| Issue date | Site | Title | Topic |
---|
ML24298A020 | 24 October 2024 | Byron Braidwood | NRR E-mail Capture - Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, Relief Request I4R-19 and I4-26, Associated with the Fourth and Fifth Inservice Inspection Intervals | |
RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals | 10 October 2024 | Byron Braidwood | Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals | VT-2 Affidavit |
ML24190A041 | 5 July 2024 | Summer | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML24190A046 | 5 July 2024 | Oconee | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML23324A430 | 20 November 2023 | Millstone | Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 | Boric Acid Weld Overlay Nondestructive Examination Aging Management Stress corrosion cracking License Renewal Liquid penetrant Dissimilar Metal Weld |
ML23208A095 | 28 August 2023 | Point Beach | Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach | Boric Acid High winds Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Temporary Modification Finite Element Analysis FLEX Large early release frequency Stress corrosion cracking Exemption Request Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Core Exit Thermocouple Water hammer |
ML23032A318 | 31 July 2023 | | Rulemaking - Proposed Rule - Unofficial Redline of Proposed Rule Language for American Society of Mechanical Engineers 2021-2022 Code Editions Update | Safe Shutdown Stroke time Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Moisture barrier Earthquake Power-Operated Valves Dissimilar Metal Weld Weak link |
ML23193A877 | 28 June 2023 | Millstone | 1 to Updated Final Safety Analysis Report, Chapter 15, License Renewal | Boric Acid Fire Barrier Coatings Aging Management Flow Accelerated Corrosion Feedwater Heater Stress corrosion cracking License Renewal Biofouling Fire Protection Program Dissimilar Metal Weld Overspeed Operational leakage |
ML23139A147 | 5 June 2023 | Salem | Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage | Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld Unidentified leakage Thermal fatigue |
RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | 4 May 2023 | Oconee | Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | Weld Overlay Nondestructive Examination Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld |
L-2023-009, Owners Activity Report | 31 January 2023 | Saint Lucie | Owners Activity Report | |
ML22300A220 | 27 October 2022 | Summer | (VCSNS) Unit 1, Alternative Request Rr-4-26 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) RAI | Boric Acid Stress corrosion cracking Dissimilar Metal Weld Unidentified leakage Unidentified leak Operational leakage |
ML22193A076 | 23 June 2022 | Millstone | 0 to Updated Final Safety Analysis Report, Chapter 15, License Renewal | Boric Acid Fire Barrier Coatings Aging Management Flow Accelerated Corrosion Feedwater Heater Stress corrosion cracking License Renewal Biofouling Fire Protection Program Dissimilar Metal Weld Overspeed Operational leakage |
ULNRC-06690, Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138) | 27 January 2022 | Callaway | Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138) | Unanalyzed Condition Boric Acid Time of Discovery High winds Non-Destructive Examination Mission time Weld Overlay Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Incorporated by reference High Energy Line Break Aging Management Surveillance Frequency Control Program Foreign Material Exclusion Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking License Renewal Exemption Request Dissimilar Metal Weld Scaffolding Unidentified leakage Affidavit Operational leakage Thermal fatigue Water hammer |
SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan | 4 January 2022 | Seabrook | Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Aging Management Stress corrosion cracking Eddy Current Testing License Renewal Liquid penetrant Dissimilar Metal Weld Scaffolding Flow Induced Vibration Operability Assessment Thermal fatigue Water hammer |
ET 21-0005, Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 | 12 August 2021 | Wolf Creek | Operating Corp., License Amendment Request for a Risk-Informed Resolution to GSI-191 | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Mission time Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Operating Basis Earthquake FLEX High Energy Line Break Foreign Material Exclusion Large early release frequency Stress corrosion cracking Operability Determination Severe Accident Management Guideline Exemption Request Earthquake Maintenance Rule Program Fuel cladding Scaffolding Core Exit Thermocouple Manual Operator Action Operational leakage Water hammer |
