  • The parameters monitored or inspected, and detection of aging effects program elements of the GALL Report AMP X1.S6 recommend that high-strength (actual measured yield strength 150 ksi or 1,034 MPa) structural bolts greater than 1 inch (25 mm) in diameter be monitored for SCC, and that visual inspections be supplemented with volumetric or surface examinations to detect cracking. During the AMP audit, the staff noted that the applicant excluded managing the aging effects of SCC in high-strength structural bolts and stated, in part, that since molybdenum disulfide thread lubricants are not used at WF3, for structural bolting applications, SCC of high-strength structural bolting is not an aging effect requiring management at WF3. It is not clear to the staff that this statement is consistent because the GALL Report does not credit the molybdenum disulfide thread lubricant as the only contributor to the aging mechanism of SCC in high-strength bolts. Also the staff is not clear whether high-strength structural bolts greater than 1 inch in diameter are used in structural applications, or how supplemental examinations are performed for these bolts because the plants structural specifications and drawings do not preclude the use of high-strength structural bolts with diameter greater than 1 inch when specified or noted as such in the drawing details.

In order to verify that the enhancements will make the AMP adequate to manage the applicable aging effects, the staff will consider issuing an RAI for the subject discussed below.

  • The LRA AMP states an enhancement to the preventive actions program element. The enhancement states that the plant procedure will be revised to include preventive actions for storage of ASTM A325, ASTM F1852, and ASTM A490 bolting from Section 2 of Research Council on Structural Connections publication. The GALL Report AMP XI.S6 recommends that if structural bolting consists of ASTM A325, ASTM F1852, and/or ASTM A490 bolts, the preventive actions for storage, lubricants, and stress corrosion cracking potential discussed in Section 2 of RCSC (Research Council for Structural Connections) publication need to be used. During the AMP audit the staff noted that the applicant excluded the use of preventive actions for lubricants, and stress corrosion cracking potential and stated that a review of Section 2 of the RCSC publication concluded that only storage is address[ed] and the RCSC publication does not address the preventive actions for lubricants and stress corrosion cracking potential for these bolts (WF3-EP-14-00008, Revision 1.) It was not clear to the staff that these statements are consistent, and if the above enhancement is adequate to make the LRA AMP consistent, because (1) the enhancement description does not include the RCSC Section 2 preventive actions for lubricants and stress corrosion cracking potential, and (2) the related justification provided in the AMPER document appears to interpret the standard in a manner that is inconsistent with the consideration

in the GALL Report AMP. The staff also noted that this is a common issue across LRA AMPs B.1.6, Containment Inservice Inspection - IWE; B.1.16, Inservice Inspection -

IWF; and B.1.38, Structures Monitoring.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is generally bounded by known industry operating experience (e.g., no previously unknown or recurring aging effects were identified by the applicant or staff). However, the staff identified plant-specific operating experience in which corrosion of steel structures and components has been identified. The staffs evaluation of the identified plant-specific operating experience will be addressed in the SER. In order to obtain the information necessary to determine whether the applicants operating experience supports the sufficiency of the LRA AMP, the staff will consider issuing RAIs for the subject discussed below.

  • The staff reviewed condition reports CR-WF3-2006-00755, CR-WF3-2009-06945, and CR-WF3-2010-05582, which documented corrective actions to address several plant-specific operating experiences associated with corrosion on structural steel, supports, and components. The staff also reviewed CR-WF3-2015-00947, which summarizes the history (since January 2010) of several condition reports associated with the keyword corrosion. The corrective actions associated with this condition report resulted in further inspections of areas susceptible to external corrosion and the development of an external corrosion and coating inspection procedure (UNT-006-032) for safety-related systems and components. During the walkdowns, the staff also observed corroded bolts/nuts from a steel column, exposed concrete rebar, and structural steel with different levels of corrosion in several structures located outdoors (e.g., CR-WF3-2016-4481, CR-WF3-2016-4482.) Based on the staff review of this plant-specific operating experience and staff observed conditions during the audit walkdowns, it is not clear to the staff (1) how the structures monitoring program captures the operating experience (e.g., the existing corrosion concerns from recent inspections) and whether the conditions and operating experience at the plant is bounded by the conditions and operating experience for which the GALL Report program was evaluated in Section XI.S6, and (2) whether and how the structures monitoring program specified inspection frequency of 5 years remains adequate, considering the recent operating experience, to ensure no loss of intended functions during the period of extended operation for those structures with ongoing exterior corrosion concerns.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.S6. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER.