ML21197A043 | 15 July 2021 | Summer | VCS ISI 2021004 RFI - Combined | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21197A042 | 15 July 2021 | Vogtle | Vog U1 Isi/Sgisi Request for Information (RFI) Letter | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21197A045 | 15 July 2021 | Watts Bar | WBN U1 Isi/Sgisi Request for Information (RFI) Letter | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21144A109 | 20 May 2021 | South Texas | Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Abnormal operational transient Surveillance Frequency Control Program Stress corrosion cracking Moisture barrier License Renewal Control of Heavy Loads EVT-1 Pressure Boundary Leakage Dissimilar Metal Weld Core Exit Thermocouple Operability Assessment Thermal fatigue Water hammer |
NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | 20 May 2021 | South Texas | Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval | Safe Shutdown Boric Acid Non-Destructive Examination Weld Overlay Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Abnormal operational transient Surveillance Frequency Control Program Stress corrosion cracking Moisture barrier License Renewal Control of Heavy Loads EVT-1 Pressure Boundary Leakage Dissimilar Metal Weld Core Exit Thermocouple Operability Assessment Thermal fatigue Water hammer |
ML21124A037 | 4 May 2021 | Calvert Cliffs | Integrated Inspection Report 05000317/2021001 and 05000318/2021001 | Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment High Energy Line Break Moisture barrier Coronavirus Liquid penetrant Fire Protection Program Operability Assessment |
RA-20-0334, Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, - PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary | 4 May 2021 | Oconee | Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, - PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary | Weld Overlay Stress corrosion cracking Dissimilar Metal Weld |
ML20178A464 | 31 March 2021 | | Rulemaking: Proposed Rule: Unofficial Redline Strikeout of the Nrc'S Proposed Rule: Proposed Rule to Incorporate by Reference American Society of Mechanical Engineers Codes | Safe Shutdown Stroke time Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Flow Accelerated Corrosion Large early release frequency Stress corrosion cracking Moisture barrier Earthquake Power-Operated Valves Dissimilar Metal Weld |
ML21084A249 | 24 March 2021 | Harris | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML21021A002 | 28 January 2021 | Comanche Peak | Approval of Proposed Alternatives 1A4-1 and 1A4-2 from Certain Requirements of 10 CFR 50.55a for Inservice Inspection of Nuclear Power Plants | Boric Acid Nondestructive Examination Pandemic Coronavirus COVID-19 |
ML21019A451 | 19 January 2021 | North Anna | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
AEP-NRC-2021-01, Form OAR-1, Owner'S Activity Report | 14 January 2021 | Cook | Form OAR-1, Owner'S Activity Report | Boric Acid COVID-19 Pressure Boundary Leakage Power Uprate |
ML20338A393 | 3 December 2020 | Catawba | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML20253A117 | 5 October 2020 | Comanche Peak | Approval of Request for Alternative from Certain Requirements of 10 CFR 50.55a for Operation and Maintenance of Nuclear Power Plants (EPIDs L-2020-LLR-0063, L-2020-LLR-0064, and L-2020-LLR-0065 (COVID-19)) | Boric Acid Nondestructive Examination Pandemic Coronavirus COVID-19 Dissimilar Metal Weld Unidentified leakage |
ML20266G459 | 14 August 2020 | Watts Bar | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
ML20224A055 | 10 August 2020 | Comanche Peak | NRR E-mail Capture - Verbal Authorization of Comanche Peak Unit 1 Relief Requests 1A3-2, 1A4-1, and 1A4-2 (L-2020-LLR-0092 to L-2020-LLR-0094) | Boric Acid Stress corrosion cracking Pandemic COVID-19 Unidentified leakage |
ML20206K865 | 7 August 2020 | Beaver Valley | Relief Requests 2-TYP-4-RV-06 and 2-TYP-4-RV-07 from the Requirements of the ASME Code (EPID L-2020-LLR-0053 and EPID L-2020-LLR-0054 (COVID-19)) | VT-2 Stress corrosion cracking Eddy Current Testing Pandemic COVID-19 Pressure Boundary Leakage Pressure boundary leak Through-Wall Leak Unidentified leakage |
ML20216A539 | 6 August 2020 | Palo Verde | Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay | Weld Overlay Locked High Radiation Area Stress corrosion cracking License Renewal Pandemic Coronavirus COVID-19 Dissimilar Metal Weld Unidentified leakage Thermal fatigue |