The staff also identified certain aspects of the preventive actions, parameters monitored or inspected, and detection of aging effects program elements of the LRA AMP for which additional information or additional evaluation is required before consistency can be determined.

Based on this audit, the staff also verified that the operating experience at the plant is generally bounded by the operating experience for which the GALL Report program was evaluated; however, the staff also found that additional information is required before a determination can be made regarding whether the applicants operating experience supports the sufficiency of the

LRA AMP. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.39, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS)

Summary of Information in the Application. The LRA states that AMP B.1.39, Thermal Embrittlement of Cast Austenitic Stainless Steel (CASS), is a new program that will be consistent with the program elements in GALL Report AMP XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS). To verify this claim of consistency, the staff audited the LRA AMP. At the time of the audit, the applicant had not yet fully developed the documents necessary to implement this new program, and the staffs audit addressed only the program elements described in the applicants basis document.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: CASS, cast, embrittlement, ferrite, thermal aging, and CF8.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-ME-14-00002 Aging Management Review of the Reactor Vessel Internals Revision 1, 1/12/2016
2. WF3-ME-14-00003 Aging Management Review of the Reactor Coolant System and Revision 1, Pressurizer 9/13/2015
3. WF3-EP-14-00006 Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Revision 0 (CASS) Program Book
4. CE NPSD-1214 Generic Aging Management Review Report - Reactor Coolant Revision 0 System During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit, the staff made the following observations:

  • The staff reviewed the applicants Generic Aging Management Report for the RCS and noted CASS components and piping with a ferrite content above the 20 percent criteria for susceptibility to thermal aging embrittlement. The staff further noted that there is one component with a ferrite content above 25 percent.
  • The staff reviewed the applicants Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) Program Book and confirmed that the applicant will evaluate flaws in accordance with ASME Section XI, Section IWB-3500 or IWC-3500 for CASS components with up to 25 percent ferrite content and will evaluate flaws for CASS

components with a greater than 25 percent ferrite content on a case-by-case basis using fracture toughness data.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M12.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

LRA AMP B.1.40, Water Chemistry Control - Closed Treated Water Systems Summary of Information in the Application. The LRA states that AMP B.1.40, Water Chemistry Control - Closed Treated Water Systems, is an existing program with enhancements that will be consistent with the program elements in GALL Report AMP XI.M21A, Closed Treated Water Systems as modified by LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Tanks, and Corrosion Under Insulation. To verify this claim of consistency, the staff audited the LRA AMP. During the audit, the staff reviewed the enhancements associated with this AMP and will document their evaluation in the SER.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. In addition, the staff conducted walkdowns of portions of the component cooling system, including heat exchangers, pumps, and the Dry Cooling Towers. The staff also conducted an independent search of the applicants operating experience database using keywords: biofoul, corr, eros, and treated.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00002 Operating Experience Review Results - Aging Effects Revision 0 Requiring Management
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness, Section 3.1.28 Water Chemistry Control - Closed Treated Water Systems
3. WF3-EP-14-00007 AMP Evaluation Results - Non-Class 1 Mechanical, Revision 1 Section 4.13 Water Chemistry Control - Closed Treated Water Systems

Document Title Revision/Date

4. CE-001-004 Periodic Analysis Scheduling Program Revision 315
5. CE-002-007 Maintaining CCW Chemistry Revision 305
6. CE-002-013 Maintaining Essential Services Chill Water Chemistry Revision 303
7. CE-002-014 Maintaining Supplementary Chill Water Revision 302
8. CE-002-019 Maintaining Diesel Generator Jacket Water Cooling Water Revision 301 Chemistry
9. CR-WF3-2006-02537 The Component Cooling Water flow rate to Containment Fan N/A Cooler D has degraded from approximately 975 gpm on 8/30/06 to approximately 640 gpm on 9/4/06.
10. CR-WF3-2007-02867 This condition report was written to document a very slight rise N/A in CCW Surge Tank Level.
11. CR-WF3-2007-03455 While performing cleaning activities on WO00116217, a pin N/A hole leak developed on pipe 7CC4-199.
12. CR-WF3-2014-00448 Leak identified in Dry Cooling Tower B Bundle 1B. N/A
13. CR-WF3-2014-004930 Identified a leak from one of the Dry Cooling Tower B. The N/A cause of this leak was determined to be external corrosion.
14. CR-WF3-2014-004930 Apparent Cause Evaluation Dry Cooling Tower B Bundle #1 Revision 0 Tube Leak
15. CR-WF3-2015-00463 On 1/24/15, several Dry Cooling Tower tube bundles were N/A inspected as part of Extent of Condition.

The staff conducted its audit of LRA program elements 1 through 6 based on the contents of the existing program as modified by the proposed enhancements. During the audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience and the applicant had adequately evaluated and incorporated the operating experience into this program.

The staff also audited the description of the AMP provided in the FSAR supplement in LRA Section A.1.40. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M21A, as modified by LR-ISG-2012-02. The staffs evaluation of aspects of the program elements associated with enhancements will be addressed in the SER. The staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated and the applicant had adequately evaluated and incorporated the operating experience into this program. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

- 100 -

LRA AMP B.1.41, Water Chemistry Control - Primary and Secondary Summary of Information in the Application. The LRA states that AMP B.1.41, Water Chemistry Control - Primary and Secondary, is an existing program that is consistent with the program elements in GALL Report AMP XI.M2, Water Chemistry. To verify this claim of consistency, the staff audited the LRA AMP.

Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The staff also conducted an independent search of the applicants operating experience database using the keywords: pH, fluoride, chloride, water chemistry, sampling, and dissolved oxygen.

The table below lists the documents that were reviewed by the staff and were found relevant to the audit. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

Relevant Documents Reviewed Document Title Revision/Date

1. WF3-EP-14-00007 Aging Management Program Evaluation Results - Non-Class 1 Revision 0 Mechanical
2. WF3-EP-14-00003 Operating Experience Review Results - Aging Management Revision 0 Program Effectiveness
3. CE-001-004 Periodic Analysis Scheduling Program Revision 315
4. CE-002-001 Maintaining Steam Generator Chemistry Revision 308
5. CE-002-002 Maintaining Condensate and Feedwater Chemistry Revision 305
6. CE-002-005 Maintaining Makeup Demineralizer Chemistry Revision 016
7. CE-002-006 Maintaining Reactor Coolant Chemistry Revision 314
8. CE-002-008 Maintaining Condensate Storage Pool Chemistry Revision 302
9. CE-002-009 Maintaining Boron Management System Chemistry Revision 301
10. CE-002-010 Maintaining Safety Injection Tank Chemistry Revision 17
11. CE-002-011 Maintaining Spent Fuel Pool Chemistry Revision 10
12. CE-002-020 Maintaining Primary Water Chemistry Revision 13
13. CE-002-025 Maintaining Refueling Water Storage Pool Chemistry Revision 14
14. CE-002-027 Maintaining Condensate Storage Tank and Demineralized Water Revision 10 Storage Tank
15. EN-CY-100 Conduct of Chemistry Revision 0
16. EN-LI-102 Corrective Action Program Revision 24
17. WF3-Chem-Sec- Strategic Secondary Water Chemistry Plan Revision 8 001-08
18. Program Basis Primary Strategic Water Chemistry Plan Revision 5 Document
19. CR-WF3-2010- Samples From Condensate Discharge Pump 01/12/2010 00192
20. CR-WF3-2007 Condensate Storage Pool Sample 09/26/2007