ML20218A428 | 5 August 2020 | North Anna | Notification of Inspection and Request for Information | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion COVID-19 Liquid penetrant |
ML20290A586 | 23 July 2020 | Wolf Creek | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737, Clarification of TMI Action Plan Requirements | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Incorporated by reference High Energy Line Break Aging Management Pressure and Temperature Limits Report Stress corrosion cracking Eddy Current Testing License Renewal Commercial Grade Control of Heavy Loads Fuel cladding Biofouling Fire Protection Program Core Exit Thermocouple Thermography Loss of condenser vacuum Potassium iodide Control Room Habitability |
ML20196L827 | 14 July 2020 | Comanche Peak | Relief Request 1A4-2, Reactor Vessel (Rv) Bottom Mounted Instrumentation (Bmi) Nozzle Penetration Examination | Boric Acid Weld Overlay VT-2 Stress corrosion cracking Pandemic Coronavirus COVID-19 Pressure Boundary Leakage Unidentified leakage Operational leakage |
ML20111A014 | 27 April 2020 | Beaver Valley | Summary of March 31, 2020, Public Meeting with Energy Harbor Nuclear Corp. to Discuss COVID-19 Potential Submittals of Regulatory Actions | Pandemic COVID-19 |
ML20106F235 | 15 April 2020 | Comanche Peak | NRR E-mail Capture - Verbal Authorization of Comanche Peak Unit 2 Relief Requests 2A3-3, 2A3-4, and 2A3-5 (L-2020-LLR-0063, L-2020-LLR-0064, and L-2020-LLR-0065) | Boric Acid Nondestructive Examination Pandemic Coronavirus COVID-19 Dissimilar Metal Weld Unidentified leakage |
ML20100N322 | 9 April 2020 | Beaver Valley | Verbal Relief for Penetration Evaluation and Hot Leg Nozzles - Delivered 4/9/2020 at 10:00 Am | VT-2 Pandemic COVID-19 Unidentified leakage |
CP-202000263, Reactor Vessel Head, Bottom Mounted Instrumentation, and Hot Leg Ultrasonic Testing Examinations Relief Request | 9 April 2020 | Comanche Peak | Reactor Vessel Head, Bottom Mounted Instrumentation, and Hot Leg Ultrasonic Testing Examinations Relief Request | Boric Acid Weld Overlay VT-2 Stress corrosion cracking Pandemic COVID-19 Pressure Boundary Leakage Unidentified leakage Operational leakage |
L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections | 3 April 2020 | Beaver Valley | 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections | Stress corrosion cracking Pandemic COVID-19 Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld Unidentified leakage |
L-20-115, CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations | 2 April 2020 | Beaver Valley | CFR 50.55a Request Number 2-TYP-4-RV-07 for Bottom Mounted Instrumentation Penetration Examinations | Nondestructive Examination Stress corrosion cracking Pandemic COVID-19 Liquid penetrant Pressure Boundary Leakage Through-Wall Leak Unidentified leakage Operational leakage Pre-submittal |
ML20106E950 | 2 April 2020 | Catawba | 1 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities | Boric Acid Weld Overlay VT-2 Incorporated by reference Aging Management Foreign Material Exclusion Flow Accelerated Corrosion Stress corrosion cracking Eddy Current Testing License Renewal Through-Wall Leak Fire Protection Program Thermal fatigue |
ML20091M199 | 31 March 2020 | Palo Verde | NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay ISI Examinations | Weld Overlay Pandemic Coronavirus COVID-19 Dissimilar Metal Weld Unidentified leakage Thermal fatigue |
ML20091K075 | 31 March 2020 | Palo Verde | NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay Examination | Weld Overlay Pandemic COVID-19 |
ML20088A533 | 27 March 2020 | Palo Verde | Relief Request 65 - Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Line Weld Overlay Examination | Boric Acid Non-Destructive Examination Weld Overlay Locked High Radiation Area Feedwater Heater Stress corrosion cracking Eddy Current Testing Pandemic Coronavirus COVID-19 Dissimilar Metal Weld Unidentified leakage Operational leakage Pre-submittal |
ML20084Q180 | 24 March 2020 | Catawba | Notification and Request for Information | Boric Acid Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Coronavirus Liquid penetrant |
ML20056D559 | 13 March 2020 | Ginna | R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-02 for the Sixth 10-Year Inservice Inspection Interval | Thermal fatigue |
ML20055F886 | 13 March 2020 | Ginna | R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Alternative I6R-01 for the Sixth 10-Year Inservice Inspection Interval | Boric Acid Stress corrosion cracking |