- 101 -

Document Title Revision/Date

21. CR-WF3-2007- Steam Generator Sulfate Concentration Trend 11/01/2007 03960
22. CR-WF3-2007- Steam Generator Samples Elevated 10/23/2007 03832
23. CR-WF3-2008- Oxygen Concentration at Indeterminate Amount in Make-Up 04/28/2008 01712 Water
24. CR-WF3-2008- Condensate Storage Tank Dissolved Oxygen Above Specification 05/29/2008 02625 Limit
25. CR-WF3-2009- Condensate Oxygen Exceeding Action Levels 05/26/2009 02539 During the audit of program elements 1 through 6, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding elements of the GALL Report AMP.

During the audit of the operating experience program element, the staffs independent database search found that the operating experience provided by the applicant is bounded by known industry operating experience.

The staff also audited the description of the LRA AMP provided in the FSAR supplement. The staff verified this description is consistent with the description provided in the SRP-LR.

Audit Results. Based on this audit, the staff verified that the scope of program, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, and acceptance criteria program elements of the LRA AMP are consistent with the corresponding program elements in GALL Report AMP XI.M2.

Based on this audit, the staff also verified that the operating experience at the plant is bounded by the operating experience for which the GALL Report program was evaluated. In addition, the staff verified that the description provided in the FSAR supplement is consistent with the description provided in the SRP-LR.

Staff Review of Select AMR Items Associated with Elastomeric and Polymeric Components Summary of Information in the Application. During the audit, the staff reviewed plant documentation associated with the following AMR items:

  • LRA Table 3.3.2-15-11, Component Cooling Water System, Nonsafety-Related Components Affecting Safety-Related Systems Summary of Aging Management Evaluation
  • LRA Table 3.3.2-8, Fire Protection - Water System Summary of Aging Management Evaluation Audit Activities. During its audit, the staff interviewed the applicants staff and reviewed onsite documents provided by the applicant. The table below lists the documents that were reviewed

- 102 -

by the staff and were found relevant to the review of these AMR items. These documents were provided by the applicant.

Relevant Documents Reviewed Document Title Revision/Date

1. LRA-G160 sheet 2 Flow Diagram Component Closed Cooling Water System Revision 0
2. WO 309583-01 Relocate Fire Hydrant 9 Shutoff and Isolation Valves per 09/10/2012 EC 35260 Audit Results. During the audit, the staff made the following observations:
  • The staff noted that drawing LRA-G160 sheet 2, location A-5, states that the CCW corrosion rate monitor is constructed of PVC piping. The monitor is located inside the plant and is not exposed to sunlight. The AMR items are cited in LRA Table 3.3.2-15-11.
  • The staff noted that WO 309583-01 step 4.33.1 states that the fire hydrant shutoff valve piping implemented by EC 35260 was embedded in controlled low-strength material.

The AMR item is cited in LRA Table 3.3.2-8.

LRA Section 4.1, Identification of Time-Limited Aging Analyses Summary of Information in the Application. LRA Section 4.1, Identification of Time-Limited Aging Analyses, provides the applicants methodology for identifying analyses, evaluations, assessments, or calculations that meet the definition of a TLAA in 10 CFR 54.3(a) and a summary of the results of the applicants TLAA search. LRA Section 4.1 also provides the applicants methodology for identifying regulatory exemptions that were granted in accordance with 10 CFR 50.12 based on a TLAA, as required by 10 CFR 54.21(c)(2).

Audit Activities. During its audit (July 25-29, 2016), the staff interviewed the applicants staff and reviewed onsite documentation provided by the applicant. The applicant is required by the criteria in 10 CFR 54.21(c)(2) to identify all exemptions that were granted based on a TLAA in accordance with the exemption acceptance provisions in 10 CFR 50.12. Prior to the AMP audit for the LRA, the staff reviewed the list of regulatory exemptions in the NRCs ADAMS database that were granted in accordance with the requirements of 10 CFR 50.12. The staff did not identify any regulatory exemptions that were based on a TLAA. Therefore, the staff did not perform an audit of the applicants basis for demonstrating compliance with the requirements in 10 CFR 54.21(c)(2).

The staff audited the information in LRA Section 4.1 to confirm if the applicant had omitted any analyses, evaluations, assessments, or calculations from the scope of the LRA that would need to be identified as TLAAs. The table below lists additional documents that were reviewed by the staff and were found relevant to the staffs audit of LRA Section 4.1. These documents were provided by the applicant or were identified in the staffs search of the applicants operating experience database.

- 103 -

Relevant Documents Reviewed Document and Number Title Revision/Date

1. Engineering Calculation Stress Report for Steel Containment Vessel1 Revision 0 No. ECC12-009
2. NUREG-0787 Safety Evaluation Report Related to the Operation of 07/1981 Waterford Steam Electric Station, Unit No. 3, Docket No. 50-382
3. ER-W3-99-0184 Weld Repair of Inconel Instrument Nozzles on the 03/08/2000, 00,-01, and -03 Pressurizer 10/13/2000, and 10/27/2000
4. ER-W3-99-0184-01 Weld Repair of Inconel Instrument Nozzles on the RCS Hot 03/09/2000 and

-00, -01 Legs 03/13/2000

5. ER-W3-99-0184 Repair of Inconel Alloy 600 Pressurizer Heater Sleeves 10/24/2000, 00, -01, -03, and -06, 10/27/2000, 09/19/2001, and 07/02/2003
6. Structural Integrity Fracture Mechanics Evaluation of Potential Remnant Crack Revision 2, Associates Report in Waterford-3 Pressurizer Small Bore Nozzles 2 10/05/2016 No. SIR-06-302
7. Structural Integrity Relaxation of Reactor Coolant Pump Flywheel Inspection Revision 0, Associates Report Requirement2 05/22/1995 No. SIR-94-080
8. Proprietary Structural Design Report for Preemptive Repairs of Pressurizer and Revision 3, Integrity Associates Report Hot Leg Alloy 600 Components, Waterford Steam Electric 12/10/2010 No. SIR-08-092-NPS Station, Unit2
9. ASME Section III ASME Boiler and Pressure Vessel Code, Division 1 1971 Edition The applicant is required to identify and evaluate all analyses, assessments, evaluations, or calculations (hence, termed as analyses) that qualify as TLAAs in accordance with requirements in 10 CFR 54.21(c)(1). As specified in 10 CFR 54.21(c)(1), analyses are TLAAs if they conform to all six of the criteria in 10 CFR 54.3(a) for defining TLAAs. During the audit, the staff reviewed the applicants methodology for identifying potential sources of TLAAs. The staff also reviewed generic, site-specific, and corporate-specific documents in the CLB that may include potential sources of TLAAs. For generic, site-specific, or corporate-specific documents that were determined to contain time-dependent analyses, the staff reviewed applicable analyses against the six criteria for TLAA identification, as defined in 10 CFR 54.3(a). The staffs evaluation of the methodology for identifying TLAAs and the TLAA results for the application will be provided in FSER Section 4.1. However, during the audit, the staff discussed the following topics with the applicant:

(a) topical or technical reports (TRs) that may contain potential TLAAs (b) evaluations of potential TLAAs associated with repair or crack-mitigation designs (e.g., half-nozzle repair designs or weld overlay repair or mitigation designs) for nickel alloy base metal or weld components in the RCPB 1

The fatigue waiver analysis for the SCV is described on pages 151 and 152 of the stress report.

2 Given the proprietary nature of Report No. SIR-08-092-NPS, the staff treated its audit review of Report Nos. SIR-06-302 and SIR-94-080 as a review of proprietary documents.

- 104 -

(c) whether the metal fatigue analyzes for large-bore, Class 1 valves in the CLB are TLAAs (d) whether the CLB includes a fatigue waiver analysis for metal containment structure and whether this analysis needs to be identified as a TLAA for the LRA (e) whether the cyclical loading analysis (i.e., fatigue flaw growth analysis) for reactor coolant pump (RCP) flywheels in the CLB needs to be identified as a TLAA The staffs audit assessments of these aspects of the LRA are given in the subsections that follow.

  • Review of Topical Reports That May Be Potential Sources of TLAAs In LRA Section 4.1.1, the applicant stated that the methodology for identifying potential sources of TLAAs included a review of WCAP reports that were issued by the Westinghouse Electric Company and are applicable to the CLB for Waterford 3. During the audit, the staff asked the applicant whether its review of TRs was limited only to WCAP reports issued by the Westinghouse Electric Company and whether the TR review statement in LRA Section 4.1 should be interpreted to mean that the applicant had reviewed all TRs included in the Waterford 3 CLB. The applicant noted that the statement in LRA Section 4.1 was intended to mean that the applicant had reviewed all applicable TRs that apply to the CLB. The applicant stated that the review also included but was not limited to TRs issued by the Combustion Engineering Company, its owners group, and other applicable vendors, such as Chicago Bridge and Iron-Work (CB&I)

Company or Structural Integrity Associates, Inc.

During the audit, the staff verified that the applicants review of applicable TRs included those from other vendor sources as discussed in the previous paragraph. Thus, the staff finds that the applicant adequately reviewed applicable TRs to identify TLAAs and the applicants review scope was not limited only to those issued by the Westinghouse Electric Company. The staff will document this audit result in Section 4.1 of the FSER for the LRA.

  • Design Analyses for Repaired or Mitigated Nickel Alloy Components in the RCPB During the audit, the staff verified that the following cyclical loading analyses for repaired or mitigated Alloy 600 base metal locations or Alloy 82/182 weld component locations in the RCBP were based on time-dependent assumptions that went beyond the period of extended operation (e.g., those given in the applicable Structural Integrity Associates reports for repaired instrumentation nozzles in the RCS hot legs or pressurizer, or repaired pressurizer heater sleeves). Specifically, the staff verified that the assessment of design transient cycles for the applicable flaw growth or fracture mechanics evaluations were based on a 45-year projection basis. Since Waterford 3 was licensed to operate in March 1985, the staff observed that these flaw evaluations would be TLAAs if the overlay modifications were installed between March 1985 and March 2000.

However, the staff verified that the applicant performed the repair activities after March 2000.

Since the repairs of these components were conducted after March 2000, the analyses are projected beyond the period of extended operation for Waterford 3 (i.e., 60 years of operation) and these analyses are not based on time-dependent assumptions defined by

- 105 -

the current operating period. Therefore, the staff finds that these analyses do not meet the third criterion in 10 CFR 54.3(a), and are not identified as TLAAs. The staff will document this audit result in FSER Section 4.1 for the LRA.

  • Metal Fatigue Analyses for Large Bore, Class 1 Valves in the RCPB The staff noted that FSAR Table 3.9-9 identifies that the plant design includes large bore (greater than 4-inch nominal point size (NPS)), Class 1 valves in the RCBP as follows:

(a) four 8-inch header-to-reactor coolant loop inboard containment isolation valves in the low pressure safety injection system, (b) four 12-inch safety injection tank outlet check valves, (c) four 12-inch safety injection header check valves, (d) two 14-inch reactor coolant loop shutdown cooling upstream suction isolation valves, and (e) two 14-inch reactor coolant loop shutdown cooling suction inboard containment isolation valves. The staff also noted that FSAR Section 3.9.1.1.2 indicates that the CLB for Waterford 3 includes applicable cyclical loading and transient analyses for these valves. However, the staff also observed that the applicant did not clearly address the cyclical loading analyses for these valves in the metal fatigue analysis section for ASME Code Class 1 components in the LRA (i.e., LRA Section 4.3.1 with its subsections).

During the audit, the staff asked the applicant to clarify whether LRA Section 4.3.1 includes a metal fatigue analysis for the ASME Class 1, large bore valves. The applicant explained that the metal fatigue analyses for the ASME Code Class 1, large bore valves are included in LRA Section 4.3.1.7 because the valves are considered piping components. The staff reviewed the information in LRA Section 4.3.1.7 to verify the validity of this statement by the applicant.

The staff observed that the cyclical loading analyses (i.e., fatigue analyses) for the Class 1 piping components are discussed in FSAR Section 5.4.3. Similarly, the cyclical loading analyses for Class 1, large bore valves are discussed in FSAR Section 5.4.12.

The staff also noted that, although LRA Section 4.3.1.7 appropriately discusses the fatigue analyses for the piping consistent with the information in FSAR Section 5.4.3, including the applicants basis for accepting these analyses in accordance with 10 CFR 54.21(c)(1)(iii), the LRA section does not reference the metal fatigue analysis (i.e., cyclical loading and design transient assessment) for the large bore, Class 1 valves that is included in FSAR Section 5.4.12. Therefore, during the exit meeting for the audit (July 28, 2016), the staff informed the applicant that the LRA does not include the appropriate metal fatigue TLAA for the ASME Code Class 1, large bore valves in LRA Section 4.3.1.7 because the section does not make any reference to the assessment in FSAR Section 5.4.12. The staff informed the applicant that an administrative amendment will need to be made to LRA Section 4.3.1.7 to reference the metal fatigue analyses for the large bore, Class 1 valves and the assessment of these valves in FSAR Section 5.4.12. The staff will consider issuing an RAI on this matter and will document this in Sections 4.1 and 4.3.1.7 of the FSER.

  • Fatigue Waiver Analysis for the Metal Containment Vessel During the audit, the staff noted that the applicants CLB includes a fatigue waiver analysis for the metal containment vessel as performed to demonstrate conformance with the six criteria for fatigue waiver specified in the ASME Code Section III, paragraph NB-3222.4 (d). The staff identified that the applicable analysis is included in the stress analysis for the metal containment vessel, as performed by the Chicago

- 106 -

Bridge and Iron-Works Company (CBI) on behalf of the applicant. The staff also reviewed the fatigue waiver analysis and verified that the analysis was not based on any time-dependent assumptions defined by the current operating period. Therefore, the staff has confirmed that the fatigue waiver analysis for the metal containment vessel does not conform to the third Criterion in 10 CFR 54.3(a) and, therefore, is not identified as a TLAA for the LRA. The staff will document this determination in Section 4.1 of the FSER for this LRA.

  • Fatigue Flaw Growth Analysis for the Reactor Coolant Pump Flywheels As part of the audit activities, the staff reviewed the vendor report that was used to assess the structural integrity of the RCP flywheels in the plant design. The staff verified that the fatigue flaw growth analysis included in the report assessed flaw growth in the flywheels using a number of pump startup-shutdown cycles more than two times the number of pump startup-shutdown cycles assumed in the 40-year plant design. Based on this review, the staff has confirmed that the fatigue flaw growth analysis for the RCP flywheels is not based on time-dependent assumptions defined by the current operating period, as the time frame for assessing cycles in the analysis extends beyond the proposed 60-year period of extended operation. Therefore, the staff determined that the applicant has provided an adequate basis in the LRA for concluding that this analysis does not meet the criteria for the definition of a TLAA in 10 CFR 54.3(a). The staff will document this topic and the related discussion in Section 4.1 of the FSER for this LRA.

Audit Results. Based on this audit, with the exception of the metal fatigue analyses (i.e., cyclical loading and design transient analyses) for the large bore, Class 1 valves, the staff has verified that the applicant has implemented a sufficient methodology for identifying TLAAs in the LRA, and has identified all applicable TLAAs in the LRA, as required by 10 CFR 54.21(c)(1).

The staff is considering the issuance of an RAI to resolve the administrative TLAA identification issue for large bore, Class 1 valves at the plant.